COMPUTE ATLAS Supercomputer supply-chain graph
1153 systems 482 sites Sourced data

Supercomputers/Systems/Google TPU v4 ML Hub (Oklahoma)

USA · operational · ai training

Google TPU v4 ML Hub (Oklahoma)

Operated by Alphabet at Google Mayes County Data Center .

Phase 1 seed dataset, compiled by hand. These rows were built from public operator, laboratory and vendor sources. A mechanical second-reader pass has since fetched every cited source: 1092 of 1153 systems have a readable citation that names them, and 40 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
Rpeak
-
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Google Cloud TPU v4 Pods, Mayes County, Oklahoma datacenter
Alphabet - Reported cloud.google.com
Accelerator Google TPU v4
Accelerators
Cloud TPU v4 Pods of 4,096 chips each; eight pods reported (derived 32,768 chips)
Alphabet 32,768
estimated
Reported cloud.google.comnextplatform.com

AI datacenter metrics

Figures beyond an accelerator count, each with who stated it. What can and cannot be compared across AI datacenters.

MetricValueAs ofBasisNoteSource
PUE 1.11 2026-06 Operator stated Google trailing-twelve-month PUE for the Mayes County, Oklahoma campus at Q2 2026; per-campus TTM figure, not a fleet average. datacenters.google
PUE 1.12 2025-12 Operator stated Mayes County campus trailing twelve-month PUE at Q4 2025 (Q4 quarterly 1.09); campus-level, shared with other Google loads datacenters.google
PUE 1.1 2022-05 Operator stated Google states the Oklahoma data center hosting the Cloud TPU v4 ML hub has a PUE rating of 1.10 cloud.google.com

The read

Google Cloud's public-preview cluster of Cloud TPU v4 Pods in its Mayes County, Oklahoma datacenter, announced on 11 May 2022 as 9 exaflops of peak aggregate performance at 90 percent carbon-free energy on an hourly basis, with a datacenter PUE of 1.10. Each pod is 4,096 chips; Google's blog gives no pod count and The Next Platform, quoting Google's CEO at I/O, reports eight pods, which is consistent with 9 exaflops at about 1.1 exaflops per pod, so the 32,768-chip total is derived and marked estimated. The 9 exaflops is a bfloat16 vendor peak on a different basis from HPL, so no FLOPS are recorded. It is a separate installation from the single 4,096-chip machine in the existing Google TPU v4 supercomputer row, whose site Google does not disclose. Both sources are Google's own statement, so this stays reported.

Timeline

Site & facility

Google Mayes County Data Center

Location
Mayes County, OK, USA
PUE
1.1

Change history

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
cloud.google.comnames system and partGoogle TPU v4
nextplatform.comnames system and partGoogle TPU v4

Checked 2026-10-09 by pnpm verify. Re-run it and the table changes with the web.