COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Konrad (HLRN-III)

Germany · decommissioned · hpc

Konrad (HLRN-III)

Also known as HLRN-III Berlin

Operated by Zuse Institute Berlin at ZIB Berlin .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
991.52 TFlop/s
HPL measured
Rpeak
1.43 PFlop/s
Rmax ÷ Rpeak
69.5%
Cores
44,928
Power
877.5 kW
Per watt
1.1 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Konrad (HLRN-III), and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax991.52 TFlop/s#80 of 245 · top 32%#54 of 95 · bottom 45%
Energy efficiency1.1 GF/W#124 of 198 · bottom 39%#54 of 68 · bottom 22%
Rmax ÷ Rpeak69.5 %#185 of 243 · bottom 25%#55 of 94 · bottom 43%
Power draw878 kW#59 of 199 · top 29%#18 of 69 · top 25%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Cray XC30, expanded to Cray XC40 in 2014
Cray - Verified top500.orgheise.de
CPU -
Xeon E5-2695v2 12C 2.4GHz (phase 1) and E5-2680v3 12C 2.5GHz (phase 2), 44,928 cores in total
Intel - Reported top500.orgheise.de
Interconnect Cray Aries
Interconnect
Dragonfly · About 10 GB/s per direction · Around 1 microsecond
Cray Aries
Cray - Verified top500.orgcomputermuseum.zib.de
Operating system Cray Linux Environment
Operating systems
Linux, Cray-customised · Proprietary layer over open-source Linux
Cray Linux Environment
Cray - Reported top500.org

Engineering, funding and access

What Konrad (HLRN-III) runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes1,872 nodesZIB's list of operated systems gives 44,928 cores on 1,872 nodes; the first stage of September 2013 had 744 nodes, each with 24 Ivy Bridge cores and 64 GB (Gauss-Allianz Infobrief 21)2014Operator statednhr.zib.degauss-allianz.de
Interconnect and topologyCray Aries network with dragonfly topology2013-10Operator statedgauss-allianz.detop500.org

Software

ItemDetailAs ofBasisSource
Parallel filesystemLustre parallel file system, 1.4 PB at the September 2013 first stage; the two-site HLRN-III plan specified 7.2 PB of Lustre2013-10Operator statedgauss-allianz.degauss-allianz.de

Funding

ItemDetailAs ofBasisSource
Funded byGerman federal government, half of the EUR 30 million HLRN-III investmentThe EUR 30 million covers both HLRN-III sites, Berlin (Konrad) and Hannover (Gottfried)2013-02Operator statedgauss-allianz.descientific-computing.com
Funded byThe seven HLRN states (Berlin, Brandenburg, Bremen, Hamburg, Mecklenburg-Vorpommern, Lower Saxony and Schleswig-Holstein), the other half of the EUR 30 millionShared with the Hannover system Gottfried2013-02Operator statedgauss-allianz.descientific-computing.com
ProcurementZIB and Leibniz Universitaet Hannover signed contracts with Cray in December 2012 for HLRN-III, two Cray XC30 systems, one at each siteScientific Computing valued the multi-year, multi-phase contract for both sites at more than $39 million2012-12Operator statedgauss-allianz.descientific-computing.com

The read

Berlin half of the northern German HLRN-III complex, a Cray XC30 expanded to an XC40 with Haswell nodes, 52nd on the November 2014 TOP500. TOP500 gives 44,928 cores of Xeon E5-2695v2 and E5-2680v3 on the Cray Aries network, 991.5 TFlop/s Rmax and 1.426 PFlop/s Rpeak. Heise reports that Konrad and its Hannover twin Gottfried went into operation on 16 January 2014 as Cray XC30s with 17,856 12-core Xeon E5-2695v2 cores each, with a phase-two Haswell expansion planned; ZIB's computer museum page confirms the Aries-based XC30 install in autumn 2013 and a second-stage expansion in autumn 2014. ZIB's event page 'Goodbye Konrad. Welcome Lise!' marks the hand-over to HLRN-IV in December 2019; no exact shutdown date is recorded. Gottfried at Hannover is not added here. Final-phase figures are TOP500-only.

Timeline

  • 2012-12 ZIB and Leibniz Universitaet Hannover signed contracts with Cray for HLRN-III, two Cray XC30 systems for Berlin and Hannover with EUR 30 million of federal and state funding source
  • 2013-09 The first stage in Berlin, a Cray XC30 of 744 nodes with 24 Ivy Bridge cores and 64 GB each and a 1.4 PB Lustre file system, went into operation source
  • 2014-01 First operational source
  • 2014-11 Listed at #52 on the TOP500 (November 2014) source
  • 2014-11 After its second-stage Haswell expansion Konrad was listed as a Cray XC40 with 44,928 cores and 991.5 TFlop/s Rmax, up from 17,856 cores and 295.7 TFlop/s source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

ZIB Berlin

Location
Berlin, Germany
Commissioned
2019

Change history

Nearby in scale

The machines closest to Konrad (HLRN-III) by Rmax, smaller to larger.

Same site

  • Lise · Germany, operational, 2019

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
heise.denames system only-
top500.orgnames system and partCray Aries, Cray Linux Environment

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading