COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Iridis 5

United Kingdom · operational · hpc

Iridis 5

Operated by University of Southampton at University of Southampton (Iridis) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
860.00 TFlop/s
HPL measured
Rpeak
1.31 PFlop/s
Rmax ÷ Rpeak
65.6%
Cores
20,400
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

How it compares

Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Iridis 5, and those in United Kingdom. Computed from our tables; a metric is ranked only when at least eight peers report it.

MetricValueAgainst its eraAgainst its country
Rmax860.00 TFlop/s#169 of 234 · bottom 29%#25 of 44 · bottom 45%
Rmax ÷ Rpeak65.6 %#150 of 229 · bottom 36%#32 of 44 · bottom 29%

Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo ThinkSystem SD530 nodes (TOP500)
Lenovo - Reported top500.org
Accelerator NVIDIA Tesla V100
Accelerators
CUDA (Volta GV100) · 5,120C · 1.53 GHz · 12 nm · 300 W
20 NVIDIA Tesla V100 16 GB cards
NVIDIA 20
reported
Reported southampton.ac.uk
Accelerator -
40 NVIDIA GTX 1080 Ti 12 GB cards
NVIDIA 40
reported
Reported southampton.ac.uk
CPU -
Intel Xeon Gold 6138 20C 2.0GHz: 464 dual-socket Intel nodes (arithmetic from node count)
Intel 928
estimated
Reported southampton.ac.uktop500.org
Interconnect Mellanox InfiniBand EDR
Interconnect
Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds
InfiniBand EDR (TOP500); Southampton page now cites HDR100
NVIDIA - Reported top500.orgsouthampton.ac.uk
Storage -
2.2 PB IBM Spectrum Scale file system
IBM - Reported southampton.ac.uk

The read

The University of Southampton's fifth-generation Iridis HPC cluster, a Lenovo ThinkSystem SD530 system with Xeon Gold 6138 20C CPUs on InfiniBand EDR. TOP500 lists 20,400 cores, 0.86 PFLOPS Rmax and 1.31 PFLOPS Rpeak, ranking it 252nd in November 2017 and 354th in June 2018. Southampton's facility page describes 464 dual-socket Intel nodes, AMD nodes, 20 NVIDIA V100 and 40 GTX 1080 Ti GPUs, 16 high-memory nodes with 1.5 TB RAM, HDR100 InfiniBand and 2.2 PB of IBM Spectrum Scale storage.

Timeline

  • 2017 First operational source
  • 2017-11 Listed at #252 on the TOP500 (November 2017) source
  • 2018-02 Iridis 5 was switched on, according to SDxCentral's 2024 report on its successor source

Public list appearances

Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.

Site & facility

Change history

Nearby in scale

The machines closest to Iridis 5 by Rmax, smaller to larger.

Same site

  • Iridis 4 · United Kingdom, operational, 2013
  • Iridis 6 · United Kingdom, operational

Same accelerator

  • Raad2 · Qatar, operational, 2017
  • RAIDEN · Japan, operational, 2017
  • ABCI · Japan, decommissioned, 2018
  • Ansel (LLNL) · USA, operational, 2018
  • Bridges · USA, decommissioned, 2016
  • Circe · USA, operational, 2018

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
southampton.ac.uknames system, part and countMellanox InfiniBand EDR · counts: 20
top500.orgnames system, part and countMellanox InfiniBand EDR · counts: 20

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading