Supercomputers/Systems/Ranger
USA · decommissioned · hpc
Ranger
Operated by Texas Advanced Computing Center at Texas Advanced Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 326.00 TFlop/s
- Rpeak
- 503.81 TFlop/s
- Rmax ÷ Rpeak
- 64.7%
- Cores
- 62,976
- Power
- 2.00 MW
- Per watt
- 0.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Ranger, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 326.00 TFlop/s | #17 of 125 · top 13% | #222 of 332 · bottom 34% |
| Energy efficiency | 0.2 GF/W | #48 of 71 · bottom 34% | #153 of 162 · bottom 7% |
| Rmax ÷ Rpeak | 64.7 % | #115 of 125 · bottom 9% | #248 of 331 · bottom 26% |
| Power draw | 2,000 kW | #11 of 72 · top 14% | #29 of 171 · top 16% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Sun Constellation System | Sun Microsystems | - | Verified | top500.orgapi.nsf.gov |
| CPU | AMD Opteron (Barcelona) 2.0GHz CPUs x86-64 · 4C · 2 GHz · 65 nm · 95 W four quad-core 2.0GHz AMD Opteron (Barcelona) processors per SunBlade x6420 node, 3,936 nodes | AMD | 62,976 reported | Verified | top500.orgrdworldonline.com |
| Interconnect | Sun Magnum InfiniBand DDR Switch Interconnect full non-blocking fat tree · DDR 4x, 20Gb/s per port Sun Magnum InfiniBand DDR switch (Sun Datacenter Switch 3456) | Sun Microsystems | - | Verified | top500.orgrdworldonline.com |
Engineering, funding and access
What Ranger runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | InfiniBand fabric built around Sun Microsystems' Magnum switchTACC article reproduced by R&D World; TOP500 lists the interconnect as InfiniBand | 2008 | Operator stated | rdworldonline.comtop500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | U.S. National Science Foundation (award 0622780)Award title: World-Class Science Through World Leadership in HPC; PI John R. Boisseau, University of Texas at Austin; runs 2006-10-01 to 2013-09-30 | 2006-10 | Operator stated | api.nsf.gov |
| Funding programme | NSF Track 2 acquisition; Ranger was the original Track 2 award, under NSF's Innovative HPC and Leadership-Class Computing programs | 2013 | Operator stated | api.nsf.gov |
| Stated cost | 59 USD m$59 million NSF award, which TACC calls the largest single NSF grant UT Austin had then received; the NSF record lists an estimated total of $58,930,228 and $64,733,304 obligated through FY2011. Project award, not a hardware-only price | 2006-10 | Operator stated | rdworldonline.comapi.nsf.gov |
| Procurement | Sun Microsystems Constellation system with AMD Opteron processors, funded under NSF award 0622780 from October 2006; project partners were Arizona State University, Cornell University and UT's Institute for Computational and Engineering SciencesThe NSF abstract describes a Sun Constellation Cluster; ASU names Sun Microsystems and Advanced Micro Devices as participants | 2008-02 | Operator stated | news.asu.eduapi.nsf.gov |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | National open-science community through peer-reviewed NSF TeraGrid allocations; NSF reports requests exceeded available time more than four times overASU's 2008 article calls Ranger the largest resource on NSF's TeraGrid | 2013 | Operator stated | api.nsf.govnews.asu.edu |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2008 to 2013: supported modelling of the 2011 Japanese earthquake, the BP oil spill, swine flu vaccine design, tornado prediction and hurricane forecasting, including work for NOAANSF project outcomes report: over its five-year life Ranger delivered more than 2.1 billion core-hours across more than 2.5 million jobs, over 1,000 peer-reviewed projects and more than 5,000 users | 2013 | Operator stated | api.nsf.gov |
The read
TACC's Sun Constellation cluster of 3,936 SunBlade x6420 nodes, each with four 2.0GHz quad-core AMD Opteron (Barcelona) processors, on Sun's own Magnum InfiniBand DDR switch fabric; fifth on the June 2008 TOP500 at 326 TFlop/s Rmax and the first NSF Track 2 system, the largest open-science machine in the US at debut. The NSF award record independently confirms the funding, the Sun Constellation hardware and the University of Texas at Austin as awardee. R&D World's account of the 2013 retirement independently gives the same 62,976-core count and names Sun Microsystems as designer of the Magnum switch, and states Ranger was decommissioned on 4 February 2013, its racks later donated to universities in South Africa, Tanzania and Botswana. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
- 2008-02-22 Ranger was formally dedicated in a ceremony at the University of Texas at Austin source
- 2008-06 Listed at #5 on the TOP500 (June 2008) source
- 2008-06 First operational source
- 2011 NSF extended Ranger's production period by one year, from February 2012 to February 2013 source
- 2013-02 Decommissioned source
- 2018-07 The Computer History Museum accepted Ranger's Sun Magnum InfiniBand switch into its permanent collection source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Texas Advanced Computing Center
- Location
- Austin, TX, USA
- Cooling
- Direct liquid cooling
- Commissioned
- 2007
Change history
- 2026-09-24 Added with a rank pointer on the edition where it ranked highest
Nearby in scale
The machines closest to Ranger by Rmax, smaller to larger.
Related systems
Same site
- Lonestar 4 · USA, decommissioned, 2011
- Stampede · USA, decommissioned, 2013
- Maverick (TACC) · USA, operational, 2014
- Lonestar 5 · USA, decommissioned, 2016
- Stampede2 · USA, decommissioned, 2017
- Frontera · USA, decommissioned, 2019
Same operator
- Longhorn · USA, operational, 2019
- Lonestar6 · USA, operational
- Horizon · USA, under construction
- Stampede3 · USA, operational, 2024
- Vista (TACC) · USA, operational, 2024
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| api.nsf.gov | names system only | · counts: 62976 |
| top500.org | names system, part and count | AMD Opteron (Barcelona) 2.0GHz · counts: 62976 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.