USA · operational · hpc

Wind River

Also known as WindRiver CTS-2

Operated by INL .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
5.33 PFlop/s
HPL measured
Rpeak
6.04 PFlop/s
Rmax ÷ Rpeak
88.2%
Cores
94,416
Power
893.4 kW
Per watt
6.0 GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Wind River, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax5.33 PFlop/s-#78 of 332 · top 23%
Energy efficiency6.0 GF/W-#40 of 162 · top 24%
Rmax ÷ Rpeak88.2 %-#32 of 331 · top 9%
Power draw893 kW-#67 of 171 · top 39%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Dell PowerEdge CTS-2 system, 843 nodes in 20 racks
Dell Technologies - Reported top500.orginl.gov
CPU -
Intel Xeon Platinum 8480+ 56C 2GHz
Intel - Reported top500.org
Interconnect Omni-Path Architecture
Interconnect
Fat tree · 100 Gb/s per port · About 1 microsecond
Omni-Path (OPA) interconnect
Cornelis Networks
- Verified inl.govtop500.org
Operating system Rocky Linux
Operating systems
RHEL-compatible Linux, community-maintained · Downstream rebuild of Red Hat Enterprise Linux source
Rocky Linux 8
Rocky Enterprise Software Foundation
- Reported top500.org

Engineering, funding and access

What Wind River runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyIntel Omni-PathTOP500 submission for the Dell CTS-2 system.2026-06Operator statedtop500.org

Software

ItemDetailAs ofBasisSource
Programming and software stackRocky Linux 8 operating system2026-06Operator statedtop500.org
Programming and software stackIntel oneAPI DPC++/C++ Compiler 2024.2 and Intel MPI 2021.13Toolchain listed for the HPL run.2026-06Operator statedtop500.org

The read

Idaho National Laboratory's Wind River supercomputer, named for the Wind River Range in Wyoming and a CTS-2 class machine. INL's HPC page lists it as arrived in 2024 with 20 racks, 843 nodes, 94,416 cores, 5.3 PFLOPS and an Omni-Path (OPA) interconnect. TOP500 lists WindRiver CTS-2 as a Dell PowerEdge (CTS-2) system with Xeon Platinum 8480+ 56C 2GHz hosts on Intel Omni-Path under Rocky Linux 8, installed 2025, with the same 94,416 cores, Rmax 5.33 PFlop/s, Rpeak 6.04 PFlop/s and 893.4 kW (level 1); it debuted at rank 234 on the June 2025 list and was 291st in June 2026. The two sources agree on cores, performance and interconnect, so the tier is verified. INL gives the arrival year 2024 and TOP500 the install year 2025, so no in-service date is recorded, and INL's page lists a total memory figure that was not used. The campus is not stated, so the site is left blank.

Timeline

  • 2025-06 Listed at #234 on the TOP500 (June 2025) source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Change history

Nearby in scale

The machines closest to Wind River by Rmax, smaller to larger.

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
inl.govcould not be fetched-
top500.orgnames system and partOmni-Path Architecture, Rocky Linux

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.