Supercomputers/Systems/NIPA (Kakao)
South Korea · operational · ai training
NIPA (Kakao)
Operated by Kakao at Kakao (Ansan) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 69.10 PFlop/s
- Rpeak
- 78.65 PFlop/s
- Rmax ÷ Rpeak
- 87.9%
- Cores
- 36,720
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of NIPA (Kakao), and those in South Korea. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 69.10 PFlop/s | #30 of 158 · top 18% | #3 of 32 · top 6% |
| Rmax ÷ Rpeak | 87.9 % | #24 of 155 · top 15% | #4 of 32 · top 10% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Supermicro SYS-A22GA-NBRT | Supermicro | - | Reported | top500.org |
| Accelerator | NVIDIA B200 SXM Accelerators CUDA (Blackwell) · TSMC 4NP · 1,000 W 2,040 NVIDIA B200 GPUs (of a planned 2,424); omitted from TOP500's own listing | NVIDIA | - | Verified | top500.orgkakaocorp.com |
| CPU | Intel Xeon 6 6900P (Granite Rapids) CPUs x86-64 · 128C · 2 GHz · Intel 3 · 500 W Xeon 6960P 72C 2.7GHz | Intel | - | Reported | top500.org |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds Infiniband NDR400 | NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What NIPA (Kakao) runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 255 nodes255 nodes (2040 GPUs) installed, about 84 percent of the planned 2424 B200 allocation | 2025-12 | Operator stated | kakaocorp.com |
| Cooling design | Hot Aisle Containment System isolating hot exhaust air and routing it to cooling units, at Kakao Data Center Ansan | 2025-12 | Operator stated | kakaocorp.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Kakao Cloud platform with Kubeflow for model development, training, deployment and inference | 2025-12 | Operator stated | kakaocorp.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Ministry of Science and ICT (MSIT), Korea | 2025-12 | Operator stated | kakaocorp.com |
| Funding programme | Korean government GPU acquisition project run by the Ministry of Science and ICT and NIPA, five-year consignment to Kakao | 2025-12 | Operator stated | kakaocorp.com |
| Procurement | Kakao selected as final operator of the government GPU acquisition project in August 2025 to acquire 2424 NVIDIA B200 GPUs | 2025-12 | Operator stated | kakaocorp.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Compute allocated by MSIT and NIPA through public calls to industry, academic and research projects via the national AI computing resource portal | 2025-12 | Operator stated | kakaocorp.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 2,040 accelerators | 2025-12 | Operator stated | Kakao: infrastructure done for 255 nodes (2,040 B200 GPUs), about 84 percent of 2,424 planned, at Kakao Ansan data center. | kakaocorp.com |
The read
Kakao's share of the same NIPA national GPU program that also funds NHN Cloud's two clusters. TOP500's own record for this system is anomalous: it lists only a CPU (Intel Xeon 6960P) and no accelerator at all, an omission inconsistent with its Rpeak figure. Kakao's own corporate page and an independent Korean outlet (AI Times) both confirm 2,040 NVIDIA B200 GPUs; the core count recorded here is TOP500's own CPU-only figure, carried as-is rather than corrected, with the accelerator fact sourced independently.
Timeline
- 2025-08 Announced source
- 2025-08 Kakao was selected as the final operator of Korea's government GPU acquisition project source
- 2026-01 First operational source
- 2026-01-02 Beta service of the Kakao GPU cluster opened to MSIT and NIPA selected projects source
- 2026-06 Listed at #39 on the TOP500 (June 2026) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Nearby in scale
The machines closest to NIPA (Kakao) by Rmax, smaller to larger.
- NIPA(NHN Cloud)-CL-2 · South Korea, operational · 68.42 PFlop/s
- El Dorado · USA, operational · 68.02 PFlop/s
- Arrhenius · Sweden, operational · 66.82 PFlop/s
- ABCI-Q · Japan, operational · 74.58 PFlop/s
- Harpia · Brazil, operational · 75.2 PFlop/s
- Cassava AI Factory · South Africa, operational · 77.79 PFlop/s
Related systems
Same accelerator
- E2E Chennai B200 Cluster · India, operational
- Firebird Armenian AI Factory (DC-1) · Armenia, operational, 2026
- Industrial AI Cloud · Germany, operational, 2026
- Jairu · Brazil, operational, 2026
- Naver B200 4K Cluster · South Korea, operational, 2026
- Nexus (Georgia Tech) · USA, operational, 2026
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
Every source cited on this page was readable, and none of them mentions this system. They are cited at page granularity, normally because no stable deep link could be found. That is a real weakness in this row and it is why the system carries a confidence tier below verified. See how this check works.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | does not name this system | Intel Xeon 6 6900P (Granite Rapids), NVIDIA InfiniBand NDR (Quantum-2) |
| kakaocorp.com | does not name this system | NVIDIA B200 SXM |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.