Supercomputers/Systems/IREN Redbank Campus

Australia · planned · ai training

IREN Redbank Campus

Also known as IREN Wagga Wagga campus

Operated by IREN at IREN Redbank Site (Wagga Wagga) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
IREN develops the 900 MW Redbank campus
IREN - Reported w.mediabebeez.eu

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 900 MW 2026-10 Design target IREN proposal for the Redbank campus; early assessment, not secured power w.mediabebeez.eu

The read

IREN's proposed second Australian campus after `iren-bundey-campus`: 900 MW near Wagga Wagga, New South Wales, west of the Gregadoo Waste Management Centre on land with existing transmission infrastructure, with more than AU$10 billion of investment. IREN calls it an early assessment with a grid connection targeted from 2029, staged over six to eight years and outside its announced 5 GW secured-power portfolio; a scoping report to the NSW planning department was reportedly due at the end of October 2026. IREN would fund its own transmission link and contract new renewable generation and storage, with closed-loop cooling. CDC Data Centres separately proposes a 1.4 GW campus in the same Wagga cluster. No GPU type, tenant or count is stated.

Timeline

Site & facility

IREN Redbank Site (Wagga Wagga)

Location
Wagga Wagga, Australia
Cooling
Closed-loop cooling