Operated by LG Uplus at Paju AI Data Center site (LG Uplus) .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - LG Uplus, announced as the operator of the Paju AI data center | LG Uplus | - | Reported | digitaltoday.co.kr |
The read
A planned LG group AI data center in Paju, Gyeonggi Province, with a stated capacity of 200 MW and room for up to 120,000 GPUs, due for completion in 2027 according to LG Uplus's chief technology officer. Digital Today names LG Uplus as operator and says the site will combine LG AI Research's EXAONE models, LG Uplus's enterprise AI platform and FuriosaAI neural processing units, with inputs from LG Electronics, LG Energy Solution and LG CNS; the JoongAng Daily piece gives the same 200 MW and 120,000 GPU figures but does not say which LG affiliate builds or operates it. The 120,000 is a capacity ceiling, not a purchase, and no GPU vendor or order is stated, so only the operator edge is recorded. The two articles restate one executive's statement, so the tier is reported. The site coordinates are the city of Paju, not a plot.
Timeline
No dated events recorded.
Site & facility
Paju AI Data Center site (LG Uplus)
- Location
- Paju, Gyeonggi, South Korea
Change history
- 2026-10-02 LG Paju AI Data Center added (planned, 200 MW)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| digitaltoday.co.kr | does not name this system | - |
| koreajoongangdaily.com | names system only | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.