Open questions
Where sources disagree
Most datasets pick a winner and move on. When two credible sources give different figures for the same fact, we record
both, leave the row unchanged or blank, and list the conflict here with both links. Each one is a place where a reader
with the right knowledge, or an operator with a corrected page, could settle it.
106 open, 2 resolved. A conflict leaves this list only when a source
settles it, never because we prefer one side.
25.999 PFlop/s as recordedSource TOP500 and HLRS disagree; the recorded figure is left unchanged until one is confirmed.
Hawk: Core count
The recorded figure equals 5,632 nodes times 128 cores; no fetched page states the node count.
MeluXina: Rmax (Accelerator Module)
EuroHPC quotes a higher figure that may be a combined or later result; TOP500 is used.
Horizon: Peak performance
300 PFlop/s (November 2025 post)Source 360 PFlop/s (systems page)Source Both pages are TACC; neither figure is recorded.
Horizon: Production date
Spring 2026 (November 2025 post)Source Phase 1 in fall 2026 (systems page)Source The later page is treated as current, but no date is recorded.
CEA-HE: Grace Hopper node count
CEA's own October 2025 slides give the larger figure; the 477 is kept.
It is unclear whether either is facility or IT load, so power is left blank.
TOP500's figure is used.
Capella: Operating system
Rocky Linux 9.6 (TU Dresden ZIH)Source Possibly a benchmark image versus production; no OS edge is recorded.
Up to 50,000 GB200 NVL72 per building (Crusoe)Source About 201,600 B200 or B300 (analyst estimate)Source Crusoe's wording is ambiguous between racks and GPUs and the estimate names different parts, so no count is recorded.
SONiC-based Ethernet (Microsoft)Source NVIDIA Spectrum-X (trade press)Source No interconnect edge is recorded until one source resolves it.
Polaris: Peak performance
34.16 PFlop/s (ranked run)Source About 44 PFlop/s FP64 (announced full system)Source Probably different scopes: the announced system versus the run TOP500 measured.
Hunter: Rank in June 2025
TOP500's figure is used.
26.7 PFlop/s (planned, Gauss Centre)Source The lower figure is the pre-installation plan; TOP500's measured peak is used.
Miyabi: Storage capacity
11.3 PB (University of Tokyo)Source No capacity is recorded.
40 GPUs in 10 Dell XE9640 servers (press release)Source 80 GPUs in 20 nodes of four Max 1550 (docs)Source Both pages are TACC; no Intel GPU count is recorded.
400 Gb/s Cornelis CN5000 (press release)Source 100 Gb/s with an upgrade planned (docs)Source The press release may describe the target and the docs the state at the time.
Derecho: A100 GPU count
The 382 looks like a transposition; 328 matches 82 nodes of four.
Expanse: Operating system
Rocky Linux (SDSC guide)Source TOP500 may be stale; no OS edge is recorded.
Anvil: Operating system
Rocky Linux 8.4 (TOP500)Source No OS edge is recorded.
KISTI-6: Peak performance
600 PFlop/s (HPE release copy)Source 614 PFlop/s (DigitalToday)Source A third source gives 588; no peak is recorded.
100% fanless direct liquid cooling (HPE)Source 96% liquid cooled with rear-door exchangersSource No cooling edge is recorded.
JSC includes later additions; TOP500 is used.
25 PFlop/s (IBM and TOP500)Source 31.7 PFlop/s (TotalEnergies)Source TOP500's figure is used.
SQUID: Start of service
6 May 2021 (same page, news item)Source Only the month is recorded.
NVIDIA Quantum 1600 Gb/s InfiniBand two-level Clos fabricSource NVIDIA Quantum 200Gb/s InfiniBand networkSource Meta and NVIDIA describe the same fabric at different speeds, so no speed is recorded and no fabric part edge is added.
4.35 PFlop/s (TOP500 Rpeak)Source QCT also gives 2.7. No peak is recorded.
The iTnews figure may be a transposition. No core count is recorded.
