COMPUTE ATLAS Supercomputer supply-chain graph
1345 systems 511 sites Sourced data

Supercomputers/Systems/PORTS-Pike Technology Campus

USA · planned · ai training

PORTS-Pike Technology Campus

Also known as Portsmouth Site AI data center; Piketon Ohio

Operated by SB Energy at Portsmouth Site (Piketon) .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1263 of 1345 systems have a readable citation that names them, and 56 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
SB Energy will build, own and operate the campus; OpenAI is the 20-year lease customer
SB Energy
- Reported rebusinessonline.com
Accelerator -
NVIDIA GPUs, CPUs and servers via the NVIDIA DSX AI factory platform
NVIDIA - Reported rebusinessonline.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
Facility power 10,000 MW 2026-08-17 Design target Reported as 8 GW for compute plus 2 GW for cooling and power conversion; REBusiness reports a minimum 10 GW power capacity commitment by SB Energy and SoftBank. allwork.spacerebusinessonline.com
IT power 8,000 MW 2026-08-18 Design target OpenAI lease: about 8 GW-IT, made of 4.25 GW of initial AI factory capacity and 3.75 GW of optional expansion. rebusinessonline.com

The read

An AI data center redevelopment of the decommissioned Portsmouth Gaseous Diffusion Plant near Piketon in Pike County, Ohio, on land leased from the US Department of Energy and announced as a public-private project with SB Energy on 7 April 2026. REBusiness reports that OpenAI signed a 20-year lease on 18 August 2026 for about 8 GW-IT (4.25 GW of AI factory capacity initially and 3.75 GW of optional expansion), that SB Energy will build, own and operate the campus, that NVIDIA is investing 1.5 billion dollars and supplying the DSX AI factory platform, that the first 800 MW arrives in 2028 and that the build-out runs through 2032. A second outlet adds 2 GW for cooling and power conversion for a 10 GW total. The DOE page confirms the SB Energy partnership but gives no capacity. Nothing is built, so it stays planned.

Timeline

Site & facility

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
rebusinessonline.comnames system only-
energy.govnames system only-

Checked 2026-10-13 by pnpm verify. Re-run it and the table changes with the web.