Supercomputers/Systems/ASCI Blue-Pacific
USA · decommissioned · classified
ASCI Blue-Pacific
Also known as ASCI Blue-Pacific SST
Operated by Lawrence Livermore National Laboratory at Livermore Computing Center .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 2.14 TFlop/s
- Rpeak
- 3.86 TFlop/s
- Rmax ÷ Rpeak
- 55.6%
- Cores
- 5,808
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of ASCI Blue-Pacific, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 2.14 TFlop/s | #2 of 33 · top 3% | #310 of 332 · bottom 8% |
| Rmax ÷ Rpeak | 55.6 % | #29 of 33 · bottom 14% | #295 of 331 · bottom 12% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - IBM RS/6000 SP | IBM | - | Verified | top500.orgasc.llnl.gov |
| CPU | IBM PowerPC 604e CPUs PowerPC · 1C · 0.332 GHz · 350 nm PowerPC 604e 332MHz, 5,808 cores (SST partition) | IBM | 5,808 reported | Verified | top500.orgasc.llnl.gov |
| Interconnect | IBM SP Switch Interconnect multi-stage Omega network · 150 MB/s per node IBM SP Switch | IBM | - | Reported | top500.org |
| Operating system | IBM AIX Operating systems Unix (System V-derived) · Proprietary AIX | IBM | - | Reported | top500.org |
Engineering, funding and access
What ASCI Blue-Pacific runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Total memory | 2.6 TBLLNL gives 2.6 TB for the machine; GCN (November 1999) gives 2.6 TB for the classified two-thirds. | 1999-11 | Operator stated | asc.llnl.govroute-fifty.com |
| Storage capacity | 80 TBAlmost 80 TB of disk, much of it scratch, on the classified two-thirds of the machine. | 1999-11 | Press report | route-fifty.com |
| Interconnect and topology | IBM SP SwitchTOP500 list entry | 1999-11 | Operator stated | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | IBM AIXTOP500 list entry | 1999-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | DOE Accelerated Strategic Computing Initiative (ASCI); half of the ASCI Blue procurement, whose other machine went to Los Alamos | 1996-07-28 | Press report | nextgov.com |
| Stated cost | 93 USD mContract value reported by FCW in July 1996; GCN described the delivered machine as $94 million in November 1999. | 1996-07 | Press report | nextgov.comroute-fifty.com |
| Procurement | IBM won the $93 million ASCI Blue contract for Livermore in July 1996 for an RS/6000 SP of 3 to 4 TFlop/s; initial components were due by the end of September 1996 and a full-scale demonstration by the end of 1998 | 1996-07-28 | Press report | nextgov.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 1999: Gordon Bell Award to an LLNL, University of Minnesota and IBM team for a simulation of a shock wave crossing a two-fluid interface on 5,832 processors, the largest calculation of its type at the time | 1999-11 | Operator stated | asc.llnl.gov |
The read
LLNL's IBM RS/6000 SP. Blue-Pacific was built as three named partitions and TOP500 lists each separately; this row is the SST (Simulation and Test) partition, its best-ranked entry, second on the November 1999 TOP500 at 2.144 TFlop/s Rmax. LLNL's own history page independently gives the whole complex as 5,856 PowerPC 604e processors installed in fall 1998 with about 3.9 TFlop/s peak, close enough to TOP500's 5,808-core, 3.8565 TFlop/s Rpeak SST partition to treat as the same machine, and states Blue-Pacific ran the first three-dimensional primary weapon simulation in November 1999. The CTR and TR partitions TOP500 lists separately are not recorded as their own rows. TOP500 is the only source for Rmax, Rpeak and core count, so the tier is reported.
Timeline
- 1996-07 IBM won a $93 million ASCI Blue contract to build an RS/6000 SP system of 3 to 4 TFlop/s for Livermore source
- 1998-11 First operational source
- 1999-11 Listed at #2 on the TOP500 (November 1999) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Livermore Computing Center
- Location
- Livermore, CA, USA
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1996
Change history
- 2026-09-24 Added (SST partition, TOP500 lists Blue-Pacific as three separate entries)
Nearby in scale
The machines closest to ASCI Blue-Pacific by Rmax, smaller to larger.
- Jacquard (NERSC) · USA, operational · 0 PFlop/s
- Weta Digital BladeCenter Cluster · New Zealand, operational · 0 PFlop/s
- UTokyo SR8000/MPP · Japan, decommissioned · 0 PFlop/s
- SuperMike · USA, operational · 0 PFlop/s
- Cheetah (ORNL) · USA, decommissioned · 0 PFlop/s
- MPI/IPP Garching IBM p690 · Germany, decommissioned · 0 PFlop/s
Related systems
Same site
- ASCI White · USA, decommissioned, 2000
- MCR · USA, decommissioned, 2002
- BlueGene/L · USA, decommissioned, 2004
- Thunder · USA, decommissioned, 2004
- ASC Purple · USA, decommissioned, 2005
- Atlas (LLNL) · USA, decommissioned, 2007
Same operator
- Hera (LLNL) · USA, operational, 2009
- Edge (LLNL) · USA, operational, 2010
- Cray-2 · USA, decommissioned, 1985
- Zin · USA, decommissioned, 2011
- Cab · USA, decommissioned, 2012
- Sequoia · USA, decommissioned, 2012
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| asc.llnl.gov | names system and part | IBM PowerPC 604e |
| top500.org | names system, part and count | IBM PowerPC 604e · counts: 5808 |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.