Supercomputers/Systems/Hunter
Germany · operational · hpc
Hunter
Operated by HLRS at HLRS, University of Stuttgart .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 31.68 PFlop/s
- Rpeak
- 45.14 PFlop/s
- Rmax ÷ Rpeak
- 70.2%
- Cores
- 181,440
- Power
- 490 kW
- Per watt
- 64.7 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Hunter, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 31.68 PFlop/s | #64 of 202 · top 31% | #5 of 95 · top 4% |
| Energy efficiency | 64.7 GF/W | #7 of 99 · top 6% | #3 of 68 · top 3% |
| Rmax ÷ Rpeak | 70.2 % | #119 of 199 · bottom 41% | #54 of 94 · bottom 44% |
| Power draw | 490 kW | #56 of 104 · bottom 48% | #34 of 69 · top 49% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX4000 | Hewlett Packard Enterprise | - | Reported | hlrs.detop500.org |
| Accelerator | AMD Instinct MI300A Accelerators ROCm (CDNA 3) · TSMC N5/N6 · 550 W 752 AMD Instinct MI300A APUs | AMD | 752 reported | Reported | hlrs.detop500.org |
| CPU | AMD 4th Gen EPYC 24C (in MI300A) CPUs x86-64 · 24C · 1.8 GHz · TSMC N5 AMD 4th Gen EPYC 24C 1.8GHz | AMD | - | Reported | top500.org |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Reported | top500.orghlrs.de |
| Storage | HPE Cray ClusterStor E2000 Storage Cray ClusterStor E2000, 25 PB | Hewlett Packard Enterprise | - | Reported | hlrs.de |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid 100% fanless direct liquid cooling | Hewlett Packard Enterprise | - | Reported | hlrs.de |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription RHEL 9 | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What Hunter runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 444 nodes188 APU nodes with 752 AMD Instinct MI300A plus 256 CPU nodes with 512 AMD EPYC 9374F | 2025 | Operator stated | hlrs.de |
| Storage capacity | 25 PBCray ClusterStor E2000 on 2,120 disks | 2025 | Operator stated | hlrs.de |
| Interconnect and topology | HPE Slingshot 11 Dragonfly; APU nodes have 4 x 200 Gb/s | 2025 | Operator stated | hlrs.de |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | German Federal Ministry of Research, Technology and Space (BMFTR, formerly BMBF), through the Gauss Centre for Supercomputing | 2025 | Operator stated | hlrs.de |
| Funded by | Baden-Wuerttemberg Ministry for Science, Research and Arts, through the Gauss Centre for Supercomputing | 2025 | Operator stated | hlrs.de |
| Procurement | HPE awarded the contract covering Hunter and its exascale-class successor Herder, reported at EUR 115 million combined, December 2023Press figure; the article gives no separate Hunter cost and an earlier plan of 136 nodes versus the 188 APU nodes HLRS now lists | 2023-12 | Press report | nextplatform.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2025: debuted at number 12 on the June 2025 Green500; HLRS says its peak-power needs are about 80% lower than predecessor Hawk | 2025-06 | Operator stated | hlrs.de |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| IT power | 0.56 MW | 2026-10 | Operator stated | HLRS technical details: energy usage (average) 560 kW for the system. | hlrs.de |
The read
HLRS's HPE Cray EX with 752 AMD Instinct MI300A APUs, inaugurated in January 2025; first ranked 54th on the June 2025 TOP500, then 61st and 76th as newer systems overtook it. HLRS confirms the hardware, fanless direct liquid cooling and a 48.1 PFlop/s theoretical peak, which differs from TOP500's 45.14 because they are different measures. HLRS's own post says rank 53 in June 2025 against TOP500's 54; TOP500's is used. Rmax and power rest on TOP500 alone.
Timeline
- 2023-12 University of Stuttgart and HPE announced a EUR 115 million contract covering Hunter and the successor Herder source
- 2025-01 First operational source
- 2025-01-16 HLRS announced the inauguration of Hunter source
- 2025-06 Listed at #54 on the TOP500 (June 2025) source
- 2025-06 Hunter debuted at number 12 on the June 2025 Green500 source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
HLRS, University of Stuttgart
- Location
- Stuttgart, Germany
- Cooling
- Direct liquid cooling
- Commissioned
- 1996
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Rank in June 2025: 53rd (HLRS post) against 54th (TOP500). TOP500's figure is used.
- Node count: 188 APU nodes and 256 CPU nodes, 752 MI300A against 136 nodes and 544 MI300A (December 2023 plan). The 2023 plan was smaller than the operator describes today; the current HLRS figure is used.
Change history
- 2026-09-22 Gained a Green500 rank pointer (#12 on the 2025-06 list)
- 2026-09-20 Added with a rank pointer on the edition where it ranked highest
Nearby in scale
The machines closest to Hunter by Rmax, smaller to larger.
- Viper-GPU · Germany, operational · 31.1 PFlop/s
- Voyager-EUS2 · USA, operational · 30.05 PFlop/s
- Crossroads · USA, operational · 30.03 PFlop/s
- MUSICA · Austria, operational · 31.84 PFlop/s
- kakaocloud EPYC A100 Cluster · South Korea, upgraded · 32 PFlop/s
- Helma · Germany, operational · 32.22 PFlop/s
Related systems
Same site
- HammerHAI · Germany, under construction
- Hawk · Germany, decommissioned, 2020
- Hazel Hen · Germany, decommissioned, 2015
- Hermit · Germany, decommissioned, 2011
- Baku (HLRS) · Germany, operational, 2009
- HLRS NEC SX-8 · Germany, decommissioned, 2005
Same operator
- HWW Stuttgart NEC SX-4/32 · Germany, operational, 1996
- Herder · Germany, planned
Same accelerator
- bwUniCluster 3.0 · Germany, operational, 2025
- Cosmos (SDSC) · USA, operational, 2025
- Plasma Simulator Sosei · Japan, operational, 2025
- Tuolumne · USA, operational, 2025
- Viper-GPU · Germany, operational, 2025
- Adastra 2 · France, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| hlrs.de | names system, part and count | AMD Instinct MI300A, HPE Cray ClusterStor E2000 · counts: 752 |
| top500.org | names system and part | AMD Instinct MI300A, HPE Slingshot-11, HPE Cray ClusterStor E2000 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.