Supercomputers/Systems/Frontier TDS
USA · operational · hpc
Frontier TDS
Deep dive: Frontier: the first exaflop and its price
Also known as Frontier Test and Development System
Operated by Oak Ridge National Laboratory at Oak Ridge Leadership Computing Facility .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 19.20 PFlop/s
- Rpeak
- 23.11 PFlop/s
- Rmax ÷ Rpeak
- 83.1%
- Cores
- 120,832
- Power
- 308.68 kW
- Per watt
- 62.2 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of Frontier TDS, and those in USA. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 19.20 PFlop/s | #40 of 210 · top 19% | #32 of 332 · top 9% |
| Energy efficiency | 62.2 GF/W | #2 of 109 · top 1% | #4 of 162 · top 2% |
| Rmax ÷ Rpeak | 83.1 % | #39 of 207 · top 18% | #73 of 331 · top 22% |
| Power draw | 309 kW | #85 of 112 · bottom 25% | #118 of 171 · bottom 32% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - HPE Cray EX235a | Hewlett Packard Enterprise | - | Reported | top500.orgtop500.org |
| Accelerator | AMD Instinct MI250X Accelerators ROCm (CDNA 2) · 1.7 GHz · TSMC N6 · 560 W AMD Instinct MI250X | AMD | - | Reported | top500.org |
| CPU | AMD EPYC 7A53 (Trento) CPUs x86-64 · 64C · 2 GHz · 7 nm · 280 W AMD Optimized 3rd Generation EPYC 64C 2GHz | AMD | - | Reported | top500.org |
| Interconnect | HPE Slingshot-11 Interconnect Dragonfly · 200 Gb/s per port · Around 2 microseconds Slingshot-11 | Hewlett Packard Enterprise | - | Reported | top500.org |
| Operating system | HPE Cray Operating System Operating systems SUSE-derived Linux, container-based management · Proprietary layer over open-source Linux HPE Cray OS | Hewlett Packard Enterprise | - | Reported | top500.org |
Engineering, funding and access
What Frontier TDS runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Interconnect and topology | HPE Slingshot-11HPE Cray EX235a with AMD 3rd-generation EPYC and Instinct MI250X | 2022 | Operator stated | top500.org |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | HPE Cray OS with g++ 7.5, hipcc 5.0.2, rocBLAS, Intel MKL and HPE Cray MPI | 2022 | Operator stated | top500.org |
Results
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Notable result | Debuted at number 29 on the June 2022 TOP500 with 19.20 PFlop/s Rmax at about 309 kW | 2022-06 | Operator stated | top500.org |
The read
The test and development system for ORNL's Frontier exascale machine, described by TOP500 as one rack identical to the racks in Frontier itself. It took first place on the June 2022 Green500 at 62.68 GFlops/Watt, ahead of full Frontier, and stayed in the top seven for five consecutive editions through June 2024. TOP500 lists an HPE Cray EX235a with AMD Optimized 3rd Generation EPYC 64C and AMD Instinct MI250X on Slingshot-11, 120,832 cores, 19.20 PFlop/s Rmax and 308.68 kW, ranked 29th in June 2022. Both cited sources are TOP500 pages, so the tier stays reported.
Timeline
- 2021 First operational source
- 2022-06 Listed at #1 on the Green500 (June 2022) source
- 2022-06 Debuted at number 29 on the TOP500 at ISC22 source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Oak Ridge Leadership Computing Facility
- Location
- Oak Ridge, TN, USA
- Utility
- Tennessee Valley Authority
- Cooling
- Direct liquid cooling (warm water)
- Commissioned
- 1993
Change history
- 2026-10-02 Added Frontier TDS, ORNL's one-rack test system, No. 1 on the June 2022 Green500
Nearby in scale
The machines closest to Frontier TDS by Rmax, smaller to larger.
Related systems
Same site
- Andes (OLCF) · USA, decommissioned, 2020
- Frontier · USA, upgraded, 2022
- Gaea · USA, operational, 2023
- Summit · USA, decommissioned, 2018
- Discovery (ORNL) · USA, planned
- Lux (ORNL) · USA, planned
Same operator
- Titan · USA, decommissioned, 2012
- Jaguar · USA, upgraded, 2009
- Phoenix (ORNL) · USA, decommissioned, 2003
- Cheetah (ORNL) · USA, decommissioned, 2002
- Intel Paragon XP/S 150 · USA, decommissioned, 1995
- ORNL Paragon XP/S 35 · USA, operational, 1992
Same accelerator
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Slingshot-11, HPE Cray Operating System |
| top500.org | names system and part | AMD EPYC 7A53 (Trento), AMD Instinct MI250X, HPE Slingshot-11, HPE Cray Operating System |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.