COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Occigen

France · upgraded · hpc

Occigen

Also known as GENCI Occigen bullx DLC

Operated by GENCI at CINES .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
1.63 PFlop/s
HPL measured
Rpeak
2.10 PFlop/s
Rmax ÷ Rpeak
77.5%
Cores
50,544
Power
934.8 kW
Per watt
1.7 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Bull bullx DLC
Bull
ATOEPA rolls up to Atos
- Reported top500.orgcines.fr
CPU Intel Xeon E5-2690 v3
CPUs
x86-64 · 12C · 2.6 GHz · 22 nm · 135 W
Xeon E5-2690v3 12C 2.6GHz
Intel - Reported top500.org
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
Infiniband FDR
Mellanox
NVDANASDAQ rolls up to NVIDIA
- Reported top500.org

The read

The Bull bullx DLC supercomputer that GENCI bought in 2014 and CINES hosts and administers in Montpellier, listed by TOP500 with 50,544 Xeon E5-2690v3 12-core cores on InfiniBand FDR, 27th on the November 2014 list (CINES's own page says twenty-sixth). CINES describes the machine in a later 3.5 petaflop configuration over 34 compute racks, which is why the status is upgraded: TOP500 tracks the expanded Broadwell system as a separate entry and stops listing this one after November 2016. TOP500 is the only source for Rmax, Rpeak, cores and power, so the tier is reported.

Timeline

  • 2014 First operational source
  • 2014-11 List debut at #27 (November 2014) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

CINES

Location
Montpellier, France
Commissioned
2022

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
cines.frnames system only-
top500.orgnames system and partIntel Xeon E5-2690 v3, Mellanox InfiniBand FDR

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading