Supercomputers/Systems/CARA
Germany · operational · hpc
CARA
Also known as Computer for Advanced Research in Aerospace
Operated by DLR at TU Dresden ZIH .
Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.
Measured performance
- Rmax
- 1.75 PFlop/s
- Rpeak
- 2.57 PFlop/s
- Rmax ÷ Rpeak
- 68.1%
- Cores
- 145,920
- Power
- 1.20 MW
- Per watt
- 1.5 GF/W
Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.
How it compares
Ranked against the other machines in this dataset that report the same figure: those that first came into service within two years of CARA, and those in Germany. Computed from our tables; a metric is ranked only when at least eight peers report it.
| Metric | Value | Against its era | Against its country |
|---|---|---|---|
| Rmax | 1.75 PFlop/s | #175 of 230 · bottom 25% | #49 of 95 · bottom 50% |
| Energy efficiency | 1.5 GF/W | #129 of 129 · bottom 1% | #53 of 68 · bottom 23% |
| Rmax ÷ Rpeak | 68.1 % | #104 of 224 · top 46% | #58 of 94 · bottom 40% |
| Power draw | 1,200 kW | #38 of 132 · top 28% | #14 of 69 · top 19% |
Every metric is ranked largest-first, so a high power-draw rank means a big power draw, not a good one. Rmax ÷ Rpeak uses HPL-measured results only. Rankings move as machines are added; they describe this dataset, not the world.
What this machine is made of
One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.
| Role | Part | Supplier at build | Quantity | Confidence | Source |
|---|---|---|---|---|---|
| Integrator | - NEC LX cluster built by NEC for DLR | NEC | - | Reported | nec.comtop500.org |
| Accelerator | - NVIDIA A100 GPUs in 10 nodes of four GPUs each | NVIDIA | 40 reported | Reported | dlr.de |
| CPU | - AMD EPYC 7601 32C 2.2GHz | AMD | - | Reported | nec.comtop500.org |
| Interconnect | NVIDIA InfiniBand HDR Interconnect Fat tree or dragonfly+ · 200 Gb/s per port · About 0.6 microseconds Mellanox HDR InfiniBand fabric in a Dragonfly+ setup | NVIDIA | - | Reported | nec.comtop500.org |
| Cooling | Direct liquid cooling, warm water Cooling Direct-to-chip cold plates, facility water loop · Removes 90+ percent of node heat to liquid Direct liquid cooling at 35 C warm water inlet temperature | NEC | - | Reported | nec.comdlr.de |
Engineering, funding and access
What CARA runs on, who paid for it and how people get time on it. Each line carries who said it and when.
Hardware
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Storage capacity | 17.1 PBDerived: 16.5 PB of hard disk plus 0.6 PB of SSD | 2026 | Operator stated | dlr.de |
| Cooling design | Water cooling at a relatively high water temperature, with waste heat planned for heating the new DLR Institute of Software Methods for Product Virtualization building about 30 m awayDLR also states up to 1.2 MW of power and an achievable PUE of 1.2 | 2026 | Operator stated | dlr.de |
Software
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Programming and software stack | GCC 8.2, AMD BLIS and OpenMPITOP500 list entry (HPL submission) | 2019-11 | Operator stated | top500.org |
Funding
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| Procurement | Owned by DLR, which says CARA ended almost two decades of leasing HPC from a service provider; data centre space and building infrastructure at TU Dresden's Lehmann Data Centre are rented from the Free State of Saxony | 2026 | Operator stated | dlr.de |
Access
| Item | Detail | As of | Basis | Source |
|---|---|---|---|---|
| How researchers get time | Available to all DLR institutes for problems that conventional PCs or servers cannot handle, such as aerodynamic simulation, AI and data analysis | 2026 | Operator stated | dlr.de |
The read
DLR's German Aerospace Center cluster, the Dresden counterpart to CARO in Gottingen, hosted and administered by the ZIH in the Lehmann Data Centre at TU Dresden. An NEC LX cluster of AMD EPYC 7601 32C 2.2GHz nodes on HDR InfiniBand with direct liquid cooling. NEC's June 2019 award announcement describes 2,300 Gigabyte compute nodes and up to 147,200 cores in a budget above 20 million euros, a Dragonfly+ HDR fabric, 116 large-memory nodes and 20 visualisation nodes; DLR's page describes 2,280 nodes plus 10 nodes with four NVIDIA A100 GPUs, up to 1.2 MW and a PUE near 1.2, which is the power figure recorded. TOP500 lists 145,920 cores, Rmax 1.75 PFlop/s and Rpeak 2.57 PFlop/s, ranking 221st on the November 2019 list and last appearing at rank 494 in November 2022. Node and core counts differ between sources; TOP500's core count is recorded.
Timeline
- 2019 First operational source
- 2019-06 Announced source
- 2019-11 Listed at #221 on the TOP500 (November 2019) source
Public list appearances
Pointers only: rank and edition, linking to the canonical entry. We do not reproduce list tables. See sourcing policy.
Site & facility
Change history
- 2026-10-07 Added CARA, DLR's EPYC cluster at TU Dresden
Nearby in scale
The machines closest to CARA by Rmax, smaller to larger.
- Quriosity (2017) · Germany, decommissioned · 1.75 PFlop/s
- Tryton Plus · Poland, operational · 1.73 PFlop/s
- Puhti · Finland, decommissioned · 1.71 PFlop/s
- Jaguar · USA, upgraded · 1.76 PFlop/s
- G42 POD3 · United Arab Emirates, operational · 1.76 PFlop/s
- RE1A (Flatiron) · USA, operational · 1.77 PFlop/s
Related systems
Same site
- AlphaCentauri · Germany, operational, 2021
- Barnard · Germany, operational, 2023
- Taurus · Germany, decommissioned, 2015
- Capella · Germany, operational, 2024
Same operator
- CARO · Germany, operational, 2021
Source check
We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.
| Cited source | Result | Found on the page |
|---|---|---|
| top500.org | names system and part | NVIDIA InfiniBand HDR |
| dlr.de | names system only | - |
Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.
Further reading
Operating a supercomputer
Acceptance testing, why "installed" and "in production" are six months apart, and the machine lifecycle.
Inside a node
Latency-optimised versus throughput-optimised processors, NUMA, and the end of the host-to-device copy.
The interconnect
Topologies, why latency and tail behaviour matter more than bandwidth, and how the fabric market consolidated.