COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Companies/Tallgrass Energy

Lakewood, CO, USA

Tallgrass Energy

Midstream energy company developing the Cheyenne Power Hub and the Project Jade AI data center campus near Cheyenne, Wyoming; Crusoe was the original data center partner before exiting in 2026.

Systems this company appears in

Systems
1
Aggregate Rmax
0.0 GFlop/s
systems it appears in
Aggregate power
0 kW
where disclosed
First appearance
2025-07
Most recent
2025-07
Concentration
-
largest is Project Jade (Cheyenne)

Aggregate Rmax is the sum of the systems this company supplies any part of. It is not revenue and not attributable share: an integrator and a memory vendor in the same machine both count its full FLOPS here. Attribution weighted by role is Phase 4.

Role breakdown

Role Systems Rmax in those systems
Integrator 1 0.0 GFlop/s

Appearances

System Supplied as Shipped under Rmax Rank
Project Jade (Cheyenne)
USA ·
Integrator Tallgrass Energy - unranked

AI datacenters operated

SystemStatusAcceleratorsStated power (MW)
Project Jade (Cheyenne) under construction - 2,700

Figures come from the AI datacenter metrics; blank means none recorded.

Sites operated

Site Location Cooling Commissioned
Project Jade Site (Cheyenne) Cheyenne, WY, USA - -

Further reading