COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/AzInTelecom Supercomputer Center

Azerbaijan · operational · ai training

AzInTelecom Supercomputer Center

Also known as Azerbaijan National Supercomputer Center (initial phase)

Operated by AzInTelecom at AzInTelecom Supercomputer Center (Baku) .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Lenovo ThinkSystem SR680a V3 compute nodes and five ThinkSystem SR630 V3 management-cluster servers
Lenovo - Reported news.lenovo.com
Accelerator NVIDIA H200 SXM
Accelerators
CUDA (Hopper GH100) · 16,896C · 1.98 GHz · TSMC 4N · 700 W
NVIDIA H200 GPUs inside Lenovo ThinkSystem SR680a V3 servers
NVIDIA - Verified news.lenovo.comazernews.az
Interconnect NVIDIA InfiniBand NDR (Quantum-2)
Interconnect
Fat tree or dragonfly+ · 400 Gb/s per port · Under 0.6 microseconds
NVIDIA InfiniBand NDR networking at 400 Gb/s
NVIDIA - Reported news.lenovo.com
Storage -
DDN AI400X2 storage system optimized for AI workloads
DDN
- Reported news.lenovo.com

Engineering, funding and access

What AzInTelecom Supercomputer Center runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Hardware

ItemDetailAs ofBasisSource
Interconnect and topologyNVIDIA InfiniBand NDR at 400 Gb/s2026-06Vendor statednews.lenovo.com

Software

ItemDetailAs ofBasisSource
Parallel filesystemDDN AI400X2 storage systemCapacity not stated.2026-06Vendor statednews.lenovo.com
Programming and software stackNVIDIA AI Enterprise plus a dedicated orchestration layer on five Lenovo ThinkSystem SR630 V3 management servers2026-06Vendor statednews.lenovo.com

Funding

ItemDetailAs ofBasisSource
ProcurementLenovo selected through a public tender for deployment, knowledge transfer and support2026-06Vendor statednews.lenovo.com

Access

ItemDetailAs ofBasisSource
How researchers get timeIntended for public services, Azerbaijani-language platforms, cybersecurity analytics, national research, businesses and citizens; no application process is published2026-06Vendor statednews.lenovo.comazernews.az

The read

Azerbaijan's first dedicated AI supercomputer center, operated by AzInTelecom LLC (a subsidiary of AZCON Holding) and built on Lenovo ThinkSystem SR680a V3 servers with NVIDIA H200 GPUs, NVIDIA InfiniBand NDR networking at 400 Gb/s and a DDN AI400X2 storage system, per Lenovo's own press release. Established under a 19 March 2025 presidential decree approving Azerbaijan's Artificial Intelligence Strategy for 2025-2028; Azernews independently reports AzInTelecom operates from existing Tier III data centers in Baku and Yevlakh, with further sites under construction in Absheron and Hajigabul. Neither source discloses power draw, exact GPU count or a precise commissioning date, so those fields are left blank and status_as_of records the Lenovo press release date (22 June 2026) rather than an exact first-operational date. A separate National Supercomputer Center is planned for 2026 under Azerbaijan's 2026-2028 digital development action plan but is not yet a built system, so it is not recorded as a separate row.

Timeline

  • 2025-12-15 Announced source
  • 2025-12-15 AzInTelecom said it was buying more GPU chips to expand the center's capacity source

Site & facility

AzInTelecom Supercomputer Center (Baku)

Location
Baku, Azerbaijan
Commissioned
2026

Change history

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
news.lenovo.comnames system and partNVIDIA H200 SXM, NVIDIA InfiniBand NDR (Quantum-2)
azernews.aznames system and partNVIDIA H200 SXM

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading