Operated by Calcul Québec at École de technologie supérieure (Calcul Québec) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
2.28 PFlop/s
HPL measured
Rpeak
7.49 PFlop/s
Rmax ÷ Rpeak
30.4%
Cores
72,480
Power
240 kW
Per watt
9.5 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Béluga, and those in Canada. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax2.28 PFlop/s#153 of 230 · bottom 35%#14 of 27 · top 50%
Energy efficiency9.5 GF/W#46 of 129 · top 35%#4 of 15 · top 21%
Rmax ÷ Rpeak30.4 %#222 of 224 · bottom 2%#27 of 27 · bottom 1%
Power draw240 kW#106 of 132 · bottom 21%#12 of 16 · bottom 28%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell EMC PowerEdge R640 servers
Dell Technologies - Reported top500.org
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
NVIDIA Tesla V100 GPUs, 688 across the cluster per the Calcul Quebec portal
NVIDIA 688
reported
Reported portail.beluga.calculquebec.catop500.org
CPU Intel Xeon Gold 6148
CPUs
x86-64 · 20C · 2.4 GHz · 14 nm · 150 W
Intel Xeon Gold 6148 20C 2.4GHz
Intel - Reported top500.org
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
InfiniBand EDR
NVIDIA - Reported top500.org

Engineering, funding and access

What Béluga runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Storage capacity27.705 PB0.105 PB home + 2.6 PB scratch + 25 PB project = 27.705 PB of Lustre2025Operator statedualberta-rcg.github.io
Interconnect and topologyMellanox InfiniBand EDR (100 Gb/s) to all nodes; islands joined by a central 324-port switch with a maximum 5:1 blocking factor, non-blocking for jobs up to 640 coresText from a University of Alberta RCG mirror of the Alliance Beluga wiki page, as docs.alliancecan.ca blocked the fetch; TOP500 lists Infiniband EDR2025Operator statedualberta-rcg.github.iotop500.org

Software

ItemDetailAs ofBasisSource
Parallel filesystemLustre: /home 105 TB, /scratch 2.6 PB, /project 25 PBMirror of the Alliance Beluga wiki page; home and project had daily backups and scratch was purged of old files2025Operator statedualberta-rcg.github.io
Job schedulerSlurm; jobs up to 7 days (168 h), at most 1,000 running or pending jobs per userMirror of the Alliance Beluga wiki page2025Operator statedualberta-rcg.github.io
Programming and software stackHPL run on CentOS with GCC, MKL and cuBLAS, and Open MPI 3.1.2TOP500 list entry2019-06Operator statedtop500.org

Funding

ItemDetailAs ofBasisSource
Funded byGovernment of Quebec, CAD 12.8 millionCalcul Quebec says the CFI contribution matched the Quebec government's support2019-04-30Operator statedreporter.mcgill.cacalculquebec.ca
Funded byFonds de recherche du Quebec (FRQ)No amount given2019-04Operator statedcalculquebec.careporter.mcgill.ca
Funded byCanada Foundation for Innovation (CFI), more than CAD 12.5 millionPart of a CAD 20 million CFI Cyberinfrastructure Initiative award to Compute Canada; CFI's share matched the Quebec government's support2019-02-12Operator statedcalculquebec.ca
Funding programmeCFI Cyberinfrastructure Initiative, matched by the Government of Quebec2019-02-12Operator statedcalculquebec.ca

The read

General-purpose Digital Research Alliance of Canada (formerly Compute Canada) cluster at the Ecole de technologie superieure in Montreal, run by Calcul Quebec and made available in early April 2019 per McGill's announcement. A Dell EMC PowerEdge R640 system of Xeon Gold 6148 CPUs with NVIDIA Tesla V100 GPUs on InfiniBand EDR, 106th on the June 2019 TOP500 at 2.28 PFlop/s Rmax. The Calcul Quebec portal states 688 GPUs and over 38,960 cores for the cluster as a whole, against 72,480 cores in the TOP500 entry (which counts GPU cores), so core totals are not directly comparable. The Alliance documentation (mirrored at https://ualberta-rcg.github.io/ragflow-wiki-data/base/clusters/b%C3%A9luga/) says all Beluga nodes were powered off on 31 July 2025, when Rorqual replaced it.

Timeline

  • 2019-02-12 CFI announced CAD 20 million for Compute Canada under its Cyberinfrastructure Initiative, including more than CAD 12.5 million to co-finance Beluga source
  • 2019-04 First operational source
  • 2019-04-26 Calcul Quebec held Beluga's launch event at ETS, about three weeks after the system opened to researchers on 3 April 2019 source
  • 2019-06 Listed at #106 on the TOP500 (June 2019) source
  • 2024-10-18 The Alliance and the Government of Quebec awarded McGill CAD 38.7 million to replace the end-of-life Beluga with a new system source
  • 2025-07-31 All Beluga compute nodes were powered off as of 31 July 2025, when the successor cluster Rorqual replaced it source
  • 2026-06-20 Access to all remaining Beluga data ended on 20 June 2026, completing the decommissioning of the compute cluster source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Change history

Nearby in scale

The machines closest to Béluga by Rmax, smaller to larger.

  • Cumulus (Cambridge) · United Kingdom, operational · 2.27 PFlop/s
  • Tethys · USA, operational · 2.26 PFlop/s
  • MTS GROM · Russia, operational · 2.26 PFlop/s
  • Wilkes-3 · United Kingdom, operational · 2.29 PFlop/s
  • Longhorn · USA, operational · 2.29 PFlop/s
  • Taiwania 3 · Taiwan, operational · 2.3 PFlop/s

Same site

  • Narval · Canada, operational, 2021
  • Guillimin · Canada, decommissioned, 2011

Same operator

  • Rorqual · Canada, operational, 2025

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
portail.beluga.calculquebec.cadoes not name this system · counts: 688
top500.orgnames system and partIntel Xeon Gold 6148, NVIDIA Tesla V100, Mellanox InfiniBand EDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading