COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Clementina XXI

Argentina · operational · mixed

Clementina XXI

Operated by SMN Argentina .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
5.39 PFlop/s
HPL measured
Rpeak
12.58 PFlop/s
Rmax ÷ Rpeak
42.8%
Cores
43,008
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo ThinkSystem SD650-I V3, 80 nodes
Lenovo 80
reported
Verified top500.orgargentina.gob.ar
Accelerator Intel Data Center GPU Max 1550
Accelerators
oneAPI (Xe-HPC) · Intel 7 / TSMC N5 · 600 W
Intel Data Center GPU Max 1550, 4 per GPU node on 74 nodes
Intel 296
estimated
Verified top500.orgdocs.clementinaxxi.org.ar
CPU -
Intel Xeon CPU Max 9462 32C 2.7GHz, two sockets per node on 80 nodes
Intel 160
estimated
Verified top500.orgdocs.clementinaxxi.org.ar
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
Infiniband NDR
NVIDIA - Reported top500.org
Operating system Red Hat Enterprise Linux
Operating systems
Linux distribution · Open source, commercial support subscription
Red Hat Enterprise Linux
Red Hat
IBMNYSE rolls up to IBM
- Reported top500.org

Engineering, funding and access

What Clementina XXI runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes80 nodes74 GPU nodes with four Intel GPU Max 1550 each plus 6 CPU-only nodes; the docs say all 80 can currently be used through the cpunodes partition.2025Operator stateddocs.clementinaxxi.org.ar
Interconnect and topologyInfiniBand NDRTOP500 submission.2026-06Operator statedtop500.org

Software

ItemDetailAs ofBasisSource
Job schedulerSlurmPartitions gpunodes and cpunodes.2025Operator stateddocs.clementinaxxi.org.ar
Programming and software stackRed Hat Enterprise Linux operating system2026-06Operator statedtop500.org
Programming and software stackIntel oneAPI 2024.2.1 compiler, Intel MKL 2024.2 and Intel MPI 2021.13Toolchain listed for the HPL run submitted to TOP500.2026-06Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
ProcurementAcquired after a public tender in which three large companies bid, announced by Argentina's Ministers of Science, Technology and Innovation and of DefenseThe announcement gives a price of 885 million pesos, which is not converted here.2023Operator statedclementinaxxi.org.ar

Access

ItemDetailAs ofBasisSource
How researchers get timeOpen and shared use across Argentina's national science and technology system, operated from the Servicio Meteorologico Nacional headquartersNo application process is described on this page.2023Operator statedclementinaxxi.org.ar

The read

Argentina's flagship national supercomputer, a Lenovo ThinkSystem SD650-I V3 machine in the national weather service's data center in Buenos Aires, shared across the national science system under a governance commission. Its documentation lists 80 nodes: 74 GPU nodes with four Intel Data Center GPU Max 1550 each and six CPU-only nodes, all with dual Xeon CPU Max 9462 and 512 GB of RAM plus HBM, on NDR InfiniBand. The acquisition was reported at 1,740 million pesos, and its best TOP500 position was 199th on the November 2024 list (289th by June 2026). The CPU and Intel GPU edges are verified by TOP500 and the operator's documentation. TOP500's 43,008 core count includes GPU cores. The exact site coordinates were not found in a page we fetched, so the system is left unlocated, and no go-live date was found. Rmax and Rpeak come from TOP500 alone, so the system tier is reported.

Timeline

  • 2024-11 Listed at #199 on the TOP500 (November 2024) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to Clementina XXI by Rmax, smaller to larger.

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
docs.clementinaxxi.org.arnames system only-
top500.orgnames system and partNVIDIA InfiniBand NDR (Quantum-2)

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading