Supercomputers/Systems/Tesla Cortex

USA · operational · ai training

Tesla Cortex

Operated by Tesla at Tesla Gigafactory Texas .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator NVIDIA H100 SXM5
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
Cortex, a ~50k H100 training cluster at Gigafactory Texas
NVIDIA 50,000
reported
Reported digitalassets.tesla.com
Accelerator NVIDIA H200 SXM
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
additional 16k H200 GPUs at Gigafactory Texas
NVIDIA 16,000
reported
Reported digitalassets.tesla.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 50,000 accelerators 2024-12 Operator stated Tesla Q4 2024 update: Cortex, about 50k H100 training cluster at Giga Texas, deployment completed in Q4; 16k H200 added by Q2 2025 digitalassets.tesla.com

The read

Tesla's quarterly decks report Cortex as a roughly 50,000 H100 training cluster at Gigafactory Texas, completed in Q4 2024, and 16,000 H200 GPUs added by Q2 2025 for a total of 67,000 H100 equivalents. Both figures are Tesla's own; nobody independent confirms them, so this is reported. The first-operational month is the month of the earliest deck that shows it running, not a stated go-live date. No power, FLOPS, interconnect or cooling vendor is disclosed.

Timeline

Site & facility

Tesla Gigafactory Texas

Location
Austin, TX, USA
Commissioned
2024

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
digitalassets.tesla.comnames system only-
digitalassets.tesla.comnames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.