Supercomputers/Systems/Amber
USA · operational · hpc
Amber
Also known as SNL/NNSA CTS-2 Amber
Operated by Sandia National Laboratories .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 9.51 PFlop/s
- Rpeak
- 10.84 PFlop/s
- Rmax ÷ Rpeak
- 87.7%
- Cores
- 169,344
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Amber, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 9.51 PFlop/s | - | #54 of 332 · top 16% |
| Rmax ÷ Rpeak | 87.7 % | - | #35 of 331 · top 10% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Dell PowerEdge C6620 and R760 servers (TOP500 label PowerEdge C6220), CTS-2 | Dell Technologies | - | Reported | top500.orgllnl.gov |
| CPU | - Intel Xeon Platinum 8480+ 56C 2GHz (4th Gen Xeon Scalable) | Intel | - | Reported | top500.orgllnl.gov |
| Interconnect | Omni-Path Architecture Interconnect Fat tree · 100 Gb/s per port · About 1 microsecond Cornelis Networks Omni-Path | Cornelis Networks | - | Reported | top500.org |
| Operating system | Tri-Lab Operating System Stack Operating systems Linux distribution, RHEL-derived, HPC-tuned · Open source, LLNL-maintained Linux/TOSS | Lawrence Livermore National Laboratory | - | Reported | top500.org |
Engineering, funding and access
What Amber runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | Cornelis Networks Omni-Path Express, 200 Gb/sDell PowerEdge C6620 and R760 servers with 4th-generation Intel Xeon Scalable processors in about 1.5 PFlop/s scalable units | 2023-11 | Operator stated | llnl.gov |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | Tri-Laboratory Operating System Stack (TOSS) and the Tri-Lab Common Environment | 2023-11 | Operator stated | llnl.gov |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Funding programme | NNSA Advanced Simulation and Computing (ASC) program, second Commodity Technology Systems contract (CTS-2) | 2023-11 | Operator stated | llnl.gov |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | NNSA tri-lab stockpile stewardship simulation workload as a Sandia capacity workhorse system | 2023-11 | Operator stated | llnl.gov |
The read
Sandia's second CTS-2 commodity cluster, sibling of Stout, for the NNSA simulation workload. TOP500 lists Dell PowerEdge servers with Xeon Platinum 8480+ 56C 2GHz hosts on Cornelis Networks Omni-Path under Linux/TOSS, installed 2022 per TOP500, with 169,344 cores, Rmax 9.51 PFlop/s and Rpeak 10.84 PFlop/s; it debuted at rank 98 on the June 2024 list and was 196th in June 2026. Livermore's November 2023 article names Amber as the fourth CTS-2 system and says the CTS-2 scalable units use Dell PowerEdge C6620 and R760 servers with 4th Gen Intel Xeon Scalable processors, but it gives no Amber-specific figures, so the tier is reported. The campus is not stated, so the site is left blank.
Timeline
- 2024-06 Listed at #98 on the TOP500 (June 2024) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-07 Added Amber (sandia)
Nearby in scale
The machines closest to Amber by Rmax, smaller to larger.
- Trillium · Canada, operational · 9.49 PFlop/s
- NVIDIA DGX SuperPOD (V100) · USA, operational · 9.44 PFlop/s
- JURECA-DC · Germany, operational · 9.33 PFlop/s
- Stout · USA, operational · 9.53 PFlop/s
- Cambridge-1 · United Kingdom, operational · 9.68 PFlop/s
- ROMEO-2025 · France, operational · 9.86 PFlop/s
Related systems
Same operator
- Hops · USA, operational
- Stout · USA, operational
- Intel Paragon XP/S 140 · USA, decommissioned, 1993
- ASCI Red · USA, decommissioned, 1997
- Cplant Siberia · USA, decommissioned, 1999
- Red Storm · USA, decommissioned, 2005
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Omni-Path Architecture |
| llnl.gov | names system and part | Omni-Path Architecture, Tri-Lab Operating System Stack |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.