Supercomputers/Systems/TELUS BC Sovereign AI Cluster
Canada · under construction · ai training
TELUS BC Sovereign AI Cluster
Also known as TELUS Sovereign AI Factory cluster (Kamloops and Vancouver)
Operated by TELUS at TELUS Kamloops Data Centre .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - TELUS builds and operates the three-site British Columbia cluster | TELUS | - | Reported | telus.com |
| Accelerator | - NVIDIA Vera Rubin and Grace Blackwell systems, over 60,000 GPUs at full scale by 2032 | NVIDIA | - | Reported | telus.com |
Engineering, funding and access
What TELUS BC Sovereign AI Cluster runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | NVIDIA Quantum InfiniBand and Spectrum-X Ethernet | 2026-05 | Operator stated | telus.com |
| Cooling design | Closed-loop liquid cooling, claimed to cut cooling energy by 80 percent and water use by 90 percent versus traditional data centres | 2026-05 | Operator stated | telus.comvantechjournal.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | NVIDIA AI Enterprise | 2026-05 | Operator stated | telus.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | Enabling Large-Scale Sovereign AI Data Centres initiative (Government of Canada)No funding committed at announcement | 2026-05 | Operator stated | telus.comvantechjournal.com |
| Procurement | Three B.C. sites (Kamloops expansion, M3 Mount Pleasant and 150 West Georgia with Westbank), over 60,000 GPUs and over 150 MW targeted by 2032; details still being worked out with the federal government | 2026-05 | Operator stated | telus.comvantechjournal.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 60,000 accelerators | 2032-12 | Design target | 'Over 60,000' NVIDIA GPUs at full scale by 2032 across Kamloops and Vancouver sites. Plan; as_of is the target year. | telus.comvantechjournal.com |
| Facility power | 150 MW | 2032 | Design target | Three-facility BC cluster: 85 MW initial BC Hydro allocation scaling to 150 MW by 2032 (May 2026 release). Value is the 2032 target. | telus.comvantechjournal.com |
The read
TELUS's three-site sovereign AI factory cluster in British Columbia, announced on 11 May 2026 under the federal Enabling Large-Scale Sovereign AI Data Centres initiative: an expansion of the existing Kamloops data centre (online later in 2026), a facility at 111 East 5th Avenue in Mount Pleasant, Vancouver (late 2026, scaling through 2028) and 150 West Georgia in downtown Vancouver (2029). TELUS says the cluster will scale to over 60,000 GPUs and 150 MW by 2032, starting from 85 MW secured from BC Hydro, using NVIDIA Vera Rubin and Grace Blackwell systems. Vantech Journal reports no federal funding has yet been committed. The system's site is the Kamloops expansion, the first to come online; the Vancouver sites are not separate rows. Successor to the operational Rimouski TELUS Sovereign AI Factory.
Timeline
- 2026-05-11 Announced source
Site & facility
TELUS Kamloops Data Centre
- Location
- Kamloops, BC, Canada
- Utility
- BC Hydro
Change history
- 2026-10-04 Added AI datacenter metrics for telus-bc-sovereign-ai-cluster
- 2026-10-02 Added TELUS BC Sovereign AI Cluster, 60,000 GPUs and 150 MW planned across Kamloops and Vancouver
Nearby in scale
The machines closest to TELUS BC Sovereign AI Cluster by accelerator count, smaller to larger.
- Nebius Mäntsälä Cluster · Finland, operational · 60,000 accelerators
- Samsung AI Megafactory · South Korea, planned · 50,000 accelerators
- Hyundai Motor Group Blackwell AI Factory · South Korea, planned · 50,000 accelerators
- SK Ulsan AI Data Center · South Korea, under construction · 60,000 accelerators
- Galaxy Helios (CoreWeave) · USA, operational · 63,151 accelerators
- Aurora · USA, operational · 63,744 accelerators
Related systems
Same operator
- TELUS Sovereign AI Factory (Rimouski) · Canada, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| vantechjournal.com | names system only | - |
| telus.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.