Phase one launched 29 November 2019 at 100 PFlop/s (Huawei release)Source Settled in Shenzhen in September 2020 with tests from October 2020 (Shenzhen news)Source No first-operational date is recorded.
18.52 PFlop/s including GPUs (JSC)Source Likely different scopes; no peak is recorded.
about 98,304 CPU cores (JSC)Source No core count is recorded.
TOP500 may be stale; no OS edge is recorded.
nearly 32 PFlop/s (CINECA slides)Source No peak is recorded.
No core count is recorded.
293,376 cores, 11.75 PFlop/s (CEA)Source 197,120 cores, 12.04 PFlop/s (TOP500)Source TOP500 may describe a subset of nodes; neither is recorded.
2,292 nodes, InfiniBand HDR100 (CEA Joliot-Curie page)Source 2,286 nodes, EDR InfiniBand pruned fat tree (TGCC documentation)Source Both pages are CEA; no interconnect edge is recorded.
197,568 cores, 6,174 nodes (KAUST)Source No core count is recorded.
72,576 cores (NCAR CISL)Source No core count is recorded.
Xeon E5-2650 (NCAR CISL)Source Xeon E5-2670 8C 2.6GHz (TOP500)Source No CPU edge is recorded.
about 1.2 MW (NCAR CISL)Source The two may measure different things; no figure is recorded.
18.85 PFlop/s for the whole machine after expansion (LNCC, via Baguete)Source 20.26 PFlop/s for the 2024 entry (TOP500)Source The TOP500 entry alone exceeds LNCC total; no peak is recorded.
Comet: End of service
end of NSF service March 2021 (SDSC)Source 75-month operating period to July 2021 (NSF award record)Source A later Globus post says Comet was retired by August 2021; only the year is recorded.
Comet: NSF funding amount
$27.3 million total, $12 million initial (NSF award record)Source The award grew through supplements; no figure is recorded.
Nebulae: First operational / active date
2010 (TOP500 installation year, matching its June 2010 TOP500 debut)Source 2011 ("active since 2011")Source No source fetched for this pass reconciles the two; first_operational_date is left blank.
Lengau: Total storage capacity
4 PB Lustre (TOP500 news coverage)Source 5 PB total Dell storage (CHPC/CSIR unveiling release)Source CHPC/CSIR and TOP500 give different total storage figures for the same 2016 build; no capacity is recorded in system_components.
PARAM Siddhi-AI: Peak double-precision performance
5.27 PFlop/s (TOP500 Rpeak)Source 6.5 PFlop/s Peak DP (NVIDIA commissioning release)Source NVIDIA's own release and TOP500's measured Rpeak disagree on the machine's double-precision peak; TOP500's figure is recorded as Rpeak.
Serafin: Peak performance
147.456 TFlop/s, CCAD's current equipment pageSource 156 TFlop/s, as announced at the August 2021 launchSource The figure announced at Serafin's 2021 inauguration is about 6% higher than CCAD's own current technical page states for the deployed 60-node configuration; no Rpeak is recorded in the systems table.
6,144 CPU cores (AGH equipment page)Source 47,616 total cores (TOP500)Source TOP500's figure is used; AGH's 6,144 appears to count only the AMD EPYC CPU cores, not whatever TOP500 aggregates into its own core count.
632 A100 GPUs (Calcul Québec launch announcement)Source 636 GPUs across 80,720 cores (user portal hardware page)Source The portal total looks like it includes a few service or login nodes outside TOP500's ranked HPL partition of 76,320 cores; no single figure is recorded as verified.
Miztli: Core / processor count
5,132 processors (UNAM retrospective via unocero.com)Source TOP500's core count is used in the systems table; the press figure may be counting sockets rather than cores, or describing a slightly different point in the machine's history.
