COMPUTE ATLAS Supercomputer supply-chain graph
1540 systems 545 sites Sourced data

Supercomputers/Systems/Nxera DC Tuas

Singapore · operational · mixed

Nxera DC Tuas

Also known as Singtel RE:AI Tuas

Operated by Nxera at Tuas Nxera Site .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Nxera DC Tuas, 58 MW of AI-ready capacity
Nxera
- Reported techwireasia.comtools.prnewswire.com
Accelerator -
NVIDIA GB200 systems at around 200 kW per rack
NVIDIA - Reported techwireasia.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Rack power 200 kW 2026-02 Operator stated Nxera currently runs NVIDIA GB200 systems at around 200 kW per rack techwireasia.com

The read

Singtel's Nxera opened DC Tuas in Singapore on 9 February 2026, adding 58 MW of AI-ready capacity and taking its Singapore footprint to 120 MW; more than 90 percent was committed to customers before opening, none named. Nxera runs NVIDIA GB200 systems at around 200 kW per rack, and Singtel's RE:AI GPU-as-a-service cloud offers H100 and GB200 with GB300 planned for 2026. A Frost and Sullivan release of 24 October 2025 still described Tuas as a 58 MW facility under development and said Singtel plans to nearly double capacity to 200 MW across Singapore, Malaysia, Thailand and Indonesia by 2026. Nxera says 40 to 50 percent of its regional capacity is configured for high-density AI, with 60 percent targeted. No GPU count is published, and further AI-ready capacity in Johor and Batam is due in the second half of 2026 without stated MW.

Timeline

Site & facility

Tuas Nxera Site

Location
Tuas, Singapore
Commissioned
2026

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
techwireasia.comcould not be fetched-
tools.prnewswire.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.