Supercomputers/Systems/Horizon

USA · under construction · mixed

Horizon

Operated by Texas Advanced Computing Center at TACC Horizon data center (Round Rock) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell servers
Dell Technologies - Reported tacc.utexas.edu
Accelerator NVIDIA GB200 NVL72
Accelerators
Arm CPU + CUDA GPU · TSMC 4NP
NVIDIA Grace Blackwell servers
NVIDIA - Reported tacc.utexas.edu
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
NVIDIA Quantum-2 InfiniBand
NVIDIA - Reported tacc.utexas.edu
Storage VAST Data Platform
Storage
Disaggregated shared-everything
400 PB all-solid-state storage, VAST Data
VAST Data
- Reported tacc.utexas.edu

Engineering, funding and access

What Horizon runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes2,000 nodesGPU partition: each node has one Grace CPU and two Blackwell GPUs (NVL4 shelves). The Vera CPU partition, first planned at 4,750 dual-socket nodes, is now expected in early 2027 with fewer, larger-memory nodes, roughly 4,000 nodes and 700,000 cores per TACC2026-08Operator statedmug.mvapich.cse.ohio-state.edu
Storage capacity400 PBRoughly 400 PB usable, all solid state; TACC reported all of it installed and 100 PB tested by 10 August 20262026-08Operator statedmug.mvapich.cse.ohio-state.edunextplatform.com
Interconnect and topologyInfiniBand three-level fat tree: non-blocking 800 Gb/s XDR to the 2,000 GPU nodes and 400 Gb/s to CPU nodes on Quantum QM3400 and QM3200 switches, with a 20 TB/s design target to storageThe Next Platform (November 2025) had reported 400 Gb/s Quantum-2 switches with two 400 Gb/s ports per GPU node2026-08Operator statedmug.mvapich.cse.ohio-state.edu
Cooling designDirect liquid cooling in Dell Integrated Rack Scalable Systems with in-rack and rear-door cooling fed by CDUs; GPU racks hold 144 GPUs at about 215 kW eachTACC estimated about 13 MW for the full system across 128 cabinets (28 GPU, 66 CPU and 34 storage, switch and management racks)2026-08Operator statedmug.mvapich.cse.ohio-state.edunextplatform.com

Software

ItemDetailAs ofBasisSource
Parallel filesystemVAST Data all-flash shared file system on InfiniBand, about 400 PB usable, 8 TB/s write and 16 TB/s readVAST's November 2025 release names its AI OS as Horizon's data layer2026-08Operator statedmug.mvapich.cse.ohio-state.eduvastdata.com
Job schedulerSlurmTACC's slides refer to setting network tuning in users' Slurm environment2026-08Operator statedmug.mvapich.cse.ohio-state.edu
Programming and software stackMVAPICH and Open MPI, following TACC's practice of two compilers and two MPI stacks per system2026-08Operator statedmug.mvapich.cse.ohio-state.edu

Funding

ItemDetailAs ofBasisSource
Funded byU.S. National Science Foundation (award 2323116, Construction for the Leadership Class Computing Facility)PI Daniel Stanzione; award runs 2024-07-01 to 2028-04-30, with $376 million obligated through FY2026; the estimated total award of $457.4 million covers the whole LCCF, including four Distributed Science Centers and facility rental, so it is not a price for the machine2024-07Operator statedapi.nsf.gov
Funding programmeNSF Leadership-Class Computing Facility (LCCF), funded through NSF's Major Research Equipment program2024-07Operator statedapi.nsf.gov
ProcurementDell Technologies builds the system on NVIDIA Grace Blackwell and Vera CPU servers in Dell Integrated Rack Scalable Systems, with VAST Data storage and a Sabey Data Centers hall in Round Rock built to TACC's specifications2026-08Operator statedmug.mvapich.cse.ohio-state.edunextplatform.com

Results

ItemDetailAs ofBasisSource
Notable result2026: native HPL reached 124.3 PFlop/s on 3,700 GPUs during installation, about 33.6 TFlop/s per GPU; TACC expects about 130 PFlop/s on the full GPU partition2026-08Operator statedmug.mvapich.cse.ohio-state.edu

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 4,000 accelerators 2026-10 Design target TACC: Grace Blackwell and Vera servers with 4,000 GPUs. Planned system. Both pages are TACC. tacc.utexas.edutacc.utexas.edu
Stated investment 0.46 USD bn 2024-07 Operator stated NSF award 2323116, Construction for the Leadership Class Computing Facility: $457.4M estimated total. Covers Horizon plus facility, visitor centre and partners. api.nsf.gov
Facility power 20 MW 2026-10 Design target TACC: new 15-20 MW liquid-cooled data centre in Round Rock. 20 is the top of the stated range; planned capacity, not a draw. tacc.utexas.edu

The read

TACC's NSF Leadership-Class Computing Facility system, being installed in a Sabey data center in Round Rock with Dell, NVIDIA Grace Blackwell and Vera servers, Quantum-2 InfiniBand and 400 PB of solid-state storage from VAST Data. TACC's two pages disagree: the November 2025 post says 300 PFlop/s and production in spring 2026, while the systems page says 360 PFlop/s and phase one in fall 2026. Neither FLOPS figure nor either date is recorded. Both pages are TACC's, so the tier is reported.

Timeline

  • 2024-07 Announced source
  • 2024-08 TACC chose Sabey Data Centers' campus at 1300 Louis Henna Boulevard in Round Rock to host Horizon source
  • 2025-09 Underfloor cooling was installed in Horizon's hall at Sabey in Round Rock, followed by the raised floor in October 2025 source
  • 2026-04-01 22 Horizon racks were on the data center floor source
  • 2026-06-26 Horizon completed its first native HPL run above 100 PFlop/s, reaching 101.5 PFlop/s on 3,072 GPUs source
  • 2026-08-10 All 28 GPU racks (4,000 GPUs) and all 400 PB of storage were installed, with 3,072 GPUs HPL-tested and the earliest users being admitted source

Site & facility

TACC Horizon data center (Round Rock)

Location
Round Rock, TX, USA
Commissioned
2026

Where sources disagree

We record conflicts instead of picking a winner quietly. All open questions.

Change history

Nearby in scale

The machines closest to Horizon by accelerator count, smaller to larger.

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
tacc.utexas.edunames system and partNVIDIA InfiniBand NDR (Quantum-2), VAST Data Platform
tacc.utexas.edunames system and partNVIDIA InfiniBand NDR (Quantum-2), VAST Data Platform

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • Dell and NVIDIA detail Horizon, the NSF's Frontera successor at TACC · Dell Technologies
    Horizon pairs unreleased NVIDIA Grace Blackwell and Vera parts with Dell's direct liquid cooled IRSS racks and Quantum-X800 InfiniBand, targeted at roughly 10x Frontera's simulation throughput. NSF funding uncertainty flagged earlier in 2025 did not stop the build, and early user access is slated for spring 2026, which is worth checking against whatever actually ships.

All news →

Further reading