Supercomputers/Systems/Project Rainier

USA · operational · ai training

Project Rainier

Deep dive: Project Rainier: Amazon's Anthropic cluster

Operated by Amazon at AWS Project Rainier (St. Joseph County, Indiana) .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator AWS Trainium2
Accelerators
NeuronCore-v3 · TSMC 5nm
nearly half a million Trainium2 chips
Amazon - Reported aboutamazon.com
Interconnect AWS Elastic Fabric Adapter
Interconnect
Cloud fabric · Up to 3.2 Tb/s per instance · Low, but not deterministic
NeuronLinks within UltraServers and Elastic Fabric Adapter between them
Amazon - Reported aboutamazon.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 1,044,980 accelerators 2026-03-23 Third-party estimate Epoch AI chip estimate, latest per chip type (Trainium2); some rows are company disclosures, others modelled. Amazon stated nearly 500,000 in Oct 2025. epoch.ai
Accelerators 1,000,000 accelerators 2025-12 Design target Amazon: more than 1 million Trainium2 chips targeted by end of 2025 for training and inference; floor value aboutamazon.com
Accelerators 500,000 accelerators 2025-10 Operator stated Amazon: nearly half a million Trainium2 chips (value rounded up); spread over several US data centers including St. Joseph County, Indiana aboutamazon.com
Stated investment 11 USD bn 2024-04 Operator stated Announced AWS investment for the New Carlisle, Indiana campus (16 shells), the Rainier site in St. Joseph County; campus total, not cluster only constructiondive.cominsideindianabusiness.com
Facility power 1,092 MW 2026-06-03 Third-party estimate Epoch AI modelled gross facility power (IT plus cooling and overhead) at this timeline date. epoch.ai
IT power 910 MW 2026-06-03 Third-party estimate Epoch AI modelled IT power from satellite imagery and permits at this timeline date; not operator-stated. epoch.ai

How it is powered

SourceProviderMWStatusAs ofBasisNoteSource link
Utility gas plant NiSource - permitted 2026-06 Regulatory filing IURC approved on 17 Jun 2026 the Amazon contract, PPA and NIPSCO combined-cycle gas resources. Release says northern Indiana; the link to Rainier is inferred. nisource.comnisource.com
Battery storage NiSource - permitted 2026-06 Regulatory filing IURC also approved NIPSCO battery storage for the Amazon agreement on 17 Jun 2026. Release does not name the campus; link to Rainier is inferred. No MW stated. nisource.comnisource.com

How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.

Compute deals

All compute deals. Headline values are as announced, not additive.

The read

An AWS cluster built with and used by Anthropic, described by Amazon as nearly half a million Trainium2 chips, fully operational as of the 29 October 2025 update to its own page. St. Joseph County, Indiana is named as one of several Rainier sites, so the site is only partly disclosed and carries no map coordinates. Amazon states no exact chip count, announcement date, power or FLOPS, and Anthropic's own pages do not mention Rainier, so every fact here rests on Amazon alone. Amazon's 2.4 GW Indiana figure belongs to a separate later project and is not attributed to Rainier.

Timeline

Site & facility

AWS Project Rainier (St. Joseph County, Indiana)

Location
St. Joseph County, IN, USA
Commissioned
2025

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
aboutamazon.comnames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • AWS activates Project Rainier, a nearly 500,000-chip Trainium2 cluster for Anthropic · About Amazon
    Rainier is the largest non-NVIDIA training deployment in this dataset by chip count and the clearest evidence yet that a hyperscaler's own silicon, not merchant GPUs, can anchor a frontier model training run. AWS says Anthropic is headed toward more than 1 million Trainium2 chips by year end, which would make this entry's chip count stale within months rather than years.