COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Muskogee (CoreWeave)

USA · under construction · ai training

Muskogee (CoreWeave)

Also known as Core Scientific Muskogee for CoreWeave

Operated by CoreWeave at Core Scientific Muskogee Data Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Core Scientific builds the 100 MW Muskogee HPC data center (70 MW critical IT load) and hosts CoreWeave
Core Scientific - Reported investors.corescientific.com
Accelerator -
NVIDIA GPUs hosted for CoreWeave; model and count not stated by Core Scientific
NVIDIA - Reported investors.corescientific.com

Engineering, funding and access

What Muskogee (CoreWeave) runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Cooling designAir-cooled chillers: Epoch AI counts 52 units with 87.5 MW capacityCounted from satellite imagery; Core Scientific's release does not describe cooling.2026-06Third-party estimateepoch.ai

Funding

ItemDetailAs ofBasisSource
ProcurementOne of the CoreWeave sites within about 500 MW of critical IT load contracted from Core Scientific, worth up to $8.7 billion over 12-year contracts with two five-year optionsPort Muskogee's director cites more than $4 billion of capital investment over the project's life.2024-11-18Operator statedinvestors.corescientific.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 36,000 accelerators 2027-12 Third-party estimate Epoch AI projection of about 36,000 B300 at full build (Q4 2027), with 153 MW projected; no chips operational yet and the press release names neither model nor count epoch.ai
Facility power 100 MW 2024-11 Operator stated Core Scientific: 100 MW total facility power including 30 MW of ancillary systems investors.corescientific.com
IT power 70 MW 2026-07 Operator stated Core Scientific Q2 FY26 deck (mid-July 2026): Muskogee about 70 MW leased to CoreWeave, substantially complete. investors.corescientific.com
IT power 70 MW 2024-11 Operator stated Core Scientific: 70 MW critical IT load for GPUs at the Muskogee site, expected operational in 2026 investors.corescientific.com

The read

Core Scientific's Muskogee, Oklahoma high-performance computing data center at Port Muskogee, broken ground on 18 November 2024 and expected to be operational in 2026. The press release gives 100 MW of total facility power, of which 70 MW is critical IT load for GPUs, hosting NVIDIA GPUs for CoreWeave, as one site of the roughly 500 MW of CoreWeave-contracted critical IT load Core Scientific announced at that point; it does not name the GPU model or count. CoreWeave is recorded as operator because it is the named tenant and Core Scientific is landlord, matching the Denton row. Epoch AI's AI data centers dataset (CC BY 4.0) shows the site under construction with building 1 construction finished by June 2026 and projects about 36,000 B300 chips, 70 MW by the end of 2026 and 153 MW by Q4 2027, which is larger than the press release's figure; Epoch's numbers are modelled estimates in the metrics table only. Reported tier.

Timeline

  • 2024-11-18 Announced source
  • 2026-06 Epoch AI sees Building 1 construction complete but not yet operational, with adjacent land cleared for power equipment source

Site & facility

Change history

Nearby in scale

The machines closest to Muskogee (CoreWeave) by accelerator count, smaller to larger.

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
epoch.ainames system only-
investors.corescientific.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading