Supercomputers/Systems/Microsoft Project Osmium
USA · operational · ai training
Microsoft Project Osmium
Also known as Microsoft Cumming Iowa AI campus
Operated by Microsoft at Microsoft Cumming Datacenter Campus .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Microsoft builds and operates the Iowa Azure AI supercomputer datacenters used by OpenAI | Microsoft | - | Reported | news.microsoft.com |
| Accelerator | - Epoch AI estimate: about 25,000 NVIDIA A100 GPUs (SemiAnalysis also describes about 25,000 A100 in the first Iowa training cluster) | NVIDIA | 25,000 estimated | Reported | epoch.ai |
| Accelerator | - Epoch AI estimate: about 32,700 NVIDIA H100 GPUs (modelled) | NVIDIA | 32,700 estimated | Reported | epoch.ai |
| Accelerator | NVIDIA B200 SXM Accelerators CUDA (Blackwell) · TSMC 4NP · 1,000 W Epoch AI estimate: about 45,500 NVIDIA B200 GPUs (modelled) | NVIDIA | 45,500 estimated | Reported | epoch.ai |
Engineering, funding and access
What Microsoft Project Osmium runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Cooling design | Air-cooled chillers: Epoch AI counts 20 units with 18.1 MW capacityCounted from satellite imagery; Microsoft's feature gives no cooling figures. | 2026-06 | Third-party estimate | epoch.ai |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Built for OpenAI to train its models through Azure | 2023-09-08 | Operator stated | news.microsoft.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Microsoft says its Iowa Azure supercomputer, built for OpenAI, was instrumental in developing GPT-4 (2023)Microsoft's feature does not say which campus holds the supercomputer; the Cumming site attribution comes from Epoch AI. | 2023-09-08 | Operator stated | news.microsoft.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 103,200 accelerators | 2026-10-02 | Third-party estimate | About 25,000 A100, 32,700 H100 and 45,500 B200 (sum is ours). Epoch AI chip estimate (modelled from satellite imagery, cooling equipment and chip availability); not an operator disclosure. | epoch.ai |
| Stated investment | 7.2 USD bn | 2026-10-02 | Third-party estimate | Epoch AI modelled build cost, compute plus construction, 2025 USD, scaled from IT power; not a disclosed spend. | epoch.ai |
| IT power | 190 MW | 2026-10-02 | Third-party estimate | Epoch AI modelled IT power from satellite imagery and permits; not operator-stated. | epoch.ai |
The read
The Microsoft AI datacenter campus at Cumming, Warren County, Iowa that Epoch AI tracks as Project Osmium. Microsoft's own feature says the Iowa Azure supercomputer was built for OpenAI to train breakthrough models, that GPT-4 was developed on it and that the region has several datacenter campuses around West Des Moines; it names no GPUs, no MW and no Osmium code name, and it does not state that the supercomputer sits at the Cumming address, so the site attribution comes from Epoch. SemiAnalysis, summarised from its public article, describes the first Iowa training cluster as about 25,000 A100 GPUs in one building, with OpenAI using roughly 19 MW of two data halls for GPT-3.5. Epoch AI's AI data centers dataset (CC BY 4.0) estimates about 25,000 A100, 32,700 H100 and 45,500 B200 chips and 190 MW of IT power as of 2 October 2026, with the first building operational in January 2021. These are modelled estimates in the metrics table only. Separate from the 2020 Azure OpenAI supercomputer row, whose site is undisclosed.
Timeline
Site & facility
Change history
- 2026-10-04 Added Microsoft Project Osmium
Nearby in scale
The machines closest to Microsoft Project Osmium by accelerator count, smaller to larger.
- Google Pryor North TPU Campus · USA, operational · 101,400 accelerators
- STACKIT Lubbenau AI Data Center · Germany, under construction · 100,000 accelerators
- Denton (CoreWeave) · USA, operational · 100,000 accelerators
- Nscale Texas GB300 Campus (Microsoft) · USA, planned · 104,000 accelerators
- Microsoft Goodyear AI Datacenter · USA, operational · 116,400 accelerators
- Meta Prometheus · USA, operational · 166,015 accelerators
Related systems
Same operator
- Pioneer-SCUS · USA, operational, 2021
- Pioneer-WEU · Netherlands, operational, 2021
- Pioneer-WUS2 · USA, operational, 2021
- Voyager-EUS2 · USA, operational, 2021
- Microsoft Azure OpenAI supercomputer (2020) · USA, operational
- Pioneer-EUS · USA, operational, 2020
Same accelerator
- HiPerGator AI · USA, operational, 2021
- Microsoft Goodyear AI Datacenter · USA, operational, 2023
- Project Ceiba · USA, under construction
- Meta Rosemount (Minnesota) · USA, operational
- Minerva · USA, operational, 2024
- AICR · USA, operational
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| epoch.ai | names system and part | NVIDIA B200 SXM |
| news.microsoft.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.