Supercomputers/Systems/Mistral Campus AI (Bruyeres-le-Chatel)

France · operational · ai training

Mistral Campus AI (Bruyeres-le-Chatel)

Operated by Mistral AI at Mistral Bruyeres-le-Chatel Data Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator NVIDIA GB200 NVL72
Accelerators
Arm CPU + CUDA GPU · TSMC 4NP
18,000 NVIDIA GB200 systems, per NVIDIA
NVIDIA 18,000
reported
Reported blogs.nvidia.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 18,000 accelerators 2026-06 Operator stated NVIDIA (Jun 2026) says the first deployment is operational with 18,000 GB200 'systems'; the 2025 announcement said 18,000 Grace Blackwell. Unit of count is vendor wording. blogs.nvidia.comnvidianews.nvidia.com
Facility power 44 MW 2026-06 Design target NVIDIA blog: Mistral building a 44 MW data center at Bruyeres-le-Chatel; first deployment already operational. Campus capacity, not measured draw. blogs.nvidia.com

Compute deals

All compute deals. Headline values are as announced, not additive.

The read

Mistral's first Campus AI data center, a 44-megawatt facility in Bruyeres-le-Chatel south of Paris, the first node in a stated roadmap to 200 megawatts across Europe by 2027 and, longer term, a planned 1.4-gigawatt campus built with Bpifrance, MGX and NVIDIA. NVIDIA's own blog (17 June 2026) says the first deployment is already operational with 18,000 NVIDIA GB200 systems; An earlier Mistral Compute product page described GB200 racks landing in July 2025 and GB300 arriving in December 2025 at the same site, but that page is no longer online and its corroboration is dropped, so the row rests on NVIDIA's post alone. A separate financing story from March 2026 (CNBC, Data Center Dynamics and other outlets, all tracing to the same $830 million debt-financing announcement) describes the same 44MW site as housing 13,800 NVIDIA GB300 GPUs rather than 18,000 GB200s; the two figures disagree on both GPU generation and count for what appears to be the same facility, so only NVIDIA's more recent operational figure is recorded here and the conflict is logged as an open question. No FLOPS or HPL figure is published, and no site operator besides Mistral itself was independently confirmed, so no integrator edge is recorded.

Timeline

Site & facility

Mistral Bruyeres-le-Chatel Data Center

Location
Bruyeres-le-Chatel, France
Substation
44 MW
Commissioned
2026

Where sources disagree

We record conflicts instead of picking a winner quietly. All open questions.

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
blogs.nvidia.comnames system, part and countNVIDIA GB200 NVL72 · counts: 18000

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.