Supercomputers/Systems/Keeneland
USA · decommissioned · hpc
Keeneland
Also known as Keeneland Full Scale System, KFS
Operated by Georgia Institute of Technology .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 319.56 TFlop/s
- Rpeak
- 614.54 TFlop/s
- Rmax ÷ Rpeak
- 52.0%
- Cores
- 16,896
- Power
- 1.27 MW
- Per watt
- 0.3 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Keeneland, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 319.56 TFlop/s | #104 of 193 · bottom 47% | #223 of 332 · bottom 34% |
| Energy efficiency | 0.3 GF/W | #140 of 149 · bottom 7% | #146 of 162 · bottom 11% |
| Rmax ÷ Rpeak | 52.0 % | #183 of 192 · bottom 6% | #307 of 331 · bottom 8% |
| Power draw | 1,267 kW | #30 of 151 · top 19% | #49 of 171 · top 28% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HP Cluster Platform SL250s Gen8 | Hewlett Packard Enterprise | - | Reported | top500.orglabmanager.com |
| Accelerator | - NVIDIA Tesla M2090 GPUs, three per node | NVIDIA | - | Reported | top500.orglabmanager.com |
| CPU | Intel Xeon E5-2670 CPUs x86-64 · 8C · 2.6 GHz · 32 nm · 115 W Xeon E5-2670 8C 2.6 GHz | Intel | - | Reported | top500.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond Infiniband FDR | NVIDIA | - | Reported | top500.orglabmanager.com |
Engineering, funding and access
What Keeneland runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 264 nodesKeeneland Full Scale System of HP ProLiant SL250 nodes, each with two Sandy Bridge CPUs and three NVIDIA M2090 GPUs, in about 400 square feet including in-row cooling | 2012-11 | Press report | labmanager.com |
| Total memory | 8.448 TBDerived: 264 nodes x 32 GB of host memory, excluding GPU memory | 2012-11 | Press report | labmanager.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | U.S. National Science FoundationFacility managed by Georgia Tech, the University of Tennessee-Knoxville, NICS and Oak Ridge National Laboratory | 2012-11 | Press report | labmanager.com |
| Funding programme | NSF Track 2D five-year cooperative agreement OCI-0910735, awarded in 2009 | 2012-11 | Press report | labmanager.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Allocated to the NSF science community through XSEDE peer-reviewed allocations | 2012-11 | Press report | labmanager.com |
The read
The Georgia Tech-led NSF Track 2D GPU system, a 264-node HP SL250 Gen8 cluster with two Sandy Bridge Xeons and three NVIDIA M2090 GPUs per node on Mellanox FDR InfiniBand, about 615 TFlop/s peak. Partners were the University of Tennessee-Knoxville, NICS and Oak Ridge National Laboratory, and it was made available through XSEDE. It reached 75th on the November 2012 TOP500 with 319.6 TFlop/s Rmax. The same TOP500 system entry earlier carried the smaller Keeneland Initial Delivery System of HP SL390s G7 nodes with Fermi GPUs, listed from November 2010.
Timeline
- 2011-11 The Keeneland Initial Delivery System's TOP500 entry rose from 6,048 cores and 63.92 TFlop/s to 6,210 cores and 106.30 TFlop/s source
- 2012-11 Listed at #75 on the TOP500 (November 2012) source
- 2012-11 First operational source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Keeneland, Georgia Tech's NSF GPU system
Nearby in scale
The machines closest to Keeneland by Rmax, smaller to larger.
Related systems
Same operator
- Phoenix (PACE) · USA, operational, 2020
- Nexus (Georgia Tech) · USA, operational, 2026
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| labmanager.com | blocked our fetch | - |
| top500.org | names system and part | Intel Xeon E5-2670, Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.