COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Isambard 3

United Kingdom · operational · hpc

Isambard 3

Also known as GW4 Isambard 3

Operated by University of Bristol at National Composites Centre, Bristol .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
vendor peak
Rpeak
2.70 PFlop/s
Rmax ÷ Rpeak
-
Cores
55,296
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
HPE Cray XD224 air-cooled servers
Hewlett Packard Enterprise - Reported cug.orgnvidianews.nvidia.com
CPU NVIDIA Grace
CPUs
Armv9 (Neoverse V2) · 72C · 3.1 GHz · TSMC 4N
384 NVIDIA Grace CPU Superchips (two 72-core Grace CPUs each, 144 cores per node)
NVIDIA 384
reported
Reported cug.orgnvidianews.nvidia.com
Interconnect HPE Slingshot-11
Interconnect
Dragonfly · 200 Gb/s per port · Around 2 microseconds
HPE Slingshot 11 at 200 Gbps
Hewlett Packard Enterprise - Reported cug.org

Engineering, funding and access

What Isambard 3 runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Compute nodes384 nodesEach node is one NVIDIA Grace CPU Superchip (2 x 72 cores); NVIDIA's 2023 announcement also gives 384 Grace CPU Superchips2026Operator stateddocs.isambard.ac.uknvidianews.nvidia.com
Total memory92.16 TBDerived: 384 nodes x 240 GB (2 x 120 GB) = 92,160 GB2026Operator stateddocs.isambard.ac.uk
Interconnect and topologyHPE Slingshot 11 with one 200 Gb/s Cassini NIC per node2026Operator stateddocs.isambard.ac.uk
Cooling designHoused in a self-cooled, self-contained HPE Performance Optimized Data Center (POD) at the National Composites Centre2023-05Operator statedbristol.ac.uk

Software

ItemDetailAs ofBasisSource
Parallel filesystemLustre on an HPE Cray ClusterStor E1000, shared by Isambard 3 Grace and MACS; quotas of 100 GiB home, 20 TiB project and 5 TiB scratch, plus 512 GiB node-local storageThe ClusterStor E1000 is named in the May 2023 announcement2026Operator stateddocs.isambard.ac.ukbristol.ac.uk
Job schedulerSlurmDefault grace partition with a 24-hour maximum walltime2026Operator stateddocs.isambard.ac.uk

Funding

ItemDetailAs ofBasisSource
Funded byUK Research and Innovation (UKRI), 10 million pounds announced in May 2023The announcement does not name a research council2023-05Operator statedbristol.ac.uk

Access

ItemDetailAs ofBasisSource
How researchers get timeAllocated by external bodies: periodic UKRI Tier 2 HPC calls for UK research organisations eligible for UKRI funding, and internal processes at each GW4 university (Bath, Bristol, Cardiff, Exeter); BriCS itself does not allocate time2026Operator stateddocs.isambard.ac.uk
Access pagedocs.isambard.ac.uk/access2026Operator stateddocs.isambard.ac.uk

The read

The Bristol Centre for Supercomputing's CPU-only Arm service for UKRI, funded with GBP 10 million and shared by the GW4 universities of Bristol, Bath, Cardiff and Exeter. The CUG 2025 evaluation paper describes 384 HPE Cray XD224 nodes, each an NVIDIA Grace CPU Superchip with 144 Arm Neoverse V2 cores, 55,296 cores in six air-cooled racks of 64 servers, joined by 200 Gbps Slingshot 11 and hosted in the same modular data centre as Isambard-AI phase 1; the service moved into operation from January 2025. The 2.7 PFlop/s figure is the FP64 peak NVIDIA gave when announcing the system in 2023, not a measured HPL result, and NVIDIA's 'less than 270 kW' was a design target, so no power figure is recorded. No separate TOP500 entry for Isambard 3 was found.

Timeline

Site & facility

National Composites Centre, Bristol

Location
Bristol, United Kingdom
Cooling
Direct liquid cooling
Commissioned
2024

Change history

Same site

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
cug.orgdoes not name this system-
nvidianews.nvidia.comnames system, part and countNVIDIA Grace · counts: 384

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading