Supercomputers/Systems/Hortense
Belgium · operational · hpc
Hortense
Also known as VSC Tier-1 Hortense; HPC-UGent Hortense
Operated by Flemish Supercomputer Centre at HPC-UGent (Ghent) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- 3.30 PFlop/s
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Atos BullSequana XH2000 (Ghent University framework contract) | Atos | - | Reported | vscentrum.be |
| Accelerator | NVIDIA A100 SXM4 40GB Accelerators CUDA (Ampere GA100) · 6,912C · 1.41 GHz · 7 nm · 400 W Phase 1: 20 GPU nodes x 4 NVIDIA A100 SXM4 40 GB (quantity derived as 20 x 4) | NVIDIA | 80 reported | Reported | github.com |
| Accelerator | NVIDIA A100 SXM4 80GB Accelerators Phase 2: 20 GPU nodes x 4 NVIDIA A100 SXM4 80 GB with NVLink3 (quantity derived as 20 x 4) | NVIDIA | 80 reported | Reported | docs.vscentrum.begithub.com |
| CPU | - Phase 1 Rome nodes with dual 64-core AMD EPYC 7H12: 342 standard plus 42 large-memory (quantity is nodes) | AMD | 384 reported | Reported | github.com |
| CPU | AMD EPYC 7763 (Milan) CPUs x86-64 · 64C · 2.45 GHz · 7 nm · 280 W 384 Phase 2 nodes with dual 64-core AMD EPYC 7763 Milan (quantity is nodes) | AMD | 384 reported | Reported | docs.vscentrum.begithub.com |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds InfiniBand HDR-100 in a 2:1 fat tree (dual HDR on A100 GPU nodes) | NVIDIA | - | Reported | docs.vscentrum.be |
Engineering, funding and access
What Hortense runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 408 nodesPhase 2 partitions left after Phase 1 retired on 11 July 2026: 384 AMD EPYC 7763 CPU nodes, 20 GPU nodes with four A100 80 GB each and 4 debug nodes; both phases together had crossed 100,000 cores | 2026-10 | Operator stated | docs.vscentrum.be |
| Storage capacity | 5.4 PBShared Lustre scratch; Phase 2 doubled its volume and raised throughput | 2026-10 | Operator stated | docs.vscentrum.be |
| Interconnect and topology | InfiniBand HDR-100 in a 2:1 fat tree, with dual HDR on the GPU nodes | 2026-10 | Operator stated | docs.vscentrum.be |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre shared scratch of 5.4 PB, with home directories on scratch and a read-only mount for repeatedly read data | 2026-10 | Operator stated | docs.vscentrum.be |
| Job scheduler | Slurm, with a Torque-compatible jobcli front end (qsub, qstat, qdel)Maximum walltime 72 hours | 2026-10 | Operator stated | docs.vscentrum.be |
| Programming and software stack | Red Hat Enterprise Linux 9; the move from RHEL 8 finished with the GPU nodes in March 2026 | 2026-10 | Operator stated | docs.vscentrum.be |
| Programming and software stack | Central module stack built with EasyBuild | 2026-10 | Operator stated | docs.vscentrum.be |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Ghent University signed a six-year framework contract worth more than EUR 10 million with Atos to supply the VSC's next Tier-1 system on BullSequana XH2000, announced 30 September 2020 | 2020-09-30 | Operator stated | vscentrum.be |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Free VSC Tier-1 project calls for researchers at Flemish universities, SOCs and public knowledge institutions, judged by an international commission at three cut-offs a year, plus starting and collaborative grantsStarting grants give up to 500,000 core-hours and 1,000 GPU hours; paid industry use goes through vsc4business; VSC says Hortense is being phased out in favour of sofia | 2026 | Operator stated | vscentrum.bedocs.vscentrum.be |
| Access page | www.vscentrum.be/computeVSC page for applying for Tier-1 compute time | 2026 | Operator stated | vscentrum.be |
The read
The third Tier-1 cluster of the Flemish Supercomputer Centre (VSC), hosted at Ghent University and built by Atos on BullSequana XH2000, named after Nicole-Reine Lepaute. VSC announced it on 30 September 2020 with about 44,000 cores, 80 GPUs, 100 TB of RAM, 3 PB of storage and 3.3 PFlop/s peak, which is the operator figure recorded here and refers to the original configuration. A Phase 2 expansion in May 2023 added 384 nodes with dual AMD EPYC 7763 (128 cores each) and 20 nodes with four A100 80 GB GPUs each. The VSC documentation lists 5.4 PB of shared Lustre scratch and HDR-100 InfiniBand in a 2:1 fat tree. The Phase 1 partitions (342 plus 42 Rome nodes on EPYC 7H12 and 20 nodes with four A100 40 GB GPUs) were decommissioned on 11 July 2026, so the row reflects the October 2026 state with Phase 2 hardware active. No HPL result is recorded here and no whole-system core count is stated. Both sources are VSC publications, so the tier is reported.
Timeline
- 2020-09-30 Announced source
- 2021 First operational source
- 2023 Phase 2 added 384 AMD EPYC 7763 nodes, 20 GPU nodes with four A100 80 GB each and 48 Rome nodes, more than doubling capacity and doubling Lustre scratch to 5.4 PB source
- 2026-07-11 All Phase 1 partitions (Rome CPU and A100 40 GB GPU nodes) were decommissioned as the fourth VSC Tier-1 system, sofia, arrived at VUB; Phase 2 stays in service source
Site & facility
Change history
- 2026-10-04 Added Hortense, VSC Tier-1 (Ghent)
Related systems
Same operator
- BrENIAC · Belgium, decommissioned, 2016
- Sofia (VSC Tier-1) · Belgium, operational, 2026
Same accelerator
- Tethys · USA, operational, 2021
- Voyager-EUS2 · USA, operational, 2021
- Champollion · France, operational, 2022
- RE1 (Flatiron) · USA, operational, 2022
- SK Telecom Titan · South Korea, operational, 2022
- Kalos (Shanghai AI Lab) · China, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| docs.vscentrum.be | names system, part and count | AMD EPYC 7763 (Milan), NVIDIA A100 SXM4 40GB, NVIDIA A100 SXM4 80GB, NVIDIA InfiniBand HDR · counts: 384, 80, 80 |
| vscentrum.be | names system only | · counts: 80, 80 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.