COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/ASC Purple

USA · decommissioned · hpc

ASC Purple

Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
63.39 TFlop/s
HPL measured
Rpeak
77.82 TFlop/s
Rmax ÷ Rpeak
81.5%
Cores
10,240
Power
1.67 MW
Per watt
0.0 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of ASC Purple, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax63.39 TFlop/s#10 of 74 · top 12%#261 of 332 · bottom 22%
Energy efficiency0.0 GF/W#17 of 19 · bottom 12%#162 of 162 · bottom 1%
Rmax ÷ Rpeak81.5 %#20 of 74 · top 26%#93 of 331 · top 28%
Power draw1,671 kW#2 of 20 · top 5%#35 of 171 · top 20%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
IBM eServer pSeries, POWER5 1.9GHz, Federation
IBM - Reported top500.org

Engineering, funding and access

What ASC Purple runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyIBM Federation switchTOP500 list entry2005-11Operator statedtop500.org
Cooling designFull system produced more than 16,000,000 Btu/h of heat, requiring new air-handling designs; computer plus cooling needed 7.5 MWHoused in LLNL's Terascale Simulation Facility.2005Operator statedasc.llnl.gov

Software

ItemDetailAs ofBasisSource
Programming and software stackIBM AIX operating systemTOP500 list entry2005-11Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
Funding programmeAdvanced Simulation and Computing (ASC, formerly ASCI), whose 100 TFlop/s goal was conceived in 19962005Operator statedasc.llnl.gov
Stated cost230 USD mLLNL gives $230 million as the total contract value for Purple and ancillary equipment and says Purple and BlueGene/L were the contract's two major components, so the figure may not be Purple alone; Nextgov says Purple was procured for $230 million.2005Operator statedasc.llnl.govnextgov.com
ProcurementIBM contract with the DOE/NNSA ASC programme, LLNL as lead lab, scheduling a 100 TFlop/s peak demonstration for June 2005; the same contract delivered BlueGene/L2005Operator statedasc.llnl.gov

The read

LLNL's IBM POWER5 system, third on the November 2005 TOP500 at 1,671 kW. Wikipedia says it was decommissioned in November 2010 and quotes different processor and power figures from TOP500's; neither is recorded, because Wikipedia is the only source and the two count differently. The TOP500 entry is the only source for the figures and no independent source confirms them, so the tier is reported. Only the parts a fetched source names are recorded as edges. Nextgov reported on 11 November 2010 (https://www.nextgov.com/digital-government/2010/11/energy-takes-one-time-darling-of-supercomputers-offline/47950/) that NNSA had turned Purple off.

Timeline

  • 2005 First operational source
  • 2005-11 Listed at #3 on the TOP500 (November 2005) source
  • 2010-11 NNSA announced it had turned Purple off after five years of service, to free staff, space and money for faster systems source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Livermore Computing Center

Location
Livermore, CA, USA
Cooling
Direct liquid cooling (warm water)
Commissioned
1996

Change history

Nearby in scale

The machines closest to ASC Purple by Rmax, smaller to larger.

  • Cerrillos · USA, decommissioned · 0.06 PFlop/s
  • PLCI · Saudi Arabia, operational · 0.06 PFlop/s
  • Abe · USA, decommissioned · 0.06 PFlop/s
  • Galileu · Brazil, operational · 0.06 PFlop/s
  • Galera Plus · Poland, operational · 0.07 PFlop/s
  • Trestles (SDSC) · USA, decommissioned · 0.07 PFlop/s

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading