Supercomputers/Systems/L-CSC
Germany · operational · hpc
L-CSC
Also known as Lattice-CSC
Operated by GSI Helmholtz Centre for Heavy Ion Research at GSI Helmholtz Centre (Darmstadt) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 316.70 TFlop/s
- Rpeak
- 593.60 TFlop/s
- Rmax ÷ Rpeak
- 53.4%
- Cores
- 10,976
- Power
- 57.15 kW
- Per watt
- 5.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of L-CSC, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 316.70 TFlop/s | #179 of 245 · bottom 28% | #66 of 95 · bottom 32% |
| Energy efficiency | 5.5 GF/W | #5 of 198 · top 2% | #27 of 68 · top 39% |
| Rmax ÷ Rpeak | 53.4 % | #233 of 243 · bottom 5% | #90 of 94 · bottom 5% |
| Power draw | 57 kW | #194 of 199 · bottom 4% | #66 of 69 · bottom 5% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - ASUS ESC4000 FDR/G2S | ASUS | - | Reported | top500.orgtop500.org |
| Accelerator | AMD FirePro S9150 Accelerators TSMC 28nm 4 AMD FirePro S9150 GPUs per node, 160 nodes | AMD | 640 reported | Verified | top500.orgphys.org |
| CPU | Intel Xeon E5-2690 v2 CPUs x86-64 · 10C · 3 GHz · 22 nm · 130 W 2 Intel Xeon E5-2690 v2 per node, 160 nodes | Intel | 320 reported | Verified | top500.orgphys.org |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond InfiniBand FDR | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | top500.org |
Engineering, funding and access
What L-CSC runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 160 nodesEach node has four AMD FirePro S9150 GPUs, two CPUs and 256 GB; TOP500's interview gives a theoretical peak of 1.7 PFlop/s for the full system | 2014-11 | Press report | top500.org |
| Total memory | 40.96 TBDerived: 160 nodes x 256 GB of system memory; each node adds 64 GB of GPU memory | 2014-11 | Press report | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | OpenCL-based lattice QCD application developed in cooperation with FIAS | 2014-11 | Press report | top500.org |
| Programming and software stack | HPL-GPU with a custom OpenCL DGEMM kernel from AMD, using dynamic CPU and GPU load balancing and voltage and frequency scaling for the Green500 run | 2014-11 | Press report | top500.org |
The read
Built at GSI's Darmstadt site for Lattice QCD physics rather than as a general-purpose machine, L-CSC was the first AMD-GPU-powered system to top the Green500 list, reaching 5.27 GFlops/Watt in November 2014, an 18 percent improvement over the June 2014 winner. Four AMD FirePro S9150 cards per node across 160 ASUS ESC4000 servers did the arithmetic; GSI and the Frankfurt Institute for Advanced Studies at Goethe University Frankfurt built and operated it jointly. TOP500's own system page states 10,976 total cores against phys.org's contemporary count of 1,600 cores; this row leaves that discrepancy unresolved rather than guessing, in the same spirit as the other open core-count conflicts already logged elsewhere in this dataset. GSI's own account and the independent phys.org report agree on the rank, efficiency and hardware, so the tier is verified. Current operational status has not been independently confirmed since its last public TOP500 appearance in mid 2016; we carry the last documented state rather than inferring a retirement.
Timeline
- 2014 Announced source
- 2014-11 Listed at #1 on the Green500 (November 2014) source
- 2014-11 First operational source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-09-24 L-CSC added (GSI Helmholtz Centre, Germany)
Nearby in scale
The machines closest to L-CSC by Rmax, smaller to larger.
- Haedam · South Korea, decommissioned · 0.32 PFlop/s
- Haeon · South Korea, decommissioned · 0.32 PFlop/s
- Magnolia (Kyoto) · Japan, operational · 0.31 PFlop/s
- Phoenix (Adelaide) · Australia, operational · 0.32 PFlop/s
- Keeneland · USA, decommissioned · 0.32 PFlop/s
- Ranger · USA, decommissioned · 0.33 PFlop/s
Related systems
Same site
- GSI Virgo Cluster · Germany, operational, 2020
- fortytwo · Germany, operational, 2023
- fortythree · Germany, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| phys.org | could not be fetched | - |
| top500.org | names system and part | AMD FirePro S9150 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.