India · under construction · mixed

Google India AI Hub (Vizag)

Also known as Google Visakhapatnam AI hub

Operated by Alphabet at Visakhapatnam Google AI Hub Campus .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Google Cloud AI hub of about one gigawatt in Visakhapatnam, built with AdaniConneX and Nxtra by Airtel
Alphabet - Reported googlecloudpresscorner.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Stated investment 15 USD bn 2025-10 Design target Google states about USD 15 bn over 2026 to 2030 for the Visakhapatnam AI hub with AdaniConneX and Airtel; includes subsea cable and energy works, not only the data centre. blog.google

The read

Google's gigawatt-scale AI hub near Visakhapatnam, Andhra Pradesh, announced 14 October 2025 as part of a 15 billion dollar investment over 2026 to 2030 with AdaniConneX and Nxtra by Airtel, with groundbreaking on 28 April 2026 at Tarluvada. Google's groundbreaking release calls it a 1 gigawatt-scale AI ecosystem and the Tribune reports about one gigawatt across three data centre campuses. Neither page names accelerators or a measured power draw, so the capacity is recorded as a qualitative target and the tier is reported.

Timeline

Site & facility

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
googlecloudpresscorner.comnames system only-
tribuneindia.comnames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Further reading