Supercomputers/Systems/GOSAT-2 RCF2
Japan · operational · hpc
GOSAT-2 RCF2
Also known as Research Computation Facility for GOSAT-2
Operated by NIES .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 770.40 TFlop/s
- Rpeak
- 1.24 PFlop/s
- Rmax ÷ Rpeak
- 62.1%
- Cores
- 16,320
- Power
- 78.64 kW
- Per watt
- 9.8 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of GOSAT-2 RCF2, and those in Japan. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 770.40 TFlop/s | #160 of 242 · bottom 35% | #81 of 131 · bottom 39% |
| Energy efficiency | 9.8 GF/W | #14 of 176 · top 7% | #25 of 74 · top 33% |
| Rmax ÷ Rpeak | 62.1 % | #189 of 238 · bottom 22% | #108 of 130 · bottom 18% |
| Power draw | 79 kW | #169 of 178 · bottom 6% | #66 of 74 · bottom 12% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - SGI Rackable C1104-GP1 supplied by NSSOL/HPE | Hewlett Packard Enterprise | - | Reported | top500.orggosat-2.nies.go.jp |
| Accelerator | NVIDIA Tesla P100 Accelerators CUDA (Pascal GP100) · 3,584C · 1.48 GHz · 16 nm · 300 W NVIDIA Pascal GPUs (Tesla P100), 900 TFlop/s theoretical peak | NVIDIA | - | Reported | gosat-2.nies.go.jptop500.org |
| CPU | Intel Xeon E5-2650 v4 CPUs x86-64 · 12C · 2.2 GHz · 14 nm Intel Xeon E5-2650 v4 12C 2.2GHz, 120 compute nodes with 2,880 CPU cores | Intel | 240 estimated | Reported | gosat-2.nies.go.jptop500.org |
| Interconnect | Mellanox InfiniBand EDR Interconnect Fat tree · 100 Gb/s per 4x port · About 0.9 microseconds InfiniBand EDR, 100 Gbps | Mellanox NVDANASDAQ
rolls up to NVIDIA | - | Reported | gosat-2.nies.go.jptop500.org |
Engineering, funding and access
What GOSAT-2 RCF2 runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Compute nodes | 120 nodes2,880 CPU cores of Xeon E5-2650 v4 with NVIDIA Pascal GPUs; the predecessor RCF had 160 nodes | 2017-06 | Operator stated | gosat-2.nies.go.jp |
| Storage capacity | 2 PBDDN SFA14K, 2 PB usable shared capacity (the predecessor RCF had 0.1 PB) | 2017-06 | Operator stated | gosat-2.nies.go.jp |
| Interconnect and topology | InfiniBand EDR, 100 Gb/s | 2017-06 | Operator stated | gosat-2.nies.go.jptop500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | EcoManager2 node management with dynamic job-to-node allocation, automatic node health checks at start-up and dynamic hot-standby node assignment | 2017-06 | Operator stated | gosat-2.nies.go.jp |
| Programming and software stack | CentOSTOP500 list entry | 2017-06 | Operator stated | top500.org |
The read
Research Computation Facility for GOSAT-2, installed by NIES in March 2016 to develop the GOSAT-2 greenhouse-gas retrieval algorithms: 120 compute nodes with Xeon E5-2650 v4 (2,880 CPU cores) and NVIDIA Pascal GPUs on Infiniband EDR with DDN SFA14K storage. NIES itself cites 9,796 MFlops/W and eighth place on the June 2017 Green500; the TOP500 entry (SGI Rackable C1104-GP1, NSSOL/HPE, 16,320 total cores, 770.4 TFlop/s Rmax on 78.64 kW, rank 221) gives the same efficiency of about 9.80 GFlops/Watt. NIES quotes a 1 PFlop/s theoretical peak against TOP500's 1.24 PFlop/s; the list value is used here. Last TOP500 appearance was June 2018.
Timeline
- 2016-03 First operational source
- 2016-09 RCF2 began serving NIES users source
- 2016-12 RCF2 opened to users outside NIES source
- 2017-06 Listed at #8 on the Green500 (June 2017) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Change history
- 2026-10-07 Added GOSAT-2 RCF2
Nearby in scale
The machines closest to GOSAT-2 RCF2 by Rmax, smaller to larger.
- ForHLR II · Germany, decommissioned · 0.77 PFlop/s
- AWE Spruce B · United Kingdom, operational · 0.77 PFlop/s
- COMA (PACS-IX) · Japan, decommissioned · 0.75 PFlop/s
- Tianhe-1A Hunan Solution · China, decommissioned · 0.77 PFlop/s
- Zin · USA, decommissioned · 0.77 PFlop/s
- XStream · USA, decommissioned · 0.78 PFlop/s
Related systems
Same accelerator
- DGX SaturnV · USA, upgraded, 2016
- Owens · USA, decommissioned, 2016
- AIST AI Cloud · Japan, operational, 2017
- Cedar (SFU) · Canada, decommissioned, 2017
- CNIC Era-AI · China, operational, 2017
- Comet · USA, decommissioned, 2015
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | Intel Xeon E5-2650 v4, NVIDIA Tesla P100, Mellanox InfiniBand EDR |
| gosat-2.nies.go.jp | names system and part | Intel Xeon E5-2650 v4, Mellanox InfiniBand EDR |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.