Supercomputers/Systems/TELUS BC Sovereign AI Cluster

Canada · under construction · ai training

TELUS BC Sovereign AI Cluster

Also known as TELUS Sovereign AI Factory cluster (Kamloops and Vancouver)

Operated by TELUS at TELUS Kamloops Data Centre .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
TELUS builds and operates the three-site British Columbia cluster
TELUS - Reported telus.com
Accelerator -
NVIDIA Vera Rubin and Grace Blackwell systems, over 60,000 GPUs at full scale by 2032
NVIDIA - Reported telus.com

Engineering, funding and access

What TELUS BC Sovereign AI Cluster runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyNVIDIA Quantum InfiniBand and Spectrum-X Ethernet2026-05Operator statedtelus.com
Cooling designClosed-loop liquid cooling, claimed to cut cooling energy by 80 percent and water use by 90 percent versus traditional data centres2026-05Operator statedtelus.comvantechjournal.com

Software

ItemDetailAs ofBasisSource
Programming and software stackNVIDIA AI Enterprise2026-05Operator statedtelus.com

Funding

ItemDetailAs ofBasisSource
Funding programmeEnabling Large-Scale Sovereign AI Data Centres initiative (Government of Canada)No funding committed at announcement2026-05Operator statedtelus.comvantechjournal.com
ProcurementThree B.C. sites (Kamloops expansion, M3 Mount Pleasant and 150 West Georgia with Westbank), over 60,000 GPUs and over 150 MW targeted by 2032; details still being worked out with the federal government2026-05Operator statedtelus.comvantechjournal.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 60,000 accelerators 2032-12 Design target 'Over 60,000' NVIDIA GPUs at full scale by 2032 across Kamloops and Vancouver sites. Plan; as_of is the target year. telus.comvantechjournal.com
Facility power 150 MW 2032 Design target Three-facility BC cluster: 85 MW initial BC Hydro allocation scaling to 150 MW by 2032 (May 2026 release). Value is the 2032 target. telus.comvantechjournal.com

The read

TELUS's three-site sovereign AI factory cluster in British Columbia, announced on 11 May 2026 under the federal Enabling Large-Scale Sovereign AI Data Centres initiative: an expansion of the existing Kamloops data centre (online later in 2026), a facility at 111 East 5th Avenue in Mount Pleasant, Vancouver (late 2026, scaling through 2028) and 150 West Georgia in downtown Vancouver (2029). TELUS says the cluster will scale to over 60,000 GPUs and 150 MW by 2032, starting from 85 MW secured from BC Hydro, using NVIDIA Vera Rubin and Grace Blackwell systems. Vantech Journal reports no federal funding has yet been committed. The system's site is the Kamloops expansion, the first to come online; the Vancouver sites are not separate rows. Successor to the operational Rimouski TELUS Sovereign AI Factory.

Timeline

Site & facility

TELUS Kamloops Data Centre

Location
Kamloops, BC, Canada
Utility
BC Hydro

Change history

Nearby in scale

The machines closest to TELUS BC Sovereign AI Cluster by accelerator count, smaller to larger.

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
vantechjournal.comnames system only-
telus.comnames system only-