USA · decommissioned · ai training

Tesla Dojo

Also known as Dojo ExaPod

Operated by Tesla .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
vendor peak
Rpeak
1.10 EFlop/s
Rmax ÷ Rpeak
-
Cores
1,062,000
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Accelerator Tesla Dojo D1
Accelerators
Custom Dojo ISA (64-bit scalar + 64-byte SIMD vector) · 354C · 2 GHz · 7 nm
3,000 Dojo D1 chips across 120 Training Tiles in the full ExaPOD design
Tesla
3,000
reported
Reported nextplatform.comen.wikipedia.org

Engineering, funding and access

What Tesla Dojo runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Total memory14.3 TBDerived: 1.3 TB SRAM + 13 TB high-bandwidth DRAM = 14.3 TB, Tesla's figures for one ExaPOD given at AI Day 2022; The Next Platform lists the same 1.3 TB SRAM and 13 TB HBM for a 1 EFlop/s V1 training matrix.2022-09Press reportelectrek.conextplatform.com
Interconnect and topology2D mesh linking D1 dies within and across training tiles, a third Z plane through Dojo Interface Processors, and Tesla Transport Protocol over PCIe 4.0 and Ethernet (400 Gb/s ports) into a fat-tree switch networkEach D1 die has 576 bidirectional SerDes channels giving 8 TB/s across its four edges; each training tile has 36 TB/s of off-tile bandwidth.2022-08Press reportnextplatform.com
Cooling designTesla built its own high-powered cooling and power delivery for the Dojo cabinets; each 25-chip training tile draws 15 kWTesla's principal system engineer for Dojo said the team had to re-examine every aspect of data center infrastructure; the 15 kW tile figure is from The Next Platform.2022-09Press reportelectrek.conextplatform.com

Software

ItemDetailAs ofBasisSource
Programming and software stackPyTorch, on Tesla's own Dojo software stack, which manages resource allocation because D1 cores have no virtual memory2022-08Press reportnextplatform.com

Funding

ItemDetailAs ofBasisSource
Funded byTesla; Musk said in July 2023 that the company planned to spend more than $1 billion on Dojo through 20242023-07Press reporttechcrunch.com
ProcurementDesigned and built in-house by Tesla around its own D1 chip, fabricated by TSMC on a 7 nm process; six training tiles make a system tray and two trays with host assembly fill a cabinetChip and fab from The Next Platform (Hot Chips 34); tray and cabinet make-up from Electrek's AI Day 2022 report.2022-09Press reportnextplatform.comelectrek.co

The read

Tesla's from-scratch AI-training supercomputer, built around its own D1 processor rather than merchant GPUs. Unveiled at Tesla's first AI Day on 19 August 2021 with the D1 chip and Training Tile module, detailed further at Hot Chips 34 in August 2022, and put into production per Tesla's own Q2 2023 shareholder update (19 July 2023), independently corroborated by TechCrunch's retrospective timeline and by Digitimes' contemporaneous reporting. The full ExaPOD design combines 120 Training Tiles of 25 D1 chips each, 3,000 chips and 1,062,000 usable cores, rated at roughly 1.1 exaflops BF16/CFP8 in Tesla's original announcement and in most subsequent press coverage (Videocardz, HPCWire, Data Center Dynamics); The Next Platform's Hot Chips writeup separately cites a 20-exaflops figure for the full system that looks like an outlier against that widely repeated 1.1 EFLOP figure, so rpeak here uses 1.1 EFLOP (1,100 PFLOP) and flops_basis is vendor_peak rather than hpl_measured, since Dojo was never submitted to TOP500. The exact site was not pinned down across the sources fetched: early builds were associated with a 2022 test that tripped a local substation, while later scale-out plans (mid-2024) targeted Gigafactory Texas, so no site_id is recorded here. Tesla disbanded the Dojo team and shut the program down in August 2025 (confirmed independently by TechCrunch and Electrek), with Elon Musk calling Dojo 2 'an evolutionary dead end' in favor of the AI6 inference chip; Tesla's separate, Nvidia-GPU-based Cortex cluster (see tesla-cortex) is what absorbed the training workload. A Dojo 3 revival was reported in early 2026 but is not yet documented well enough by independent sources to add as its own row.

Timeline

  • 2021-08-19 Announced source
  • 2022 Load testing of Dojo cabinets pushed the system over 2 MW and tripped the local Palo Alto substation, Tesla said at AI Day 2022 source
  • 2022-09-30 At AI Day 2022 Tesla said its first Dojo cabinet was installed and it was building one training tile per day, aiming for a full ExaPOD by Q1 2023 and seven ExaPODs in Palo Alto source
  • 2023-07 First operational source
  • 2024-01-26 Tesla announced plans to spend $500 million to build a Dojo supercomputer in Buffalo source
  • 2024-04-30 Tesla said at TSMC's North American Technology Symposium that its next-generation D2 training tile, which puts a whole tile on one silicon wafer, was in production source
  • 2024-07-23 Musk said Dojo 1 would have roughly 8,000 H100-equivalents of training compute online by the end of 2024 source
  • 2025-08 Decommissioned source
  • 2025-08-06 Bloomberg reported that close to 20 Dojo workers had left Tesla to start their own company, DensityAI source

Change history

Same operator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
techcrunch.comnames system, part and countTesla Dojo D1 · counts: 3000
nextplatform.comnames system and partTesla Dojo D1

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Related news

  • DensityAI: Chip startup founded by former Tesla Dojo execs valued at $10bn – report · Data Center Dynamics
    Former leads of Tesla's Dojo chip program, shut down in August 2025, have founded DensityAI, reportedly raising a $10bn-valuation round with a performance-contingent purchase agreement from AWS for a new accelerator built around 3D-stacked DRAM -- a concrete example of an abandoned in-house chip effort seeding an independent merchant-silicon entrant. Sourced to a single outlet (The Information) with Amazon, Andreessen Horowitz and DensityAI all declining to confirm the details, so treat as reported rather than verified.