18,000 NVIDIA GB200 systems, operational (NVIDIA blog, 17 June 2026)Source 13,800 NVIDIA GB300 GPUs, financed by an $830M debt raise for completion around Q2 2026 (CNBC and Data Center Dynamics, March 2026, as reported by Let's Data Science)Source Both describe the same 44MW Bruyeres-le-Chatel facility but disagree on GPU generation and count; only NVIDIA's more recent figure is recorded on the system row.
Trinity: Operating period
First operational 2017-06 as recordedSource LANL lists 2015 to 2020, partly a phased Haswell then KNL build. Status now shows decommissioned 2020; the first-operational date is left as recorded until the phase dates are sourced.
Roadrunner: Processor and node count
6,563 dual-core Opterons each linked to a PowerXCell 8iSource 6,948 tri-blade nodes with 13,896 x86 coresSource The two counts differ by roughly a factor of two; no node count is shown on the page until one is confirmed.
BlueGene/L: End of its time at number one
Fastest until June 2008, peaking at 596 TFlop/sSource Number one from November 2004 to 2007Source LLNL and the NNSA page give different end dates for the same run at the top of the list.
224,162 as recorded (TOP500)Source 224,256 XT5 cores, 255,584 including the XT4 partitionSource ORNL counts partitions the TOP500 entry does not.
Cielo: Core count
142,304 for the Phase 2 configurationSource The CUG 2011 paper and the list differ by 32 cores.
138.2 PFlop/s as recorded (November 2023)Source 175.3 PFlop/s (June 2026)Source EuroHPC reports a higher June 2026 figure, which may be an unrecorded upgrade rather than a conflict.
Under construction as recordedSource Ranked 31st on the June 2026 TOP500 list; access expected shortlySource A TOP500 entry implies a running machine; EuroHPC says users do not yet have access. Left as recorded.
188 APU nodes and 256 CPU nodes, 752 MI300ASource 136 nodes and 544 MI300A (December 2023 plan)Source The 2023 plan was smaller than the operator describes today; the current HLRS figure is used.
ABCI 3.0: First operational date
General provision from 2025-01-24Source OECD.AI also says fully operational in January 2025 and the arXiv paper describes a rollout from November 2024.
20,480 nodes (architect paper)Source 22,680 nodes (June 2026 HPL run)Source Same article, two figures: the design paper and the benchmark run. The profile row uses the run.
Dogwood: First operational date
Operational for forecasting at 8 a.m. Eastern on 2022-06-28Source Delivery and production dates differ; both machines show the 2022-06-28 production date as a milestone event.
Titan: Decommission date
One day apart between two OLCF pages.
Building 1 operational by 2026-04-16Source Epoch AI cites a Microsoft post for the earlier date.
About 130 MW and about 100,000 H100 (SpaceX S-1)Source 340 MW IT and 425 MW facility (Epoch AI model)Source A regulatory filing and a third-party estimate of the same site.
352,000 cores as recordedSource About 390,000 cores (2,982 CPU nodes plus a 60-node GPU partition)Source DKRZ states a larger figure than TOP500; the press release gives 2,832 CPU nodes at the March 2022 start, so the configuration changed.
10.21 PFlop/s as recordedSource TUKE quotes a higher Rmax than the TOP500 entry.
Bengal: Cores and Rmax
107,520 cores, Rmax 7.20 PFlop/s as recordedSource 125,664 cores (LLNL); 6.134 PFlop/s in November 2023 (LLNL article)Source Possibly different submissions or scopes; the LLNL page and the TOP500 entry disagree.
Dane: Core count
123,648 cores as recordedSource 167,552 cores across 1,544 nodesSource The 7.041 PFlop/s Rmax matches; core count differs between LLNL and TOP500.
Electra: Core count and OS
124,416 cores as recorded (TOP500)Source 121,536 cores (NAS), OS TOSSSource NAS and TOP500 disagree on cores and OS.
Emmy: Core count and memory
120,296 cores, 513,792 GB (TOP500)Source 111,464 CPU cores, 478 TB (GWDG)Source GWDG counts CPU cores only; TOP500 may include more.
