du NextGenAI Supercluster

Also known as du and NextGenAI AI supercluster (Dubai Silicon Oasis)

Operated by du Telecom at du Dubai Silicon Oasis Data Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator -
NVIDIA B300 GPUs, 13+ MW of operational capacity, direct-to-chip liquid cooling; GPU count not disclosed
NVIDIA - Reported du.aedevelopingtelecoms.com

The read

AI supercluster built by UAE operator du with partner NextGenAI at du's Dubai Silicon Oasis data center, announced at GITEX Global on 17 October 2025 as a live GPU cluster customers can already access. du states 13+ MW of operational capacity on NVIDIA B300 GPUs with direct-to-chip liquid cooling, more than doubling the 5+ MW NVIDIA supercluster du deployed in 2024. The announcement does not give a GPU count, so quantity is left blank rather than estimated from megawatts.

Timeline

Site & facility

du Dubai Silicon Oasis Data Center

Location
Dubai Silicon Oasis, Dubai, United Arab Emirates
Cooling
Direct-to-chip liquid cooling

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
developingtelecoms.comblocked our fetch-
du.aenames system only-

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.