Supercomputers/Systems/Jairu
Brazil · operational · ai training
Jairu
Also known as USP Jairu AI cluster; Jairu supercomputer
Operated by USP CIAAM at USP CIAAM (Sao Paulo) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Supermicro HGX B200 servers | Supermicro | - | Reported | telesintese.com.br |
| Integrator | - Scherm Brasil named as integrator | Scherm Brasil | - | Reported | telesintese.com.br |
| Accelerator | NVIDIA B200 SXM Accelerators CUDA (Blackwell) · TSMC 4NP · 1,000 W 96 NVIDIA B200 SXM GPUs in 12 HGX 8x B200 nodes | NVIDIA | 96 reported | Reported | telesintese.com.br |
| CPU | - AMD EPYC processors on the five head nodes | AMD | - | Reported | telesintese.com.br |
| Interconnect | NVIDIA InfiniBand NDR (Quantum-2) Interconnect Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds InfiniBand NDR up to 800 Gb/s between nodes | NVIDIA | - | Reported | telesintese.com.br |
Engineering, funding and access
What Jairu runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 12 nodes12 HGX compute nodes with eight B200 GPUs each, plus five head nodes. | 2026-02 | Press report | telesintese.com.br |
| Storage capacity | 300 TBAbout 300 TB usable BeeGFS. | 2026-02 | Press report | telesintese.com.br |
| Interconnect and topology | InfiniBand NDR up to 800 Gb/s, Ethernet up to 200 Gb/s and NVLink within each compute node | 2026-02 | Press report | telesintese.com.br |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | BeeGFS parallel file system, about 300 TB usable | 2026-02 | Press report | telesintese.com.br |
| Programming and software stack | NVIDIA AI Enterprise and NVIDIA Base Command Manager for workload management, queues and user isolation | 2026-02 | Press report | telesintese.com.br |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Public tender with five bidders won by Scherm Brasil, direct import from the United States; Supermicro servers via Positivo Servers and Solutions; assembled 30 days after contract signing; R$40 million | 2026-02 | Press report | telesintese.com.br |
The read
The University of Sao Paulo's AI cluster for its Center for Artificial Intelligence and Machine Learning (CIAAM-USP), inaugurated on 13 February 2026 and described by USP as the largest in Latin America with Blackwell B200 GPUs. Press coverage lists 96 NVIDIA B200 SXM GPUs in 12 HGX 8x B200 compute nodes joined by NVLink, five AMD EPYC head nodes, InfiniBand NDR up to 800 Gb/s plus 200 Gb/s Ethernet, about 300 TB of BeeGFS storage and NVIDIA AI Enterprise with Base Command Manager, using Supermicro servers integrated by Scherm Brasil with Positivo Servers and Solutions as a partner. Procurement cost R$40 million (about US$8 million), imported directly from the United States and assembled within 30 days of the contract. No power or peak figure was found. The two outlets are independent but both relay USP's announcement, so the tier is reported.
Timeline
- 2026-02 First operational source
Site & facility
Change history
- 2026-10-04 Jairu added, the University of Sao Paulo's 96-GPU NVIDIA B200 AI cluster inaugurated in February 2026, Latin America's largest Blackwell B200 installation
Related systems
Same accelerator
- E2E Chennai B200 Cluster · India, operational
- Firebird Armenian AI Factory (DC-1) · Armenia, operational, 2026
- Industrial AI Cloud · Germany, operational, 2026
- Naver B200 4K Cluster · South Korea, operational, 2026
- Nexus (Georgia Tech) · USA, operational, 2026
- NIPA (Kakao) · South Korea, operational, 2026
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| inforchannel.com.br | names system, part and count | NVIDIA B200 SXM, NVIDIA InfiniBand NDR (Quantum-2) · counts: 96 |
| telesintese.com.br | names system, part and count | NVIDIA B200 SXM, NVIDIA InfiniBand NDR (Quantum-2) · counts: 96 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.