Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Cooling -
direct liquid cooling cabinets for the GPU accelerator partition, up to 2 MW for the whole system
Austrian Scientific Computing
- Reported ec.europa.eu

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
IT power 2 MW 2026-10 Design target EuroHPC tender: up to 2 MW made available for the complete system including compute, control and storage. ec.europa.eu

The read

EuroHPC's AI-optimised supercomputer for AI Factory Austria, to be hosted by Austrian Scientific Computing (ASC) in the TU Wien Science Center data center in Vienna. The EuroHPC tender descriptive document of 27 March 2026 sets an estimated contract value of EUR 32 million, a GPU-only accelerator partition in direct liquid cooling cabinets with at least 192 GB of high-bandwidth memory per accelerator, a CPU data-preparation partition, a European-silicon inference partition, multi-tier storage and up to 2 MW of power for the whole system. No supplier or GPU count has been chosen, so only the procurement requirements are recorded.

Timeline

Site & facility

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
ec.europa.eunames system only-
eurohpc-ju.europa.eunames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.