65,520 cores as recorded (TOP500)Source 720 nodes of 2 x 52 cores, 74,880 cores by arithmetic (ZIH)Source Hardware overview and the TOP500 entry differ.
3.27 PFlop/s CPU peak plus a separate 2.0 PFlop/s GPU testbed (NOAA)Source Scope difference is likely.
70,560 cores as recordedSource 73,228 cores stated; 256 nodes of 288 cores is 73,728Source EPCC article is internally inconsistent.
205 nodes, 820 L40S GPUs (Alliance)Source 252 Dell R760xa nodes, 1,008 GPUs (University of Alberta mirror)Source The primary Alliance wiki is behind bot protection; the mirror may reflect a later expansion.
18,836 cores, 161 nodes, 8 B300 as recordedSource 20,176 cores across 177 nodes and 136 B300 GPUs (same page, now)Source The recorded page changed since capture, and it contradicts itself on CPU core totals.
Approved January 2026 at up to 2.7 GW (recorded notes)Source Article says the 2.7 GW figure was presented to the commission in January 2026 and does not state an approvalSource Recorded wording may overstate the approval.
285 acres (recorded notes)Source About 308 acres (TeraWulf Q2 2026 release)Source Later company release gives a larger area.
Dammam, confirmed by Groq newsroom (recorded notes)Source Newsroom page has a Riyadh dateline and does not name Dammam; Dammam and 19,000 LPUs rest on Middle East AI NewsSource Location rests on one trade-press source.
280 H100 in 35 servers, cited to hessian.AI infrastructure pageSource The page describes only fortytwo (79 nodes, 632 A100) and does not mention fortythreeSource The cited page does not support the recorded figure.
Niagara: Decommissioning date
30 September 2025 on the Niagara Quickstart; 15 December 2025 on SciNet's historic-systems pageSource SciNet gives two different dates on its own pages (https://scinethpc.ca/?p=985 says 15 December 2025).
Marconi: End of service
Decommissioned 2025-12 as recordedSource Not restarted after the 19 October 2024 flood at the Casalecchio di Reno data centre; dismantling began on 31 JulySource CINECA's notice (https://www.hpc.cineca.it/newsletter/marconi-start-of-dismantling-phase-on-july-31st/) put the end of activity in the first quarter of 2025.
Decommissioned on 2026-09-30 as recordedSource Still listed among current systems on NSC's systems indexSource The index may lag the retirement; NSC's page also gives 61,056 cores against 64,512 recorded.
VSC-3: Decommissioning date
VSC-3 retired in May 2021 and its VSC-3+ extension in October 2022Source The recorded year may describe the extension rather than the original machine.
Operational, last listed in November 2012Source NARL planned to decommission it by September 2018Source No source we fetched confirms the switch-off itself.
9,298 cores and 1.8 TFlop/s peak as recordedSource 7,264 cores and 1.453 TFlop/s peak in the 1997 TOP500 entry; 9,632 cores and 3.207 TFlop/s after the 1999 upgradeSource The recorded timeline page also says the machine was built by IBM; TOP500 lists Intel. The 1997 entry is https://www.top500.org/system/168750/.
4.938 TFlop/s (the November 2000 list) as recordedSource 7.226 TFlop/s, at #1 on the June and November 2001 listsSource The recorded figure is the first, partial submission.
JUGENE: Rmax and power at debut
190.9 TFlop/s on the November 2007 list and 504 kW, as in the notesSource 167.3 TFlop/s on that edition and 560 kW, per FZJ's 2008 releaseSource 190.9 TFlop/s is TOP500's later headline figure for the system.
350 GH200 nodes and 20.67 PFlop/s peak as recordedSource 538 GH200 nodes (20.10 PFlop/s) plus 128 A100 nodes (5.31 PFlop/s) on NAS's current pageSource NAS appears to have expanded the system since the recorded figures.
About 2 PFlop/s peak at launch, as recordedSource About 16 PFlop/s, 322 nodes and 40,448 cores after the December 2025 expansionSource The recorded figure predates the expansion.
