USA · under construction · mixed
Horizon
Operated by Texas Advanced Computing Center at TACC Horizon data center (Round Rock) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell servers | Dell Technologies | - | Reported | tacc.utexas.edu |
| Accelerator | NVIDIA GB200 NVL72 Accelerators Arm CPU + CUDA GPU · TSMC 4NP NVIDIA Grace Blackwell servers | NVIDIA | - | Reported | tacc.utexas.edu |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds NVIDIA Quantum-2 InfiniBand | NVIDIA | - | Reported | tacc.utexas.edu |
| Storage | VAST Data Platform Storage Disaggregated shared-everything 400 PB all-solid-state storage, VAST Data | VAST Data | - | Reported | tacc.utexas.edu |
Engineering, funding and access
What Horizon runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 2,000 nodesGPU partition: each node has one Grace CPU and two Blackwell GPUs (NVL4 shelves). The Vera CPU partition, first planned at 4,750 dual-socket nodes, is now expected in early 2027 with fewer, larger-memory nodes, roughly 4,000 nodes and 700,000 cores per TACC | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edu |
| Storage capacity | 400 PBRoughly 400 PB usable, all solid state; TACC reported all of it installed and 100 PB tested by 10 August 2026 | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edunextplatform.com |
| Interconnect and topology | InfiniBand three-level fat tree: non-blocking 800 Gb/s XDR to the 2,000 GPU nodes and 400 Gb/s to CPU nodes on Quantum QM3400 and QM3200 switches, with a 20 TB/s design target to storageThe Next Platform (November 2025) had reported 400 Gb/s Quantum-2 switches with two 400 Gb/s ports per GPU node | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edu |
| Cooling design | Direct liquid cooling in Dell Integrated Rack Scalable Systems with in-rack and rear-door cooling fed by CDUs; GPU racks hold 144 GPUs at about 215 kW eachTACC estimated about 13 MW for the full system across 128 cabinets (28 GPU, 66 CPU and 34 storage, switch and management racks) | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edunextplatform.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | VAST Data all-flash shared file system on InfiniBand, about 400 PB usable, 8 TB/s write and 16 TB/s readVAST's November 2025 release names its AI OS as Horizon's data layer | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.eduvastdata.com |
| Job scheduler | SlurmTACC's slides refer to setting network tuning in users' Slurm environment | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edu |
| Programming and software stack | MVAPICH and Open MPI, following TACC's practice of two compilers and two MPI stacks per system | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edu |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | U.S. National Science Foundation (award 2323116, Construction for the Leadership Class Computing Facility)PI Daniel Stanzione; award runs 2024-07-01 to 2028-04-30, with $376 million obligated through FY2026; the estimated total award of $457.4 million covers the whole LCCF, including four Distributed Science Centers and facility rental, so it is not a price for the machine | 2024-07 | Operator stated | api.nsf.gov |
| Funding programme | NSF Leadership-Class Computing Facility (LCCF), funded through NSF's Major Research Equipment program | 2024-07 | Operator stated | api.nsf.gov |
| Procurement | Dell Technologies builds the system on NVIDIA Grace Blackwell and Vera CPU servers in Dell Integrated Rack Scalable Systems, with VAST Data storage and a Sabey Data Centers hall in Round Rock built to TACC's specifications | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edunextplatform.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2026: native HPL reached 124.3 PFlop/s on 3,700 GPUs during installation, about 33.6 TFlop/s per GPU; TACC expects about 130 PFlop/s on the full GPU partition | 2026-08 | Operator stated | mug.mvapich.cse.ohio-state.edu |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 4,000 accelerators | 2026-10 | Design target | TACC: Grace Blackwell and Vera servers with 4,000 GPUs. Planned system. Both pages are TACC. | tacc.utexas.edutacc.utexas.edu |
| Stated investment | 0.46 USD bn | 2024-07 | Operator stated | NSF award 2323116, Construction for the Leadership Class Computing Facility: $457.4M estimated total. Covers Horizon plus facility, visitor centre and partners. | api.nsf.gov |
| Facility power | 20 MW | 2026-10 | Design target | TACC: new 15-20 MW liquid-cooled data centre in Round Rock. 20 is the top of the stated range; planned capacity, not a draw. | tacc.utexas.edu |
The read
TACC's NSF Leadership-Class Computing Facility system, being installed in a Sabey data center in Round Rock with Dell, NVIDIA Grace Blackwell and Vera servers, Quantum-2 InfiniBand and 400 PB of solid-state storage from VAST Data. TACC's two pages disagree: the November 2025 post says 300 PFlop/s and production in spring 2026, while the systems page says 360 PFlop/s and phase one in fall 2026. Neither FLOPS figure nor either date is recorded. Both pages are TACC's, so the tier is reported.
