Supercomputers/Systems/SuperMUC Phase 2
Germany · decommissioned · hpc
SuperMUC Phase 2
Operated by LRZ at Leibniz Supercomputing Centre, Garching .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 2.81 PFlop/s
- Rpeak
- 3.58 PFlop/s
- Rmax ÷ Rpeak
- 78.5%
- Cores
- 86,016
- Power
- 1.48 MW
- Per watt
- 1.9 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of SuperMUC Phase 2, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 2.81 PFlop/s | #35 of 230 · top 15% | #41 of 95 · top 43% |
| Energy efficiency | 1.9 GF/W | #94 of 180 · bottom 49% | #47 of 68 · bottom 32% |
| Rmax ÷ Rpeak | 78.5 % | #94 of 226 · top 41% | #36 of 94 · top 38% |
| Power draw | 1,481 kW | #28 of 182 · top 15% | #10 of 69 · top 13% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Lenovo NeXtScale nx360 M5, 3,072 nodes across six islands | Lenovo | - | Verified | top500.orgdoku.lrz.de |
| CPU | Intel Xeon E5-2697 v3 CPUs x86-64 · 14C · 2.6 GHz · 22 nm · 145 W Xeon E5-2697 v3 14C 2.62GHz, two per node | Intel | - | Verified | top500.orgdoku.lrz.de |
| Interconnect | Mellanox InfiniBand FDR Interconnect Fat tree · 56 Gb/s per 4x port · About 1 microsecond InfiniBand FDR14, pruned 4:1 tree between islands | NVIDIA | - | Verified | top500.orgdoku.lrz.de |
| Storage | IBM Spectrum Scale ESS (GPFS) Storage Parallel filesystem (GPFS), erasure-coded declustered RAID · 250 PB on Summit (Alpine) · About 2.5 TB/s IBM GPFS, shared with SuperMUC Phase 1 | IBM | - | Reported | doku.lrz.de |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid High Temperature Liquid Cooling, shared design with SuperMUC Phase 1 | Lenovo | - | Reported | doku.lrz.de |
Engineering, funding and access
What SuperMUC Phase 2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 3,072 nodesSix islands of 512 Lenovo NeXtScale nx360 M5 WCT nodes with two 14-core Xeon E5-2697 v3 each (86,016 cores) | 2019 | Operator stated | doku.lrz.de |
| Total memory | 194 TB64 GB per node, 256 GB on 8 nodes | 2019 | Operator stated | doku.lrz.de |
| Interconnect and topology | InfiniBand FDR14, non-blocking within each 512-node island and a 4:1 pruned tree between islands | 2019 | Operator stated | doku.lrz.de |
| Cooling design | Direct warm-water cooling of processors and memory as on Phase 1, with inlet water up to 40 C | 2019 | Operator stated | doku.lrz.de |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Shared SuperMUC IBM GPFS work and scratch (12 PB, 250 GB/s) and NetApp NAS home; jobs could not span Phase 1 and Phase 2 | 2019 | Operator stated | doku.lrz.de |
| Job scheduler | IBM LoadLeveler, with scheduling and job classes separate from Phase 1 | 2019 | Operator stated | doku.lrz.de |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | PRACE Tier-0 system open to European researchers, with allocations through the Gauss Centre for Supercomputing (GCS) and PRACE | 2019 | Operator stated | doku.lrz.de |
The read
The Haswell-generation extension to SuperMUC, 3,072 Lenovo NeXtScale nx360 M5 nodes across six network islands, 21st on the June 2015 TOP500. LRZ's own page and TOP500 independently name the NeXtScale hardware and the Xeon E5-2697 v3 processor, so those edges are verified; Rmax, Rpeak and core count are TOP500's alone. It shared SuperMUC's GPFS storage and warm-water cooling and retired alongside it at the end of 2019, ahead of SuperMUC-NG. Recorded as its own row because TOP500 lists it as a distinct system entry from Phase 1, the same split this dataset already applies to Snellius and MareNostrum 5. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
- 2015-06 Listed at #21 on the TOP500 (June 2015) source
- 2015-06 First operational source
- 2019-12 Decommissioned at year end, fully superseded by SuperMUC-NG source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Leibniz Supercomputing Centre, Garching
- Location
- Garching, Germany
- Cooling
- Direct warm-water cooling
- Commissioned
- 2006
Change history
- 2026-09-23 Added as its own row, matching how TOP500 lists it separately from SuperMUC Phase 1
Nearby in scale
The machines closest to SuperMUC Phase 2 by Rmax, smaller to larger.
- JFRS-1 · Japan, operational · 2.79 PFlop/s
- Volkswagen LX HPC 224Rk-1 · Norway, operational · 2.78 PFlop/s
- VSC-4 · Austria, operational · 2.73 PFlop/s
- AFI-NITY II · Japan, operational · 2.82 PFlop/s
- Freeman (ERDC) · USA, operational · 2.83 PFlop/s
- Henri · USA, operational · 2.88 PFlop/s
Related systems
Same site
- CoolMUC-2 · Germany, decommissioned, 2015
- CoolMUC-3 · Germany, decommissioned, 2017
- SuperMUC · Germany, decommissioned, 2012
- SuperMUC-NG · Germany, operational, 2018
- LRZ Cerebras CS-2 · Germany, operational, 2022
- HLRB-II · Germany, decommissioned, 2007
Same operator
- CoolMUC-4 · Germany, operational, 2024
- Blue Lion · Germany, planned
- HLRB SR8000-F1 · Germany, decommissioned, 2000
- SuperMUC-NG Phase 2 · Germany, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| doku.lrz.de | blocked our fetch | - |
| top500.org | names system and part | Intel Xeon E5-2697 v3, Mellanox InfiniBand FDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.