81,502 cores, 376 TB and 4.2 PFlop/s from HPCMP, as recordedSource 904 nodes, 86,784 cores, 391 TB, 536 A100 GPUs and 17 PFlop/s in contract coverageSource Blocks and Files reported the same contract (https://blocksandfiles.com/2020/09/24/compose-this-liqid-bags-another-supercomputer-deal/).
ETH Zurich site as recordedSource Euler II was tendered for, delivered to and operated at CSCS in LuganoSource Left unchanged until one source is confirmed.
23.5 EFLOPS, credited to an April 2026 Geely releaseSource Huanqiu gives 23.5 EFLOPS for the cloud compute behind Zeekr's driving system and does not name Xingrui; Bitauto gave 10.2 EFLOPS for Xingrui in January 2025Source Bitauto: https://www.bitauto.com/news/100197496948.html. The recorded source is paywalled.
Not ranked, no Rmax, as recordedSource No. 96 at 2.63 PFlop/s on the November 2019 TOP500Source Left unchanged until one source is confirmed.
Not ranked and no LINPACK result, as recordedSource TOP500 lists Bluecrab at 0.51 PFlop/s Rmax on 19,872 cores, ranked 172nd in November 2015Source Left unchanged until one source is confirmed.
Operations began on 1 December 2016 (Fujitsu); trial operation from December 2016 and official service from April 2017 (CCS Tsukuba)Source CCS outline: https://www.ccs.tsukuba.ac.jp/wp-content/uploads/sites/14/2019/03/ofp-outline.pdf
2027 target in the notesSource EPCC said on 22 September 2026 that users are expected in early 2028Source Left unchanged until one source is confirmed.
Ookayama campus (site isct-tokyo) as recordedSource Suzukakedai campus, building G4-A, in GSIC's FY2023 reportSource Left unchanged until one source is confirmed.
Eka: TOP500 entry
Entry 175324 (November 2007): 117.9 TFlop/s Rmax on 14,240 coresSource A second entry lists Eka from June 2008 (#9) to November 2013 at 132.8 TFlop/s Rmax on 14,384 cores and 786 kWSource Left unchanged until one source is confirmed.
About 95% equity, per The BlockSource Cipher owns 76% of Colchis LLC, per Baxtel, which also places the site in Tom Green CountySource Left unchanged until one source is confirmed.
355.14 TFlop/s Rpeak as recorded (TOP500)Source 668.75 TFlop/s peak on Tulane's CRSC page; 369 TFlop/s in Tulane's news storySource Left unchanged until one source is confirmed.
Kestrel: Peak performance
NLR says Kestrel expanded its supercomputing capacity to 56 petaflops (page updated 2026-08-12)Source Left unchanged until one source is confirmed.
3,964 cores (public partitions) as recordedSource 14,312 cores and 490 GPUs in an October 2024 survey co-written by operator staffSource Left unchanged until one source is confirmed.
Australis: Decommissioning date
Retired after nine years in production, listed among changes since the 2023 workshop in the Bureau of Meteorology's 2025 slidesSource The recorded year came from Wikipedia; production began in 2016, which would put retirement near 2025.
Decommissioned as recordedSource ITER's current documentation still lists more than 500 of the original E5-2670 nodes in service alongside new GPU nodesSource Left unchanged until one source is confirmed.
Supercomputing Wales says Hawk will be retired this summer as users move to Falcon; the portal names only Falcon and Sunbird as current systemsSource The access page is undated; the portal home (https://portal.supercomputing.wales/) was updated on 2 May 2025.
Resolved
TACC docs say Frontera is decommissioned and HPCwire reports retirement in October 2026; the system row now shows decommissioned 2026-10.
Resolved 2026-11-08: the poster's end date covers the whole Flow system and Nagoya's supercomputer page (https://icts.nagoya-u.ac.jp/ja/sc/) says Flow 2.0 began operation on 1 October, so Flow and Flow Type II are recorded as decommissioned in March 2026.