Supercomputers/Systems/Samsung AI Megafactory
South Korea · planned · mixed
Samsung AI Megafactory
Also known as Samsung NVIDIA semiconductor AI factory
Operated by Samsung Electronics .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- -
- Rpeak
- -
- Rmax ÷ Rpeak
- -
- Cores
- -
- Power
- -
- Per watt
- - GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Accelerator | - More than 50,000 NVIDIA GPUs (lower bound; SKU split not stated, RTX PRO 6000 Blackwell Server Edition named among the hardware) | NVIDIA | 50,000 reported | Reported | nvidianews.nvidia.comtechspot.com |
Engineering, funding and access
What Samsung AI Megafactory runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | NVIDIA CUDA-X libraries with Synopsys, Cadence and Siemens EDA tools for circuit simulation, verification and manufacturing analysis | 2025-10-30 | Vendor stated | nvidianews.nvidia.com |
| Programming and software stack | NVIDIA Omniverse fab digital twins, with Isaac Sim and Cosmos world foundation models for robot training | 2025-10-30 | Vendor stated | nvidianews.nvidia.com |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | 2025: NVIDIA cuLitho integrated into Samsung's optical proximity correction lithography platform, which NVIDIA says delivered 20x greater performance (no baseline given) | 2025-10-30 | Vendor stated | nvidianews.nvidia.com |
AI datacenter metrics
Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.
| Metric | Value | As of | Basis | Note | Source |
|---|---|---|---|---|---|
| Accelerators | 50,000 accelerators | 2025-10 | Design target | 'Up to 50,000' NVIDIA GPUs planned for Samsung's AI factory, announced at APEC 31 Oct 2025. | blogs.nvidia.com |
The read
Samsung Electronics and NVIDIA announced on 30 October 2025 an AI factory of more than 50,000 NVIDIA GPUs to embed AI across Samsung's semiconductor, mobile and robotics manufacturing, including NVIDIA cuLitho and CUDA-X for optical proximity correction (a 20x computational-lithography gain is claimed), Omniverse digital twins of fabs, and Jetson Thor for robotics. NVIDIA's release names RTX PRO Servers with RTX PRO 6000 Blackwell Server Edition GPUs among the hardware but gives no per-SKU split or delivery schedule, and the buildout is described as spanning the next several years. No site is named (the existing SSC-24 and SSC-21 TOP500 clusters are a separate, already-recorded Samsung installation), no FLOPS are published, and Samsung's own newsroom page could not be fetched, so this row relies on NVIDIA's release plus TechSpot's report and stays reported.
Timeline
- 2025-10-30 Announced source
Change history
- 2026-10-04 Added AI datacenter metrics for samsung-ai-megafactory
- 2026-10-01 Added Samsung AI Megafactory (Samsung Electronics)
Nearby in scale
The machines closest to Samsung AI Megafactory by accelerator count, smaller to larger.
- Hyundai Motor Group Blackwell AI Factory · South Korea, planned · 50,000 accelerators
- Tesla Cortex · USA, operational · 50,000 accelerators
- El Capitan · USA, operational · 45,696 accelerators
- Nebius Mäntsälä Cluster · Finland, operational · 60,000 accelerators
- TELUS BC Sovereign AI Cluster · Canada, under construction · 60,000 accelerators
- SK Ulsan AI Data Center · South Korea, under construction · 60,000 accelerators
Related systems
Same operator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| nvidianews.nvidia.com | names system only | - |
| techspot.com | could not be fetched | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.