Supercomputers/Systems/Khazna-Eni Ferrera Erbognone Campus
Italy · planned · mixed
Khazna-Eni Ferrera Erbognone Campus
Also known as Khazna Eni Milan AI campus
Operated by Khazna Data Centers at Khazna-Eni Ferrera Erbognone Site .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1350 of 1540 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - Khazna Data Centers designs the phased 500 MW master plan with Eni | Khazna Data Centers
rolls up to G42 | - | Reported | rcrwireless.commiddleeastainews.com |
| Power | - Eni blue power from a new combined cycle gas plant with CO2 capture | Eni | - | Reported | rcrwireless.commiddleeastainews.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| IT power | 500 MW | 2025-07 | Design target | Up to 500 MW of IT capacity under the heads of terms | rcrwireless.com |
How it is powered
| Source | Provider | MW | Status | As of | Basis | Note | Source link |
|---|---|---|---|---|---|---|---|
| Utility gas plant | Eni | - | planned | 2025-07 | Operator stated | Eni 'blue power' from a new high-efficiency combined cycle gas plant with CO2 capture; MW not stated | rcrwireless.commiddleeastainews.com |
How AI campuses are powered: capacities are what the operator, utility or filing states, not what has been delivered.
The read
Planned 500 MW IT capacity AI and HPC campus at Ferrera Erbognone in Lombardy, from a July 2025 heads of terms between Khazna Data Centers (a G42 subsidiary) and Eni to form a joint venture. Eni would supply low-carbon 'blue power' from a new high-efficiency combined cycle gas plant with CO2 capture. Both trade pieces call it the first phase of a programme aiming at 1 GW of capacity in Italy, which followed the February 2025 Eni, MGX and G42 letter of intent; Middle East AI News is internally inconsistent on the wider target, giving 1 GW in one section and 2 GW in another. No construction dates, chips or racks have been disclosed. Eni's separate Green Data Center in the same town hosts the hpc7 supercomputer.
Timeline
- 2025-07 Announced source
Site & facility
Khazna-Eni Ferrera Erbognone Site
- Location
- Ferrera Erbognone, Italy
Change history
- 2026-10-17 Added Khazna-Eni Ferrera Erbognone Campus (Khazna Data Centers)
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| middleeastainews.com | names system only | - |
| rcrwireless.com | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.