Supercomputers/Systems/Teton
USA · operational · hpc
Teton
Operated by INL .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 20.76 PFlop/s
- Rpeak
- 28.31 PFlop/s
- Rmax ÷ Rpeak
- 73.3%
- Cores
- 393,216
- Power
- 1.56 MW
- Per watt
- 13.3 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Teton, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 20.76 PFlop/s | #63 of 158 · top 39% | #30 of 332 · top 9% |
| Energy efficiency | 13.3 GF/W | #68 of 81 · bottom 17% | #32 of 162 · top 19% |
| Rmax ÷ Rpeak | 73.3 % | #80 of 155 · bottom 50% | #179 of 331 · bottom 47% |
| Power draw | 1,565 kW | #23 of 85 · top 26% | #39 of 171 · top 22% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX 4000 | Hewlett Packard Enterprise | - | Reported | top500.orgexecutivegov.com |
| CPU | AMD EPYC 9005 (Turin) CPUs x86-64 · 192C · 2.7 GHz · TSMC N3E · 500 W AMD EPYC 9965 192C 2.25GHz | AMD | - | Reported | top500.org |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Reported | top500.org |
| Operating system | Red Hat Enterprise Linux Operating systems Linux distribution · Open source, commercial support subscription RHEL 9.5 | Red Hat | - | Reported | top500.org |
Engineering, funding and access
What Teton runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 1,024 nodesEach node has 384 CPU cores and 768 GB of memory; HPE Cray EX4000 with AMD EPYC 9965 192-core CPUs | 2026-01 | Press report | executivegov.com |
| Total memory | 786 TBDerived from 1,024 nodes at 768 GB each | 2026-01 | Press report | executivegov.com |
| Interconnect and topology | HPE Slingshot-11 | 2026 | Operator stated | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | RHEL 9.5 with gcc 11.4, AMD AOCL-BLAS 5.1.0 and HPE Cray MPI | 2025-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funded by | DOE Office of Nuclear Energy through the Nuclear Science User Facilities (NSUF) program | 2026-01 | Press report | executivegov.com |
| Procurement | Delivered to Idaho National Laboratory's Collaborative Computing Center in September 2025About four times more powerful than Sawtooth, NSUF's previous flagship | 2025-09 | Press report | executivegov.com |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Nuclear Science User Facilities users nationwide, with access opened in January 2026 | 2026-01 | Press report | executivegov.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Ranked 85th on the November 2025 TOP500 with 20.76 PFlop/s Rmax, falling to 103rd by June 2026 | 2025-11 | Operator stated | top500.org |
The read
CPU-only HPE Cray EX 4000 system at Idaho National Laboratory for high-fidelity nuclear reactor and multiphysics simulation, four times the capacity of the earlier Sawtooth. TOP500 lists AMD EPYC 9965 192C 2.25GHz processors over Slingshot-11 running RHEL 9.5, installed 2025, with Rmax 20.76 PFlop/s, Rpeak 28.31 PFlop/s, 393,216 cores and 1,564.6 kW; it debuted at rank 85 on the November 2025 list and was 103rd in June 2026. ExecutiveGov, relaying INL, gives 1,024 compute nodes of 384 cores each (393,216 cores), delivery in September 2025 and user availability in January 2026 at INL's Collaborative Computing Center. The tier is reported because the ExecutiveGov piece is a secondary report of the lab's announcement.
Timeline
- 2025-09 Delivered to Idaho National Laboratory's Collaborative Computing Center as an HPE Cray EX4000 system source
- 2025-11 Listed at #85 on the TOP500 (November 2025) source
- 2026-01 First operational source
- 2026-01 Made available to Nuclear Science User Facilities users nationwide source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-02 Added Teton
Nearby in scale
The machines closest to Teton by Rmax, smaller to larger.
- Trinity · USA, decommissioned · 20.16 PFlop/s
- Fir · Canada, operational · 19.96 PFlop/s
- ABCI · Japan, decommissioned · 19.88 PFlop/s
- Piz Daint · Switzerland, decommissioned · 21.23 PFlop/s
- Bank of America HPC-AI · USA, operational · 21.46 PFlop/s
- Chervonenkis · Russia, operational · 21.53 PFlop/s
Related systems
Same operator
- Sawtooth · USA, operational, 2019
- Lemhi · USA, decommissioned, 2018
- INL Falcon · USA, decommissioned, 2014
- Fission (INL) · USA, operational, 2011
- Ice Storm · USA, operational, 2007
- Wind River · USA, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | AMD EPYC 9005 (Turin), HPE Slingshot-11 |
| executivegov.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.