Timeline
- 2024-07 Announced source
- 2024-08 TACC chose Sabey Data Centers' campus at 1300 Louis Henna Boulevard in Round Rock to host Horizon source
- 2025-09 Underfloor cooling was installed in Horizon's hall at Sabey in Round Rock, followed by the raised floor in October 2025 source
- 2026-04-01 22 Horizon racks were on the data center floor source
- 2026-06-26 Horizon completed its first native HPL run above 100 PFlop/s, reaching 101.5 PFlop/s on 3,072 GPUs source
- 2026-08-10 All 28 GPU racks (4,000 GPUs) and all 400 PB of storage were installed, with 3,072 GPUs HPL-tested and the earliest users being admitted source
Site & facility
TACC Horizon data center (Round Rock)
- Location
- Round Rock, TX, USA
- Commissioned
- 2026
Where sources disagree
We record conflicts instead of picking a winner quietly. All open questions.
- Peak performance: 300 PFlop/s (November 2025 post) against 360 PFlop/s (systems page). Both pages are TACC; neither figure is recorded.
- Production date: Spring 2026 (November 2025 post) against Phase 1 in fall 2026 (systems page). The later page is treated as current, but no date is recorded.
Change history
- 2026-09-20 Added from operator sources
Nearby in scale
The machines closest to Horizon by accelerator count, smaller to larger.
- CHIE-4 · Japan, operational · 4,000 accelerators
- Databricks DBRX Training Cluster · USA, operational · 3,072 accelerators
- Shaheen III - GPU · Saudi Arabia, operational · 2,800 accelerators
- Naver B200 4K Cluster · South Korea, operational · 4,000 accelerators
- Nebius Modiin Cluster · Israel, operational · 4,000 accelerators
- Nebius Longcross UK Cluster · United Kingdom, operational · 4,000 accelerators
Related systems
Same operator
- Stampede3 · USA, operational, 2024
- Vista (TACC) · USA, operational, 2024
- Lonestar6 · USA, operational
- Frontera · USA, decommissioned, 2019
- Longhorn · USA, operational, 2019
- Stampede2 · USA, decommissioned, 2017
Same accelerator
- Hon Hai Kaohsiung Super Computing Center · Taiwan, under construction
- CoreWeave Vennesla (Bulk N01) · Norway, operational
- MAVERIC · Australia, under construction
- Microsoft Fairwater (Atlanta) · USA, operational
- Mistral Campus AI (Bruyeres-le-Chatel) · France, operational
- Nano 4 GB200 · Taiwan, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| tacc.utexas.edu | names system and part | NVIDIA InfiniBand NDR (Quantum-2), VAST Data Platform |
| tacc.utexas.edu | names system and part | NVIDIA InfiniBand NDR (Quantum-2), VAST Data Platform |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Related news
- Dell and NVIDIA detail Horizon, the NSF's Frontera successor at TACC · Dell TechnologiesHorizon pairs unreleased NVIDIA Grace Blackwell and Vera parts with Dell's direct liquid cooled IRSS racks and Quantum-X800 InfiniBand, targeted at roughly 10x Frontera's simulation throughput. NSF funding uncertainty flagged earlier in 2025 did not stop the build, and early user access is slated for spring 2026, which is worth checking against whatever actually ships.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.