Supercomputers/Systems/Shenzhen 10,000-Card Ascend Cluster
China · operational · ai training
Shenzhen 10,000-Card Ascend Cluster
Also known as Shenzhen 11, 000P intelligent computing cluster; Shenzhen 14, 000P intelligent computing
Operated by Shenzhen Municipal Government .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- 11.00 EFlop/s
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - The City of Shenzhen invested in and built the cluster; the operating company is not named in the reports | Shenzhen Municipal Government | - | Reported | sznews.com |
| Accelerator | Huawei Ascend 910C Accelerators Da Vinci About 10,000 Huawei Ascend 910C accelerators in a supernode cluster | Huawei | 10,000 reported | Reported | sznews.comcnbayarea.org.cn |
Engineering, funding and access
What Shenzhen 10,000-Card Ascend Cluster runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Cooling design | Natural cold sources, full liquid cooling for compute equipment and integrated power supply | 2026-03 | Press report | cnbayarea.org.cnsznews.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Huawei Ascend plus CANN hardware and software stack | 2026-03 | Press report | sznews.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Shenzhen municipal government (investment amount not stated) | 2026-03 | Press report | sznews.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Compute cooperation framework agreements, signed by nearly 50 enterprises, universities and research institutions for the second phase; the city also issues compute and training vouchers | 2026-03 | Press report | sznews.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | First-phase average daily failure rate of 0.3 per thousand and 93.12 percent linearity when training the Pangu-718B model (2026)The report says the failure rate is well below Meta's cluster level. | 2026-03 | Press report | sznews.comcnbayarea.org.cn |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 10,000 accelerators | 2026-03 | Operator stated | Ten-thousand-card Ascend 910C supernode cluster, second phase; first phase 3,000 petaflops not counted. | sznews.comcnbayarea.org.cn |
The read
Second-phase cluster of Shenzhen's city-invested intelligent computing project, lit at the end of March 2026: a 10,000-card Huawei Ascend 910C supernode cluster with 11,000 petaflops, billed as China's first 10,000-card full-stack domestic cluster. With the 3,000 petaflops first phase lit in 2025 (fully booked) the city's total is 14,000 petaflops; both phases are 92 percent booked and nearly 50 organisations signed compute framework agreements (SCMP, Silicon UK, Shenzhen News Network). The reports call it a Shenzhen city project and do not name the operating company or district, so the operator is recorded as the municipal government. The petaflops precision is unstated and the first-phase hardware is not described. Power is not published.
Change history
- 2026-10-09 Added Shenzhen 10,000-Card Ascend Cluster
Nearby in scale
The machines closest to Shenzhen 10,000-Card Ascend Cluster by accelerator count, smaller to larger.
- China Telecom Shaoguan Zhenwu Cluster · China, operational · 10,000 accelerators
- Lambda Kansas City AI Factory · USA, under construction · 10,000 accelerators
- Industrial AI Cloud · Germany, operational · 10,000 accelerators
- evroc Arlandastad AI Data Center · Sweden, planned · 10,000 accelerators
- Vyoma Chennai B300 AI Factory (Together AI) · India, planned · 10,000 accelerators
- Qingyang Enflame S60 Inference Cluster · China, operational · 10,016 accelerators
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
One cited source was readable and does not mention this system; another could not be read because the host returned a bot challenge. The unreadable one may well be fine, so this is weaker evidence than a corroborated row and much stronger than an unsupported one. See how this check works.
| Cited source | Result | Found on the page |
|---|---|---|
| cnbayarea.org.cn | could not be fetched | - |
| sznews.com | does not name this system | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.