China · operational · ai training

Shenzhen 10,000-Card Ascend Cluster

Also known as Shenzhen 11, 000P intelligent computing cluster; Shenzhen 14, 000P intelligent computing

Operated by Shenzhen Municipal Government .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
operator stated
Rpeak
11.00 EFlop/s
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
The City of Shenzhen invested in and built the cluster; the operating company is not named in the reports
Shenzhen Municipal Government
- Reported sznews.com
Accelerator Huawei Ascend 910C
Accelerators
Da Vinci
About 10,000 Huawei Ascend 910C accelerators in a supernode cluster
Huawei
10,000
reported
Reported sznews.comcnbayarea.org.cn

Engineering, funding and access

What Shenzhen 10,000-Card Ascend Cluster runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Cooling designNatural cold sources, full liquid cooling for compute equipment and integrated power supply2026-03Press reportcnbayarea.org.cnsznews.com

Software

ItemDetailAs ofBasisSource
Programming and software stackHuawei Ascend plus CANN hardware and software stack2026-03Press reportsznews.com

Funding

ItemDetailAs ofBasisSource
Funded byShenzhen municipal government (investment amount not stated)2026-03Press reportsznews.com

Access

ItemDetailAs ofBasisSource
How researchers get timeCompute cooperation framework agreements, signed by nearly 50 enterprises, universities and research institutions for the second phase; the city also issues compute and training vouchers2026-03Press reportsznews.com

Results

ItemDetailAs ofBasisSource
Notable resultFirst-phase average daily failure rate of 0.3 per thousand and 93.12 percent linearity when training the Pangu-718B model (2026)The report says the failure rate is well below Meta's cluster level.2026-03Press reportsznews.comcnbayarea.org.cn

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 10,000 accelerators 2026-03 Operator stated Ten-thousand-card Ascend 910C supernode cluster, second phase; first phase 3,000 petaflops not counted. sznews.comcnbayarea.org.cn

The read

Second-phase cluster of Shenzhen's city-invested intelligent computing project, lit at the end of March 2026: a 10,000-card Huawei Ascend 910C supernode cluster with 11,000 petaflops, billed as China's first 10,000-card full-stack domestic cluster. With the 3,000 petaflops first phase lit in 2025 (fully booked) the city's total is 14,000 petaflops; both phases are 92 percent booked and nearly 50 organisations signed compute framework agreements (SCMP, Silicon UK, Shenzhen News Network). The reports call it a Shenzhen city project and do not name the operating company or district, so the operator is recorded as the municipal government. The petaflops precision is unstated and the first-phase hardware is not described. Power is not published.

Timeline

  • 2025 The first 3,000 PFLOPS phase of the Shenzhen Ascend project is lit and later reported fully booked. source
  • 2026-03 First operational source

Change history

Nearby in scale

The machines closest to Shenzhen 10,000-Card Ascend Cluster by accelerator count, smaller to larger.

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

One cited source was readable and does not mention this system; another could not be read because the host returned a bot challenge. The unreadable one may well be fine, so this is weaker evidence than a corroborated row and much stronger than an unsupported one. See how this check works.

Cited sourceResultFound on the page
cnbayarea.org.cncould not be fetched-
sznews.comdoes not name this system-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.