Supercomputers/Systems/ECMWF Cray XC40
United Kingdom · decommissioned · hpc
ECMWF Cray XC40
Also known as ECMWF Reading Cray HPCF; Cray XC40 (Reading)
Operated by ECMWF at ECMWF Data Centre (Reading) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 3.94 PFlop/s
- Rpeak
- 4.25 PFlop/s
- Rmax ÷ Rpeak
- 92.7%
- Cores
- 126,468
- Power
- 1.90 MW
- Per watt
- 2.1 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of ECMWF Cray XC40, and those in United Kingdom. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 3.94 PFlop/s | #36 of 242 · top 15% | #11 of 44 · top 23% |
| Energy efficiency | 2.1 GF/W | #94 of 176 · bottom 48% | #14 of 21 · bottom 36% |
| Rmax ÷ Rpeak | 92.7 % | #10 of 238 · top 4% | #3 of 44 · top 5% |
| Power draw | 1,897 kW | #19 of 178 · top 10% | #2 of 21 · top 5% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Cray XC40 | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | top500.org |
| CPU | Intel Xeon E5-2695 v4 CPUs x86-64 · 18C · 2.1 GHz · 14 nm · 120 W Intel Xeon E5-2695v4 18C 2.1 GHz | Intel | - | Reported | top500.org |
| Interconnect | Cray Aries Interconnect Dragonfly · About 10 GB/s per direction · Around 1 microsecond Cray Aries interconnect | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | top500.org |
| Operating system | Cray Linux Environment Operating systems Linux, Cray-customised · Proprietary layer over open-source Linux Cray Linux Environment | Cray HPENYSE
rolls up to Hewlett Packard Enterprise | - | Reported | top500.org |
Engineering, funding and access
What ECMWF Cray XC40 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 3,505 nodesCompute nodes in each of the two identical clusters in the 2014 XC30 phase (two 12-core Ivy Bridge CPUs and 64 GiB per node, 19 cabinets per cluster); the 2016 in-place Broadwell upgrade gave about 260,000 cores across both clusters | 2015 | Operator stated | ecmwf.intevents.ecmwf.int |
| Storage capacity | 32.6 PBDerived: 2 x 4.3 PB time-critical plus 2 x 12 PB research Lustre = 32.6 PB across both clusters in the XC40 era; in 2015 each XC30 cluster had about 6 PB at up to 250 GB/s | 2025-09 | Operator stated | events.ecmwf.intecmwf.int |
| Interconnect and topology | Cray Aries in a dragonfly topology; each blade's Aries chip links its four nodes over PCIe Gen3 at 16 GB/s per direction | 2015 | Operator stated | ecmwf.int |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Parallel filesystem | Lustre on Cray Sonexion appliances with separate time-critical and research pools for each cluster, cross-mounted between the two clusters, plus 38 TB of NetApp NFS storage for home directories | 2015 | Operator stated | ecmwf.intevents.ecmwf.int |
| Programming and software stack | Cray Linux Environment 5.2 at installation, with compute nodes in Extreme Scalability Mode | 2015 | Operator stated | ecmwf.int |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Two-phase service contract with Cray UK Ltd signed on 24 June 2013 after a 2012 to 2013 competitive procurement, covering supply and support to mid-2018; phase one was two XC30 clusters, upgraded in place to Broadwell in 2016 | 2015 | Operator stated | ecmwf.intevents.ecmwf.int |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | ECMWF operational forecasting and research; Member States have access to the HPCF, and their scientists may apply to use it through Special Projects | 2015 | Operator stated | ecmwf.int |
The read
ECMWF's Cray high-performance computing facility in its Reading data centre, listed on TOP500 as a Cray XC40 with Xeon E5-2695v4 18C 2.1 GHz and the Aries interconnect: 126,468 cores, 3.94 PFlop/s Rmax, 4.25 PFlop/s Rpeak and 1,897 kW, ranked 18 in June 2016 and 137 in November 2022 (the same TOP500 entry also carries earlier 2014 to 2015 rankings from an XC30-era configuration with 83,160 cores). ECMWF's migration notice says all operational forecasting moved from Reading to the new Bologna data centre on 18 October 2022, after which the Cray HPCF and its filesystems were unavailable from 1 November 2022 and shut down by the vendor. Its successor is the Atos system recorded as ECMWF HPCF-AA. A twin XC40 cluster in the same facility is not recorded separately.
Timeline
- 2013-06-24 ECMWF signed a two-phase service contract with Cray UK Ltd to supply and support the HPCF until mid-2018 source
- 2014-09-17 The first-phase Cray XC30 clusters began producing ECMWF's operational forecasts source
- 2016 First operational source
- 2016-06 Listed at #18 on the TOP500 (June 2016) source
- 2022-11-01 Decommissioned source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-02 Added ECMWF Cray XC40
Nearby in scale
The machines closest to ECMWF Cray XC40 by Rmax, smaller to larger.
- Nautilus · USA, operational · 3.9 PFlop/s
- Gemini (Petrobras) · Brazil, operational · 3.86 PFlop/s
- hotlum · France, operational · 3.81 PFlop/s
- Deucalion · Portugal, operational · 3.96 PFlop/s
- DGX SaturnV · USA, upgraded · 4 PFlop/s
- Raider · USA, operational · 4.02 PFlop/s
Related systems
Same site
- ECMWF VPP5000/100 · United Kingdom, decommissioned, 2000
- ECMWF VPP700/116 · United Kingdom, operational, 1996
Same operator
- ECMWF HPCF-AA · Italy, operational, 2022
- ECMWF Cray C916 · United Kingdom, operational, 1993
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| confluence.ecmwf.int | names system only | - |
| top500.org | names system and part | Intel Xeon E5-2695 v4, Cray Aries, Cray Linux Environment |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.