Supercomputers/Systems/Discovery 6
USA · operational · hpc
Discovery 6
Operated by ExxonMobil at ExxonMobil (undisclosed US site) .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 164.2 PFlop/s
- Rpeak
- 218.4 PFlop/s
- Rmax ÷ Rpeak
- 75.2%
- Cores
- 806,208
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Discovery 6, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 164.2 PFlop/s | #12 of 202 · top 5% | #6 of 332 · top 2% |
| Rmax ÷ Rpeak | 75.2 % | #101 of 199 · bottom 50% | #161 of 331 · top 48% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX254n | Hewlett Packard Enterprise | - | Reported | top500.org |
| Accelerator | NVIDIA GH200 Grace Hopper Superchip Accelerators Arm CPU + CUDA GPU · TSMC 4N 4,032 NVIDIA Grace Hopper Superchips | NVIDIA | - | Reported | top500.orgcorporate.exxonmobil.com |
| CPU | NVIDIA Grace CPUs Armv9 (Neoverse V2) · 72C · 3.1 GHz · TSMC 4N NVIDIA Grace 72C 3.1GHz | NVIDIA | - | Reported | top500.org |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds HPE Slingshot-11 | Hewlett Packard Enterprise | - | Reported | top500.org |
Engineering, funding and access
What Discovery 6 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | HPE Slingshot-11 | 2025 | Operator stated | corporate.exxonmobil.comtop500.org |
| Cooling design | 100 percent direct liquid cooling | 2025-03 | Operator stated | corporate.exxonmobil.com |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | ExxonMobil elastic Full Wavefield Inversion (eFWI) and 4D seismic processing workloads | 2025-03 | Operator stated | corporate.exxonmobil.com |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Built by HPE on the Cray Supercomputing EX4000 platform with 4,032 NVIDIA Grace Hopper Superchips, a partnership of HPE, NVIDIA and ExxonMobil; installation expected in the first half of 2025ExxonMobil describes it as up to 4 times faster than Discovery 5 | 2025-03-13 | Operator stated | corporate.exxonmobil.com |
The read
An oil-and-gas seismic-imaging cluster, the same functional class as Eni's HPC6/HPC7: ExxonMobil's own account ties it to 4D elastic Full Wavefield Inversion for its Stabroek Block assets. We found no independent tech-press confirmation we could directly fetch, so this row stays at reported tier on ExxonMobil's own statement plus TOP500's independent listing.
Timeline
- 2025-03 Announced source
- 2025-03-13 ExxonMobil, HPE and NVIDIA announce Discovery 6, an HPE Cray EX4000 system with 4,032 Grace Hopper Superchips, for installation in the first half of 2025 source
- 2025-06 First operational source
- 2025-11 TOP500 Rmax rose from 118.6 to 164.2 PFlop/s as the entry moved from 17th to 15th place source
- 2026-06 Listed at #17 on the TOP500 (June 2026) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Nearby in scale
The machines closest to Discovery 6 by Rmax, smaller to larger.
- Maximus-02 · USA, operational · 156.1 PFlop/s
- Summit · USA, decommissioned · 148.6 PFlop/s
- ABCI 3.0 · Japan, operational · 145.1 PFlop/s
- ISEG2 · Netherlands, operational · 202.4 PFlop/s
- Tuolumne · USA, operational · 208.1 PFlop/s
- Isambard-AI Phase 2 · United Kingdom, operational · 216.5 PFlop/s
Related systems
Same site
- Discovery 5 · USA, operational, 2022
Same accelerator
- DAEDALUS · Greece, under construction
- Isambard-AI Phase 2 · United Kingdom, operational, 2025
- JUPITER · Germany, operational, 2025
- KAIROS · France, operational
- KISTI-6 · South Korea, under construction
- Levante GPU Extension · Germany, operational, 2025
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| corporate.exxonmobil.com | names system and part | NVIDIA Grace |
| top500.org | names system and part | NVIDIA GH200 Grace Hopper Superchip, NVIDIA Grace, HPE Slingshot-11 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Inside a node
Why accelerators exist, what the memory hierarchy costs, and how the CPU and accelerator merged onto one package.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.