Supercomputers/Systems/Microsoft Project Osmium

USA · operational · ai training

Microsoft Project Osmium

Also known as Microsoft Cumming Iowa AI campus

Operated by Microsoft at Microsoft Cumming Datacenter Campus .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Microsoft builds and operates the Iowa Azure AI supercomputer datacenters used by OpenAI
Microsoft - Reported news.microsoft.com
Accelerator -
Epoch AI estimate: about 25,000 NVIDIA A100 GPUs (SemiAnalysis also describes about 25,000 A100 in the first Iowa training cluster)
NVIDIA 25,000
estimated
Reported epoch.ai
Accelerator -
Epoch AI estimate: about 32,700 NVIDIA H100 GPUs (modelled)
NVIDIA 32,700
estimated
Reported epoch.ai
Accelerator NVIDIA B200 SXM
Accelerators
CUDA (Blackwell) · TSMC 4NP · 1,000 W
Epoch AI estimate: about 45,500 NVIDIA B200 GPUs (modelled)
NVIDIA 45,500
estimated
Reported epoch.ai

Engineering, funding and access

What Microsoft Project Osmium runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Cooling designAir-cooled chillers: Epoch AI counts 20 units with 18.1 MW capacityCounted from satellite imagery; Microsoft's feature gives no cooling figures.2026-06Third-party estimateepoch.ai

Access

ItemDetailAs ofBasisSource
How researchers get timeBuilt for OpenAI to train its models through Azure2023-09-08Operator statednews.microsoft.com

Results

ItemDetailAs ofBasisSource
Notable resultMicrosoft says its Iowa Azure supercomputer, built for OpenAI, was instrumental in developing GPT-4 (2023)Microsoft's feature does not say which campus holds the supercomputer; the Cumming site attribution comes from Epoch AI.2023-09-08Operator statednews.microsoft.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Accelerators 103,200 accelerators 2026-10-02 Third-party estimate About 25,000 A100, 32,700 H100 and 45,500 B200 (sum is ours). Epoch AI chip estimate (modelled from satellite imagery, cooling equipment and chip availability); not an operator disclosure. epoch.ai
Stated investment 7.2 USD bn 2026-10-02 Third-party estimate Epoch AI modelled build cost, compute plus construction, 2025 USD, scaled from IT power; not a disclosed spend. epoch.ai
IT power 190 MW 2026-10-02 Third-party estimate Epoch AI modelled IT power from satellite imagery and permits; not operator-stated. epoch.ai

The read

The Microsoft AI datacenter campus at Cumming, Warren County, Iowa that Epoch AI tracks as Project Osmium. Microsoft's own feature says the Iowa Azure supercomputer was built for OpenAI to train breakthrough models, that GPT-4 was developed on it and that the region has several datacenter campuses around West Des Moines; it names no GPUs, no MW and no Osmium code name, and it does not state that the supercomputer sits at the Cumming address, so the site attribution comes from Epoch. SemiAnalysis, summarised from its public article, describes the first Iowa training cluster as about 25,000 A100 GPUs in one building, with OpenAI using roughly 19 MW of two data halls for GPT-3.5. Epoch AI's AI data centers dataset (CC BY 4.0) estimates about 25,000 A100, 32,700 H100 and 45,500 B200 chips and 190 MW of IT power as of 2 October 2026, with the first building operational in January 2021. These are modelled estimates in the metrics table only. Separate from the 2020 Azure OpenAI supercomputer row, whose site is undisclosed.

Timeline

  • 2021-01 First operational source
  • 2023-06 Epoch AI estimates Building 2 operational, taking the campus to about 95 MW of IT load source
  • 2025-03 Epoch AI estimates Buildings 3 and 4 operational, about 190 MW of IT load, with the site complete by October 2025 source

Site & facility

Change history

Nearby in scale

The machines closest to Microsoft Project Osmium by accelerator count, smaller to larger.

Same operator

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
epoch.ainames system and partNVIDIA B200 SXM
news.microsoft.comnames system only-

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.