COMPUTE ATLAS Supercomputer supply-chain graph
1581 systems 558 sites Sourced data

Supercomputers/Systems/Xi'an Future AI Computing Center

China · operational · ai training

Xi'an Future AI Computing Center

Also known as Xi'an Artificial Intelligence Computing Center

Operated by Xi'an Ascend Intelligent Technology at Xi'an Future AI Computing Campus .

Researched with AI assistance, checked by scripts. These rows were researched by AI agents reading public operator, laboratory and vendor sources, appended by scripts and checked by automated validation; no subject-matter expert has reviewed them (how this site is made). A mechanical second-reader pass has since fetched every cited source: 1,350 of 1,581 systems have a readable citation that names them, and 64 are genuinely weakly sourced. Every claim carries its source and a confidence tier. Treat anything below verified as a lead, not a citation.

Measured performance

Rmax
-
operator stated
Rpeak
300.0 PFlop/s
Rmax ÷ Rpeak
-
Cores
-
Power
-
Per watt
- GF/W

Figures are as last publicly reported for the configuration described below, not a live measurement. Where a system was upgraded in place, the post-upgrade configuration is shown and the earlier one appears in the timeline.

What this machine is made of

One row per supplier relationship. “Supplier at build” is the company that shipped the part at the time; where that company has since been acquired, the parent it rolls up to today is shown beside it. That distinction is what makes ticker-level aggregation possible across a thirty-year dataset.

Role Part Supplier at build Quantity Confidence Source
Integrator -
Huawei Ascend-based AI computing cluster built with Yanta District
Huawei
- Reported hiascend.com
Accelerator Huawei Ascend 910
Accelerators
Da Vinci · 7 nm · 310 W
Thousands of Ascend 910 AI processors in Huawei Atlas 900 AI clusters, 300 P AI plus 8 P HPC first phase
Huawei
- Reported tech.jrj.com.cn

Engineering, funding and access

What Xi'an Future AI Computing Center runs on, who paid for it and how people get time on it. Each line carries who said it and when.

Funding

ItemDetailAs ofBasisSource
ProcurementPlanned total of 1,000 P compute; phase 1 of 300 P AI plus 8 P HPC; total investment about 1.9 billion yuan2023-04Press reportfinance.sina.cn

Results

ItemDetailAs ofBasisSource
Notable resultWith Northwestern Polytechnical University, Xidian University and Changping Laboratory, incubated three foundation models for radar remote sensing, fluid mechanics and protein structure prediction (2023)2023-04Press reportfinance.sina.cn

The read

First large-scale AI computing cluster in northwest China, built in about four months from May 2021 and launched on 9 September 2021 according to Huawei's Ascend site, with first-phase capacity of 300 P AI plus 8 P HPC. A 2023 profile describes thousands of Ascend 910 processors in Huawei Atlas 900 AI clusters and a 98.5 percent utilisation rate. The operator is Xi'an Ascend Intelligent Technology, with about 1.9 billion yuan of total investment and a planned total of 1,000 P (Sina Finance, April 2023). The 'P' figures are low-precision AI units. Power and exact chip count are not stated in the pages fetched.

Timeline

Site & facility

Xi'an Future AI Computing Campus

Location
Xi'an, Shaanxi, China
Commissioned
2021

Change history

Same accelerator

Source check

We fetched this system's own citations and recorded whether each page actually mentions it. This is a corroboration signal, not a fact check, and it is published so you can see how well the sourcing holds up rather than take it on trust.

Cited sourceResultFound on the page
finance.sina.cnblocked our fetch-
hiascend.comnames system and partHuawei Ascend 910

Checked 2026-10-18 by pnpm verify. Re-run it and the table changes with the web.

Further reading