Supercomputers/Systems/Qingdao AI Computing Center
China · operational · ai training
Qingdao AI Computing Center
Also known as Qingdao Artificial Intelligence Computing Center
Operated by Qingdao Laoshan Technology Innovation Group at Qingdao AI Industrial Park Site .
Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- 100.0 PFlop/s
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Built on Huawei's Ascend AI platform with Laoshan District and a local technology company | Huawei | - | Reported | news.cn |
| Accelerator | Huawei Ascend 910 Accelerators Da Vinci · 7 nm · 310 W Huawei Atlas 900 AI training cluster with Ascend 910 processors, 100 P first phase | Huawei | - | Reported | xcc.com |
The read
Shandong's first large AI computing centre, in Laoshan District, Qingdao: construction started 15 May 2022, trial operation began in November 2022 and the centre launched officially on 23 February 2023 with a first phase of 100 P (Xinhua). It uses Huawei Atlas 900 AI training clusters with Ascend 910 processors, with about 3.9 billion yuan of investment, and had more than 80 P of capacity in operation (xcc.com). Xinhua names the operator as Qingdao Laoshan Technology Innovation Development Group. The 'P' figure is a low-precision AI unit. Power is not stated.
Site & facility
Change history
- 2026-10-02 Added Qingdao AI Computing Center, 100 P on Ascend 910
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
Every source cited on this page was readable, and none of them mentions this system. They are cited at page granularity, normally because no stable deep link could be found. That is a real weakness in this row and it is why the system carries a confidence tier below verified. See how this check works.
| Cited source | Result | Found on the page |
|---|---|---|
| news.cn | does not name this system | - |
| xcc.com | does not name this system | - |
Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.