Supercomputers/Systems/Draco

Germany · decommissioned · hpc

Draco

Also known as MPCDF DRACO

Operated by MPCDF at MPCDF Garching .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
790.70 TFlop/s
HPL measured
Rpeak
1.04 PFlop/s
Rmax ÷ Rpeak
76.4%
Cores
28,128
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Draco, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax790.70 TFlop/s#157 of 242 · bottom 36%#58 of 95 · bottom 40%
Rmax ÷ Rpeak76.4 %#91 of 238 · top 38%#39 of 94 · top 41%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo NeXtScale nx360M5 cluster
Lenovo - Reported top500.orgmpcdf.mpg.de
Accelerator -
106 nodes with two PNY GTX980 GPUs each
NVIDIA 212
reported
Reported mpcdf.mpg.de
CPU Intel Xeon E5-2698 v3
CPUs
x86-64 · 16C · 2.3 GHz · 22 nm · 135 W
Intel Xeon E5-2698v3 16C 2.3GHz, about 880 nodes of 32 cores
Intel 1,760
estimated
Reported mpcdf.mpg.detop500.org
Interconnect Mellanox InfiniBand FDR
Interconnect
Fat tree · 56 Gb/s per 4x port · About 1 microsecond
InfiniBand FDR14 network
NVIDIA - Verified mpcdf.mpg.detop500.org

Engineering, funding and access

What Draco runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes1,005 nodes879 Haswell nodes at installation (Bits & Bytes 193) plus Broadwell nodes added in 2017: 64 from the Fritz Haber Institute (MPCDF's Draco page), 50 from MPSD and 12 from the MPI for Ornithology. 879 + 64 + 50 + 12 = 1,005.2017-12Operator stateddocs.mpcdf.mpg.dedocs.mpcdf.mpg.de
Total memory136 TBAfter the August 2017 expansion; 116 TB at installation (Bits & Bytes 193) and 128 TB after the January 2017 Broadwell nodes (Draco page).2017-12Operator stateddocs.mpcdf.mpg.dempcdf.mpg.de
Storage capacity1.5 PBDisk served by eight I/O nodes.2016-08Operator stateddocs.mpcdf.mpg.dempcdf.mpg.de
Interconnect and topologyInfiniBand FDR14 with non-blocking fat-tree islands of up to 1,024 cores (32 nodes) and 1:8 blocking between islands, so batch jobs ran within one island2016-08Operator stateddocs.mpcdf.mpg.dempcdf.mpg.de

Software

ItemDetailAs ofBasisSource
Job schedulerSlurmBits & Bytes 193 names Slurm as one of two departures from Hydra's software environment; Hydra used IBM LoadLeveler (Bits & Bytes 186).2016-08Operator stateddocs.mpcdf.mpg.de
Programming and software stackSoftware environment kept as close as possible to Hydra's, with Intel MPI for inter-node communication2016-08Operator stateddocs.mpcdf.mpg.de

Funding

ItemDetailAs ofBasisSource
Funded byMax Planck Institute for the Structure and Dynamics of Matter, which bought the 50 Broadwell nodes added in August 20172017-12Operator stateddocs.mpcdf.mpg.de
Funded byMax Planck Institute for Ornithology, which added 12 Broadwell nodes in 20172017-12Operator stateddocs.mpcdf.mpg.de
Funded byFritz Haber Institute of the Max Planck Society, which bought the 64 Broadwell nodes added in January 20172017-04Operator stateddocs.mpcdf.mpg.dempcdf.mpg.de
ProcurementDelivered in May 2016 and in production from July 2016 as an extension of Hydra, to cut Hydra's queue waiting times and meet the needs of new theory departments at institutes in Frankfurt, Hamburg and Stuttgart2016-08Operator stateddocs.mpcdf.mpg.de

The read

Draco is the HPC extension cluster installed in May 2016 at the Max Planck Computing and Data Facility: about 880 Haswell Xeon E5-2698 nodes of 32 cores at 2.3 GHz, 106 of them with two PNY GTX980 GPUs, on InfiniBand FDR14 with 1.5 PB of disk. TOP500 ranks it 160th in November 2016 (best rank) with 28,128 cores, 0.79 PFlop/s Rmax and 1.04 PFlop/s Rpeak, falling to 424th in June 2018. MPCDF says a January 2017 expansion with 64 Broadwell nodes bought by the Fritz Haber Institute brought the total to 30,688 cores and 1.12 PFlop/s peak, so the TOP500 figures describe the original Haswell part. MPCDF's history page (https://www.mpcdf.mpg.de/history) says Draco was decommissioned in 2022; its documentation (https://docs.mpcdf.mpg.de/bnb/207.html) dates the retirement of the main part to 15 July 2021.

Timeline

  • 2016-05 First operational source
  • 2016-11 Listed at #160 on the TOP500 (November 2016) source
  • 2017-08 Draco gained 50 Broadwell nodes bought by the MPI for the Structure and Dynamics of Matter and 12 from the MPI for Ornithology, reaching 32,528 cores, 136 TB of memory and 1.18 PFlop/s peak source
  • 2021-07-15 The main part of Draco was decommissioned after more than five years, while nodes owned by individual institutes kept running for their owners source
  • 2022 Decommissioned source
  • 2022-01-10 Access to the Draco login nodes was restricted to users from the institutes owning dedicated nodes: the Fritz Haber Institute, the MPI for the Structure and Dynamics of Matter and the MPI for Animal Behaviour source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

MPCDF Garching

Location
Garching, Germany
Commissioned
2021

Change history

Nearby in scale

The machines closest to Draco by Rmax, smaller to larger.

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
top500.orgnames system and partIntel Xeon E5-2698 v3, Mellanox InfiniBand FDR
mpcdf.mpg.denames system and partIntel Xeon E5-2698 v3, Mellanox InfiniBand FDR

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.