USA · under construction · mixed

Horizon

Operated by Texas Advanced Computing Center at TACC Horizon data center (Round Rock) .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell servers
Dell Technologies - Reported tacc.utexas.edu
Accelerator NVIDIA GB200 NVL72
Accelerators
Arm CPU + CUDA GPU · TSMC 4NP
NVIDIA Grace Blackwell servers
NVIDIA - Reported tacc.utexas.edu
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
NVIDIA Quantum-2 InfiniBand
NVIDIA - Reported tacc.utexas.edu
Storage VAST Data Platform
Storage
Disaggregated shared-everything
400 PB all-solid-state storage, VAST Data
VAST Data
- Reported tacc.utexas.edu

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 4,000 accelerators 2026-10 Design target TACC: Grace Blackwell and Vera servers with 4,000 GPUs. Planned system. Both pages are TACC. tacc.utexas.edutacc.utexas.edu
Stated investment 0.46 USD bn 2024-07 Operator stated NSF award 2323116, Construction for the Leadership Class Computing Facility: $457.4M estimated total. Covers Horizon plus facility, visitor centre and partners. api.nsf.gov
Facility power 20 MW 2026-10 Design target TACC: new 15-20 MW liquid-cooled data centre in Round Rock. 20 is the top of the stated range; planned capacity, not a draw. tacc.utexas.edu

The read

TACC's NSF Leadership-Class Computing Facility system, being installed in a Sabey data center in Round Rock with Dell, NVIDIA Grace Blackwell and Vera servers, Quantum-2 InfiniBand and 400 PB of solid-state storage from VAST Data. TACC's two pages disagree: the November 2025 post says 300 PFlop/s and production in spring 2026, while the systems page says 360 PFlop/s and phase one in fall 2026. Neither FLOPS figure nor either date is recorded. Both pages are TACC's, so the tier is reported.

Timeline

Site & facility

TACC Horizon data center (Round Rock)

Location
Round Rock, TX, USA
Commissioned
2026

Where sources disagree

We record conflicts instead of picking a winner quietly. All open questions.

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
tacc.utexas.edunames system and partNVIDIA InfiniBand NDR (Quantum-2), VAST Data Platform
tacc.utexas.edunames system and partNVIDIA InfiniBand NDR (Quantum-2), VAST Data Platform

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • Dell and NVIDIA detail Horizon, the NSF's Frontera successor at TACC · Dell Technologies
    Horizon pairs unreleased NVIDIA Grace Blackwell and Vera parts with Dell's direct liquid cooled IRSS racks and Quantum-X800 InfiniBand, targeted at roughly 10x Frontera's simulation throughput. NSF funding uncertainty flagged earlier in 2025 did not stop the build, and early user access is slated for spring 2026, which is worth checking against whatever actually ships.