Supercomputers/Systems/Korea National AI Computing Center
South Korea · under construction · ai training
Korea National AI Computing Center
Also known as CoreAIC
Operated by Korea AI Computing Center Co. at Solaseado Data Center Park, Haenam .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Samsung SDS-led consortium builds and operates the centre through a special-purpose company | Korea AI Computing Center Co. | - | Reported | korea.net |
| Accelerator | - NVIDIA B300 (Blackwell Ultra) for initial deployment then Vera Rubin, within a 15,000-chip target that also includes domestic NPUs (single-source detail) | NVIDIA | - | Reported | techtimes.com |
Engineering, funding and access
What Korea National AI Computing Center runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | Initial 400 billion won public-private investment (116 billion won public, 284 billion won private) via a special purpose company, with 2.5 trillion won planned in totalCapital contributions approved by the National Growth Fund review committee on 30 April 2026. | 2026-05 | Press report | en.sedaily.com |
| Funding programme | National Growth Fund capital contribution to the special purpose company | 2026-05 | Press report | en.sedaily.com |
| Procurement | Public tender in October 2025 with Samsung SDS consortium as sole bidder, preferred negotiation partner in March 2026, implementation and shareholders agreements signed by the Ministry of Science and ICT in May 2026 | 2026-05 | Press report | en.sedaily.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Industry, academia and think tanks can use the computing infrastructure at reasonable prices, with an R&D zone for domestic AI chip prototypes and an NPU zone for pilots then commercial services | 2026-08 | Press report | korea.net |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 15,000 accelerators | 2026-05 | Design target | Planned 15,000 advanced AI chips at Haenam, completion 2028 (Seoul Economic Daily). Korea.net gives the same figure. | en.sedaily.comkorea.net |
The read
South Korea's state-backed National AI Computing Center at the Solaseado Data Center Park in Haenam, South Jeolla. The Ministry of Science and ICT picked the Samsung SDS-led consortium (Naver Cloud, Samsung C&T, Kakao, Samsung Electronics, KT) as preferred partner in March 2026, a special-purpose company was set up in June 2026, and the groundbreaking was held on 3 August 2026. The target is 15,000 advanced AI chips (GPUs and domestic NPUs) by 2028 on a total investment of 2.5 trillion won, with completion in 2028 (The Elec and SBS also report partial compute from Samsung SDS data centers from 2027). TechTimes reports NVIDIA B300 (Blackwell Ultra) for the first deployment, then Vera Rubin, and a 40 MW power figure; neither appears in the other cited articles, so no power or capacity claim is recorded. Not yet operating.
Timeline
Site & facility
Solaseado Data Center Park, Haenam
- Location
- Haenam, South Jeolla, South Korea
Change history
- 2026-10-02 Added Korea National AI Computing Center, a 15,000-chip state-backed build in Haenam
Nearby in scale
The machines closest to Korea National AI Computing Center by accelerator count, smaller to larger.
- Eagle · USA, operational · 14,400 accelerators
- Leonardo · Italy, upgraded · 13,824 accelerators
- SINES Data Campus GB300 Deployment · Portugal, operational · 12,600 accelerators
- Marble (CoreWeave) · USA, operational · 15,000 accelerators
- Mistral Campus AI (Bruyeres-le-Chatel) · France, operational · 18,000 accelerators
- China Mobile Harbin Computing Center · China, operational · 18,000 accelerators
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| en.sedaily.com | names system only | - |
| korea.net | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.